← Back to search

6 Power Villas , Piltown , Co. Kilkenny

REFUSED

Planning application 17693

Kilkenny - Kilkenny County Council

Proposed Development

to provide a single off street car parking space to the front of existing dwelling along with all associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    19 Oct 2017

  2. Further information requested

    12 Dec 2017

  3. Further information received

    10 Jan 2018

  4. Decision: REFUSED

    26 Jan 2018

  5. Decision due

    6 Feb 2018

Application Details

Location
6 Power Villas , Piltown , Co. Kilkenny
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kilkenny County Council
Site Area
0.01 ha

Timeline

Registration Date
19 October 2017
Status
APPLICATION FINALISED
Decision
REFUSED
Decision Date
26 January 2018

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

47m
19500CONDITIONAL18 Jul 2019

is being sought for the partial demolition of the existing single storey extensions to the rear, and proposing a one and a half storey extension to the rear. Area of existing house 81.6m2 (including the extensions to be demolished, which is 10.7m2), proposed one and a half storey extension 31.8m2, the proposed floor area and the reduced existing floor area is 102.7m2

No 4 Main Street , Piltown , County Kilkenny

70m
2560658CONDITIONAL14 Oct 2025

to convert the existing storage shed into a habitable dwelling, construct an extension to the existing building and all associated works

Banagher , Piltown , Co.Kilkenny

80m
18239CONDITIONAL17 Apr 2018

for refurbishment works to existing two storey dwelling, a protected structure, to include rearrangement of internal layout, replacement of upvc windows to front and side elevations at first floor level with timber sliding sash windows, alterations to existing lean-to at rear of property and all associated site works at

The Old Post Office , Main Street , Piltown

116m
22231CONDITIONAL11 Apr 2022

to provide off street parking and all associated works to my house site

Beech Cottage , Banagher , Main Street Piltown

161m
18111CONDITIONAL20 Feb 2018

for the demolition of an existing vacant commercial building (Foyles Garage) as well as planning permission to construct 5 no. new dwelling houses (bungalows) together with all roads, footpaths, underground services, connection to an existing foul sewer, additions to the existing surface water drainage network and all boundary treatments with all associated site development works at

Main Street , Piltown , Co. Kilkenny.

204m
19280CONDITIONAL26 Apr 2019

is sought for playground, meeting and picnic point, sensory area and associated landscaping and site works

Banagher Td , Dale (Deal) yard , Piltown

204m
2360061CONDITIONAL22 Feb 2023

to demolish the existing rear extension and construct a new single-storey rear extension, front porch and all ancillary site development works at my property

Main street , Piltown , Co. Kilkenny

236m
20411REFUSED29 Jun 2020

to construct new dormer type dwelling house, boundary treatment to new dwelling house, construction of new service site entrance, car parking spaces to rear of dwelling house and all other ancillary associated site works

Main Street , Piltown , Co Kilkenny

256m
19657CONDITIONAL13 Sept 2019

for as constructed front boundary fence and entrance gate and all associated site works

Chesterton , Tybroughney , Piltown

259m
24139CONDITIONAL18 Nov 2024

to construct a split level extension to rear of house and associated works

Main Street , Piltown , Co Kilkenny

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?