408 Ballyoulster Park , Celbridge , Co. Kildare
N/APlanning application 24362
Kildare - Kildare County Council
Proposed Development
for A. 1 No Single storey detached bungalow B. all associated site works
View the full application file on the council's planning portal →Application Details
- Location
- 408 Ballyoulster Park , Celbridge , Co. Kildare
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Kildare County Council
- Floor Area
- 160 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 15 November 2024
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
for A. 1 No. single storey detached bungalow, B. All associated site works on site to side/rear of
No 408 Ballyoulster Park , Celbridge , Co. Kildare
to use existing childcare facility from 8.30am -3.30pm to accommodate morning session (9am to 12 noon and afternoon session 12.15pm to 3pm). Permission to amend and increase the number of children accommodated on site to 16 children and all associated site works
407 Ballyoulster Park , Celbridge , Co. Kildare
minor amendments & alterations to previously permitted development file no. 22/209, to include (a) amendments to condition no. 2 (a) to change part of ground floor front building from brewery visitor centre to similar visitor, display & demonstration centre for Veolia Water Technologies and (b) amendments to car parking to include removal of 19. no permitted car parking spaces to rear of ex. industrial building & their relocation towards front at western boundary & to include associated works to affected site boundaries, landscaping , relocation of permitted bike storage etc
Rye River Brewing Co , Donaghcumper , Dublin Road
(a) a storey and a half detached dwelling, (b) an adjoining single-storey garage, (c) a new site entrance and (d) all associated site works and landscaping to the rear of
410 Ballyoulster Park , Celbridge , Co. Kildare
to use existing childcare facility from 8.30am-3.30pm . To accommodate morning session (9am to 12 noon and afternoon session 12.15pm to 3.15pm). Permission to amend and increase the number of children accommodated on site to 16 children for each session and all associated site works
407 Ballyoulster Park , Celbridge , Co. Kildare.
of (a) a two-storey detached dwelling, (b) an adjoining single-storey garage, and (c) all associated site works and landscaping to the rear
410 Ballyoulster Park , Celbridge , Co. Kildare
change of use of part of the ground floor of existing Light Industrial Building from existing office & associated use to new commercial use for the storage, sorting, preparation/assembly, and distribution of flowers & flower arrangements (both for off site distribution and on line sales), for new retail sales area, & to include alterations to front façade with new entrance doors, over head canopy/awning and new high level façade signage, and for minor alterations to existing car parking to front, and other minor internal & external associated works
Rye River Brewing Co. , Donaghcumper , Dublin Road Celbridge
for the construction of 2no. two-storey detached dwellings, together with independent septic tanks and percolation areas and all associated site works and landscaping to the rear. Revised by Significant Further Information which consists of: 1.no detached dwelling has been omitted. The development now comprises 1no. detached dwelling, the design of which has been revised to become a storey-and-a-half style with an adjoining single-storey garage, complete with revised landscaping, SuDs features and vehicular entrance
410 Ballyoulster Park , Celbridge , Co. Kildare
for New dwelling to Rear of Existing Dwelling at 411 Ballyoulster Park, Celbridge, Co. Kildare and all associated ancillary works
411 Ballyoulster Park , Celbridge , Co. Kildare
the change of use of part of the ground floor of existing Light Industrial Building from existing office and associated use to new Retail and associated use, for alterations to front façade to include new entrance doors, over head canopy/awning and new high level façade signage, and for minor alterations to existing car parking to front, and other minor internal and external associated works, all located
Rye River Brewing Company , Donaghcumper , Dublin Road Celbridge
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?