← Back to search

No 408 Ballyoulster Park , Celbridge , Co. Kildare

CONDITIONAL

Planning application 2520

Kildare - Kildare County Council

Proposed Development

for A. 1 No. single storey detached bungalow, B. All associated site works on site to side/rear of

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    7 Feb 2025

  2. Decision: CONDITIONAL

    27 Mar 2025

  3. Decision due

    3 Apr 2025

  4. Grant issued

    9 May 2025

Application Details

Location
No 408 Ballyoulster Park , Celbridge , Co. Kildare
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kildare County Council
Site Area
0.25 ha
Floor Area
160 sq m
Residential Units
1

Timeline

Registration Date
7 February 2025
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
27 March 2025
Grant Date
9 May 2025
Permission Expires
8 May 2030

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

39m
23901CONDITIONAL18 Sept 2023

minor amendments & alterations to previously permitted development file no. 22/209, to include (a) amendments to condition no. 2 (a) to change part of ground floor front building from brewery visitor centre to similar visitor, display & demonstration centre for Veolia Water Technologies and (b) amendments to car parking to include removal of 19. no permitted car parking spaces to rear of ex. industrial building & their relocation towards front at western boundary & to include associated works to affected site boundaries, landscaping , relocation of permitted bike storage etc

Rye River Brewing Co , Donaghcumper , Dublin Road

44m
24362N/A15 Nov 2024

for A. 1 No Single storey detached bungalow B. all associated site works

408 Ballyoulster Park , Celbridge , Co. Kildare

91m
191068CONDITIONAL26 Sept 2019

change of use of part of the ground floor of existing Light Industrial Building from existing office & associated use to new commercial use for the storage, sorting, preparation/assembly, and distribution of flowers & flower arrangements (both for off site distribution and on line sales), for new retail sales area, & to include alterations to front façade with new entrance doors, over head canopy/awning and new high level façade signage, and for minor alterations to existing car parking to front, and other minor internal & external associated works

Rye River Brewing Co. , Donaghcumper , Dublin Road Celbridge

105m
211002N/A8 Jul 2021

to use existing childcare facility from 8.30am -3.30pm to accommodate morning session (9am to 12 noon and afternoon session 12.15pm to 3pm). Permission to amend and increase the number of children accommodated on site to 16 children and all associated site works

407 Ballyoulster Park , Celbridge , Co. Kildare

112m
211036CONDITIONAL14 Jul 2021

to use existing childcare facility from 8.30am-3.30pm . To accommodate morning session (9am to 12 noon and afternoon session 12.15pm to 3.15pm). Permission to amend and increase the number of children accommodated on site to 16 children for each session and all associated site works

407 Ballyoulster Park , Celbridge , Co. Kildare.

112m
2660391CONDITIONAL13 Apr 2026

(a) a storey and a half detached dwelling, (b) an adjoining single-storey garage, (c) a new site entrance and (d) all associated site works and landscaping to the rear of

410 Ballyoulster Park , Celbridge , Co. Kildare

118m
2660352N/A2 Apr 2026

of (a) a two-storey detached dwelling, (b) an adjoining single-storey garage, and (c) all associated site works and landscaping to the rear

410 Ballyoulster Park , Celbridge , Co. Kildare

130m
2560662REFUSED13 Jun 2025

for the construction of 2no. two-storey detached dwellings, together with independent septic tanks and percolation areas and all associated site works and landscaping to the rear. Revised by Significant Further Information which consists of: 1.no detached dwelling has been omitted. The development now comprises 1no. detached dwelling, the design of which has been revised to become a storey-and-a-half style with an adjoining single-storey garage, complete with revised landscaping, SuDs features and vehicular entrance

410 Ballyoulster Park , Celbridge , Co. Kildare

131m
211839N/A23 Dec 2021

development which will consist of the extension of the existing brewery premises by the construction of a new detached building comprising a single storey high bay warehouse storage structure to the rear and a 2-storey structure to the front with commercial use/brewery visitor centre to ground floor and ancillary office accommodation to first floor. To include all associated ancillary accommodation including circulation, toilet accommodation etc. Works include reorganization of existing on-site car parking and provision of additional car parking spaces, new dropped dock loading bay to rear, and amendments to circulation on site (existing vehicular entrance to site unaffected) and other associated internal and external alterations to facilitate works including new drainage connections, works to site boundaries, landscaping etc. all located

Rye River Brewing Company , Donaghcumper , Dublin Road

142m
19702REFUSED20 Jun 2019

the change of use of part of the ground floor of existing Light Industrial Building from existing office and associated use to new Retail and associated use, for alterations to front façade to include new entrance doors, over head canopy/awning and new high level façade signage, and for minor alterations to existing car parking to front, and other minor internal and external associated works, all located

Rye River Brewing Company , Donaghcumper , Dublin Road Celbridge

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?