← Back to search

410 Ballyoulster Park , Celbridge , Co. Kildare

REFUSED

Planning application 2560662

Kildare - Kildare County Council

Proposed Development

for the construction of 2no. two-storey detached dwellings, together with independent septic tanks and percolation areas and all associated site works and landscaping to the rear. Revised by Significant Further Information which consists of: 1.no detached dwelling has been omitted. The development now comprises 1no. detached dwelling, the design of which has been revised to become a storey-and-a-half style with an adjoining single-storey garage, complete with revised landscaping, SuDs features and vehicular entrance

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    13 Jun 2025

  2. Further information requested

    1 Aug 2025

  3. Further information received

    12 Jan 2026

  4. Decision: REFUSED

    20 Feb 2026

  5. Decision due

    23 Feb 2026

Application Details

Location
410 Ballyoulster Park , Celbridge , Co. Kildare
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kildare County Council
Site Area
0.26 ha
Floor Area
349 sq m
Residential Units
2

Timeline

Registration Date
13 June 2025
Status
APPLICATION FINALISED
Decision
REFUSED
Decision Date
20 February 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

14m
2660352N/A2 Apr 2026

of (a) a two-storey detached dwelling, (b) an adjoining single-storey garage, and (c) all associated site works and landscaping to the rear

410 Ballyoulster Park , Celbridge , Co. Kildare

18m
2660391CONDITIONAL13 Apr 2026

(a) a storey and a half detached dwelling, (b) an adjoining single-storey garage, (c) a new site entrance and (d) all associated site works and landscaping to the rear of

410 Ballyoulster Park , Celbridge , Co. Kildare

27m
2461108N/A23 Oct 2024

for New dwelling to Rear of Existing Dwelling at 411 Ballyoulster Park, Celbridge, Co. Kildare and all associated ancillary works

411 Ballyoulster Park , Celbridge , Co. Kildare

39m
2461041N/A10 Oct 2024

for (A) the demolition of an existing front porch; (B) the demolition of an existing rear extension containing a kitchen, dining area and bathroom; and (C) the demolition of 2no. existing garden sheds to facilitate the construction of (D) a single-storey extension to the rear of the existing single-storey dwelling; (E) internal modifications to existing dwelling; and (F) all associated site works and landscaping

410 Ballyoulster Park , Celbridge , Co. Kildare

53m
2461052CONDITIONAL15 Oct 2024

for (A) the demolition of an existing front porch; (B) the demolition of an existing rear extension containing a kitchen, dining area and bathroom; (C) the part demolation of the existing roof; and (D) the demolition of 2no. existing garden sheds to facilitate the construction of (E) single-storey extensions to the front and rear of the existing single-storey dwelling; (F) modifications to the elevations of the existing dwelling; and (G) all associated site works and landscaping

410 Ballyoulster Park , Celbridge , Co. Kildare

65m
211002N/A8 Jul 2021

to use existing childcare facility from 8.30am -3.30pm to accommodate morning session (9am to 12 noon and afternoon session 12.15pm to 3pm). Permission to amend and increase the number of children accommodated on site to 16 children and all associated site works

407 Ballyoulster Park , Celbridge , Co. Kildare

71m
211036CONDITIONAL14 Jul 2021

to use existing childcare facility from 8.30am-3.30pm . To accommodate morning session (9am to 12 noon and afternoon session 12.15pm to 3.15pm). Permission to amend and increase the number of children accommodated on site to 16 children for each session and all associated site works

407 Ballyoulster Park , Celbridge , Co. Kildare.

88m
24362N/A15 Nov 2024

for A. 1 No Single storey detached bungalow B. all associated site works

408 Ballyoulster Park , Celbridge , Co. Kildare

89m
19702REFUSED20 Jun 2019

the change of use of part of the ground floor of existing Light Industrial Building from existing office and associated use to new Retail and associated use, for alterations to front façade to include new entrance doors, over head canopy/awning and new high level façade signage, and for minor alterations to existing car parking to front, and other minor internal and external associated works, all located

Rye River Brewing Company , Donaghcumper , Dublin Road Celbridge

98m
191068CONDITIONAL26 Sept 2019

change of use of part of the ground floor of existing Light Industrial Building from existing office & associated use to new commercial use for the storage, sorting, preparation/assembly, and distribution of flowers & flower arrangements (both for off site distribution and on line sales), for new retail sales area, & to include alterations to front façade with new entrance doors, over head canopy/awning and new high level façade signage, and for minor alterations to existing car parking to front, and other minor internal & external associated works

Rye River Brewing Co. , Donaghcumper , Dublin Road Celbridge

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?