Main Street , Piltown , Co. Kilkenny
CONDITIONALPlanning application 18111
Kilkenny - Kilkenny County Council
Proposed Development
for the demolition of an existing vacant commercial building (Foyles Garage) as well as planning permission to construct 5 no. new dwelling houses (bungalows) together with all roads, footpaths, underground services, connection to an existing foul sewer, additions to the existing surface water drainage network and all boundary treatments with all associated site development works at
View the full application file on the council's planning portal →Application Timeline
Application received
20 Feb 2018
Further information requested
13 Apr 2018
Further information received
12 Nov 2018
Decision: CONDITIONAL
6 Dec 2018
Decision due
9 Dec 2018
Grant issued
17 Jan 2019
Application Details
- Location
- Main Street , Piltown , Co. Kilkenny.
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Kilkenny County Council
- Site Area
- 0.378 ha
- Floor Area
- 570 sq m
- Residential Units
- 5
Timeline
- Registration Date
- 20 February 2018
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 6 December 2018
- Grant Date
- 17 January 2019
- Permission Expires
- 16 January 2024
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
to convert the existing storage shed into a habitable dwelling, construct an extension to the existing building and all associated works
Banagher , Piltown , Co.Kilkenny
Permission to retain indefinitely sunroom, extensions to kitchen and dining room and all associated works
Carefree , Kildalton , Piltown
is sought for playground, meeting and picnic point, sensory area and associated landscaping and site works
Banagher Td , Dale (Deal) yard , Piltown
is being sought for the partial demolition of the existing single storey extensions to the rear, and proposing a one and a half storey extension to the rear. Area of existing house 81.6m2 (including the extensions to be demolished, which is 10.7m2), proposed one and a half storey extension 31.8m2, the proposed floor area and the reduced existing floor area is 102.7m2
No 4 Main Street , Piltown , County Kilkenny
to construct a split level extension to rear of house and associated works
Main Street , Piltown , Co Kilkenny
to provide a single off street car parking space to the front of existing dwelling along with all associated site works
6 Power Villas , Piltown , Co. Kilkenny
for the construction of a single storey office/enterprise building consisting of 2 number Units, connection to existing watermains, public foul and stormwater sewers with all associated site development works. The development is within the grounds of a protected structure.
Ardclone , Piltown , Co. Kilkenny
for refurbishment works to existing two storey dwelling, a protected structure, to include rearrangement of internal layout, replacement of upvc windows to front and side elevations at first floor level with timber sliding sash windows, alterations to existing lean-to at rear of property and all associated site works at
The Old Post Office , Main Street , Piltown
to provide off street parking and all associated works to my house site
Beech Cottage , Banagher , Main Street Piltown
for a 5 year planning permission for the installation of a single storey prefabricated classroom unit to the rear of the school (East) together with all associated site development works at
Piltown National School , Bessborough , Piltown
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?