IDA Ireland , Belview Science and Technology Park , Gorteens Slieverue

CONDITIONAL

Planning application 19668

Kilkenny - Kilkenny County Council

Proposed Development

for a seven year planning permission for a Continental Cheese manufacturing plant. The development will include a part single storey and part two storey production building approximately 14 metres high with intakes, processing plant and equipment, packing, stores, dispatch, offices, laboratories, utilities and personnel facilities; a 10 bay milk intake and cream dispatch building approximately 11 metres high and associated plant and equipment with office, milk testing and personnel facilities; storage silos up to 28 metres high for milk, whey and water; pipe and service bridges, salt silos and brine mixing; sprinkler storage tank and pumphouse; waste water treatment plant comprising balancing, waste water treatment and sludge drying and a truck wash; waste recovery compound and store and a monitoring building. Site development works will include earthworks; security fencing; traffic barriers; a new entrance; internal roads and paved areas; car, truck and bicycle parking; drains and services; connection to existing water main and foul drain in the Park and a treated wastewater outfall pipeline from the on site wastewater treatment plant to the existing Irish Water outfall within the Waterford City Wastewater Treatment Plant at Gorteens; attenuation ponds; fire water retention pond; site lighting; signage and landscaping. The Application also seeks retention of and alterations to the existing construction compound which will be removed on completion of the works. The development consists of an activity for which an Industrial Emissions Licence is required. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    20 Sept 2019

  2. Decision due

    14 Nov 2019

  3. Decision: CONDITIONAL

    14 Nov 2019

  4. Appeal submitted

    13 Dec 2019

  5. Appeal decided: CONDITIONAL

    30 Jun 2020

Application Details

Location
IDA Ireland , Belview Science and Technology Park , Gorteens Slieverue
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kilkenny County Council
Site Area
10.32 ha

Timeline

Registration Date
20 September 2019
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
14 November 2019
Permission Expires
29 June 2027

An Coimisiún Pleanála Appeal

Appeal Reference
ABP-306136-19
Decision
CONDITIONAL
Submitted
13 December 2019
Decided
30 June 2020

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

142m
21989CONDITIONAL3 Dec 2021

for development at this site. The development consists of the installation of a Combined Heat and Power (CHP) unit including a 7.55m high stack, stack access ladder and platform, improvements to the internal estate road and ancillary site works at the permitted cheese manufacturing plant, planning permission reference no. 19/668 (APB-306136-19). An Industrial Emissions Licence is required for the cheese manufacturing plant and the proposed development. A Natura Impact Statement will also be submitted with the application.

IDA Ireland , Belview Science and Technology Park , Gorteens Slieverue

271m
19378CONDITIONAL30 May 2019

and retention permission for development at the site situated at IDA Science and Technology Park, Gorteens, Belview, Port Road, County Kilkenny. The development will consist(s) of planning permission for a proposed new CHP plant, in lieu of boiler building from previously granted planning permission (ref 17153). Retention permission for reduction in size of Dairy Intake Building No.2 from previously granted planning permission (ref 17153), for mirroring of warehouse layout and partial increase in height of warehouse filling area from level +39.85m to +44.56m, for relocation of warehouse previously granted roof access stairs from north end of warehouse to west side of warehouse and the addition of a second warehouse roof access stairs located on the warehouse roof, for addition of cladding to evaporator stairs (previously an external stairs, planning ref 17153) and increase in height of stairs from previously approved level +47.05m (planning ref 17153) to +57.32m, for alterations to evaporator building layout including relocation of external silos from east side of building to south side, for relocation of RO Building previously granted under planning ref1419, for relocation of waste yard from the middle of the site to along the southern boundary. Amendment to previously approved planning ref 17153 for removal of extension to phase 1 Wet Process area, Cooling Tower No.2 and additional gas skid adjacent to Phase 1 Warehouse (planning ref 17153) Minor amendments to external plant and machinery, pipe bridges and ingredient silos and refrigeration plant. This application includes minor amendments to landscaping, internal road changes with lighting works, underground services, roof mounted items of plant and equipment with access platforms and ancillary external. The proposed planning permission and retentions and amendments are located within the existing site boundary of 51.01 acres (20.64 hectares approx.) This application relates to development which comprises of an activity which requires an Industrial Emissions Licence in accordance with the First Schedule of the EPA Act 1992 as amended.

IDA Science and Technology Park , Gorteens , Belview

271m
17775CONDITIONAL23 Nov 2017

to construct a screening berm at their existing Dairy Processing Facility. The development will consist of: A screening berm located on the North West corner of the site with associated landscape planting. The berm will adjacent to the North West corner having a total length of appoxinately 227m and will rise to circa 4m above existing ground level. The proposed planting scheme has been informed by the existing flora and will blend and match with the existing landscape. The proposed berm and planting will be fully located within the existing site boundary of 51.01 acres (20.64 hectares approx.) This application complements the existing development which comprises of an activity which requires an Industrial Emissions Licence in accordance with the First Schedule of the EPA Act 1992 as amended.

