Rye River Brewing Company , Donaghcumper , Dublin Road
N/APlanning application 211839
Kildare - Kildare County Council
Proposed Development
development which will consist of the extension of the existing brewery premises by the construction of a new detached building comprising a single storey high bay warehouse storage structure to the rear and a 2-storey structure to the front with commercial use/brewery visitor centre to ground floor and ancillary office accommodation to first floor. To include all associated ancillary accommodation including circulation, toilet accommodation etc. Works include reorganization of existing on-site car parking and provision of additional car parking spaces, new dropped dock loading bay to rear, and amendments to circulation on site (existing vehicular entrance to site unaffected) and other associated internal and external alterations to facilitate works including new drainage connections, works to site boundaries, landscaping etc. all located
View the full application file on the council's planning portal →Application Details
- Location
- Rye River Brewing Company , Donaghcumper , Dublin Road
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Kildare County Council
- Site Area
- 1.98 ha
Timeline
- Registration Date
- 23 December 2021
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
sought for development which will consist of the construction of a new detached building to the east side of the existing building comprising of a single storey high bay warehouse storage element to the rear and a 2-storey element to the front with commercial use/brewery visitor centre to ground floor and ancillary office accommodation to first floor. To include all associated ancillary accommodation including circulation, toilet accommodation etc. Works include reorganization of existing on site car parking and provision of additional car parking spaces, new dropped dock loading bay to rear, and amendments to circulation on site (existing vehicular entrance to site unaffected) and other associated internal and external alterations to facilitate works including new drainage connections, works to site boundaries, landscaping etc. all located
Rye River Brewing Company , Donaghcumper , Dublin Road
change of use of part of the ground floor of existing Light Industrial Building from existing office & associated use to new commercial use for the storage, sorting, preparation/assembly, and distribution of flowers & flower arrangements (both for off site distribution and on line sales), for new retail sales area, & to include alterations to front façade with new entrance doors, over head canopy/awning and new high level façade signage, and for minor alterations to existing car parking to front, and other minor internal & external associated works
Rye River Brewing Co. , Donaghcumper , Dublin Road Celbridge
the change of use of part of the ground floor of existing Light Industrial Building from existing office and associated use to new Retail and associated use, for alterations to front façade to include new entrance doors, over head canopy/awning and new high level façade signage, and for minor alterations to existing car parking to front, and other minor internal and external associated works, all located
Rye River Brewing Company , Donaghcumper , Dublin Road Celbridge
minor amendments & alterations to previously permitted development file no. 22/209, to include (a) amendments to condition no. 2 (a) to change part of ground floor front building from brewery visitor centre to similar visitor, display & demonstration centre for Veolia Water Technologies and (b) amendments to car parking to include removal of 19. no permitted car parking spaces to rear of ex. industrial building & their relocation towards front at western boundary & to include associated works to affected site boundaries, landscaping , relocation of permitted bike storage etc
Rye River Brewing Co , Donaghcumper , Dublin Road
of (a) a two-storey detached dwelling, (b) an adjoining single-storey garage, and (c) all associated site works and landscaping to the rear
410 Ballyoulster Park , Celbridge , Co. Kildare
(a) a storey and a half detached dwelling, (b) an adjoining single-storey garage, (c) a new site entrance and (d) all associated site works and landscaping to the rear of
410 Ballyoulster Park , Celbridge , Co. Kildare
for New dwelling to Rear of Existing Dwelling at 411 Ballyoulster Park, Celbridge, Co. Kildare and all associated ancillary works
411 Ballyoulster Park , Celbridge , Co. Kildare
for the construction of 2no. two-storey detached dwellings, together with independent septic tanks and percolation areas and all associated site works and landscaping to the rear. Revised by Significant Further Information which consists of: 1.no detached dwelling has been omitted. The development now comprises 1no. detached dwelling, the design of which has been revised to become a storey-and-a-half style with an adjoining single-storey garage, complete with revised landscaping, SuDs features and vehicular entrance
410 Ballyoulster Park , Celbridge , Co. Kildare
for A. 1 No Single storey detached bungalow B. all associated site works
408 Ballyoulster Park , Celbridge , Co. Kildare
for A. 1 No. single storey detached bungalow, B. All associated site works on site to side/rear of
No 408 Ballyoulster Park , Celbridge , Co. Kildare
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?