Gorteen , Belview Port , Port Road

277m
17153CONDITIONAL13 Mar 2017

for extensions to the existing Dairy Processing Facility. The proposed extensions will incorporate a new Warehouse similar height to existing, five storey Production Building 46.25m high, Evaporator Building similar height to existing two storey extension to the Production Building/Wet Process similar height as existing, single storey extension to the Utility Building, New Boiler Building similar height to existing (with new exhaust stack 45m), new Dairy Intake Building similar height to existing, single storey extension to the Sprinkler Building, as well as some additional other items of external plant and machinery, pipe bridges, ingredient silos and refrigeration plant. The proposed extensions also includes landscaping, internal road changes with lighting and ancillary external works, including underground services and the relocation of the existing Waste Yard and Contractor's compound, roof mounted items of plant and equipment with access platforms. In addition to this a construction compound will be formed, which on completion of construction will be removed, and the landscaping will be re-instated to match existing. The total new building area is approx. 12,043sqm. The proposed extensions are located within the existing site boundary of 51.01 acres (20.64 hectares approx.) This application relates to development which comprises of an activity which requires an Industrial Emissions Licence in accordance with the First Schedule of the EPA Act 1992 as amended. An Environment Impact Statement and a Natura Impact Statement will be submitted to the planning authority with the application

IDA Science & Technology Park , Gorteens , Belview Port Road

302m
2660676N/A23 Oct 2026

for a 10-year planning permission for a relevant solar energy development consisting of the installation of a ground-mounted solar photovoltaic plant with an approximate capacity of 1.87 MWp DC and a grid connection capacity of approximately 1.56 MW AC. The proposed development will include approximately 2,592 photovoltaic modules installed on fixed mounting structures supported by a driven pile system. The development will also comprise underground direct current and alternating current cabling, string combiner boxes, inverters, a transformer, perimeter security fencing with wildlife access points, CCTV cameras where required, associated drainage measures and all associated civil and site development works. The grid connection will be made via underground cabling to the existing on-site substation located to the southeast of the solar photovoltaic installation. The development will also include the continued use of the existing construction compound, throughout the construction and operational lifespan of the solar photovoltaic development. Upon cessation of the permitted use, the solar photovoltaic development, its associated infrastructure and the construction compound will be removed, and the affected lands will be reinstated. The Tirlán site currently operates under Industrial Emissions Licence Register No. P0963-02 and Greenhouse Gas Emissions Permit No. IE-GHG175-03. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413), and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.

Tirlán Limited , Belview Science & Technology Park , Belview Slieverue

302m
2660691N/A31 Oct 2026

for a 10-year planning permission for a relevant solar energy development consisting of the installation of a ground-mounted solar photovoltaic plant with an approximate capacity of 1.87 MWp DC and a grid connection capacity of approximately 1.56 MW AC. The proposed development will include approximately 2,592 photovoltaic modules installed on fixed mounting structures supported by a driven pile system. The development will also comprise underground direct current and alternating current cabling, string combiner boxes, inverters, a transformer, perimeter security fencing with wildlife access points, CCTV cameras where required, associated drainage measures and all associated civil and site development works. The grid connection will be made via underground cabling to the existing on-site substation located to the southeast of the solar photovoltaic installation. The development will also include the continued use of the existing construction compound, throughout the construction and operational lifespan of the solar photovoltaic development. Upon cessation of the permitted use, the solar photovoltaic development, its associated infrastructure and the construction compound will be removed, and the affected lands will be reinstated. The Tirlán site currently operates under Industrial Emissions Licence Register No. P0963-02 and Greenhouse Gas Emissions Permit No. IE-GHG175-03. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413), and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply,

Belview Science & Technology Park , Belview , Slieverue Co. Kilkenny

302m
2144CONDITIONAL29 Jan 2021

for development. The development will comprise amendments to previously approved development (Planning Ref 12/324; An Bord Pleanala Ref PL10.241077 and Planning Ref 17/153) comprising the development of two boreholes and associated works for the purpose of water abstraction for use in the Milk Processing Plant. The application also seeks permission for the continued use of the existing construction compound for the duration of the works. A Natura Impact Statement will be submitted with the Planning Application. The Glanbia Ireland DAC facility has an Industrial Emissions Licence granted by the EPA

IDA Science & Technology Park , Gorteens Port Road , Slieverue

316m
18238N/A17 Apr 2018

Permission for a temporary works area.The development will consist of a 0.14ha, 2.4m high fenced and gated compound with 4m wide access lane, hardcore yard, containing welfare site cabin, site office, lock up container, carparking and all ancillary services and associated site works to include access/egress via existing double gates with recessed access to agricultural lands off access lane via 6m temporary gates at

IDA Science & Technology Park , Gorteens , Belview

316m
18271CONDITIONAL30 Apr 2018

for a temporary works area. The development will consist of a 0.14ha., 2.4m high fenced and gated compound with 4m wide access lane, hardcore yard, containing welfare site cabin, site office, lock up container, carparking, and all ancillary services and associated site works. To include access / egress via existing double gates with recessed access to agricultural lands off access lane via 6m temporary gates

IDA Science & Technology Park , Gorteens , Belview

324m
1777CONDITIONAL13 Feb 2017

for development. The development will consist of an extension to the existing milk powder processing plant, extensions to the existing Administration Building to accommodate an enlarged food preparation area, additional personnel facilities, offices and a laboratory. The development will also include alterations to existing roads, car parks, drainage system, services and landscaped areas, a new 97 space car park, truck loading and unloading bays, paved areas and all associated drains and services including site lighting and landscaping works. The existing facility holds an industrial emissions licence issued by the Environmental Protection Agency (EPA)

the IDA Science and Technology Park , Gorteens Belview , Slieverue

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?