Murtaghstown , Slieverue , Co. Kilkenny
REFUSEDPlanning application 22581
Kilkenny - Kilkenny County Council
Proposed Development
construction of a two storey dwelling, garage, site entrance, driveway, wastewater treatment system and percolation area together with all ancillary site works
View the full application file on the council's planning portal →Application Timeline
Application received
5 Sept 2022
Decision: REFUSED
26 Oct 2022
Decision due
30 Oct 2022
Application Details
- Location
- Murtaghstown , Slieverue , Co. Kilkenny
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Kilkenny County Council
- Site Area
- 0.3 ha
- Floor Area
- 170 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 5 September 2022
- Status
- APPLICATION FINALISED
- Decision
- REFUSED
- Decision Date
- 26 October 2022
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
to erect a dwelling house, detached garage, sewage treatment system and all ancillary works
Murtaghstown , Slieverue , Co. Kilkenny
for the construction of a new dwelling, a new garage, a new driveway entrance and the installation of a new waste-water treatment system and percolation along with the associated site works
Murtaghstown , Slieverue , Co. Kilkenny
for alteration, partial demolition, renovation and extension to our existing disused dwelling plus new waste water treatment system, alterations to existing site entrance and all associated site works at
Murtaghstown , Co Kilkenny
to erect a one and half storey dwelling house, detached domestic garage, sewage treatment system and all ancillary works
Murtaghstown , Slieverue , Co. Kilkenny
to build a two storey, detached house, with single storey carport, yard and double garage, together with the installation of the necessary services, including foul drainage disposal system and deep well water supply and all associated site development works, including the building of an entrance from the adjoining public road at the junction of and through part of abandoned secondary road and also modification to roadside boundary to create the necessary entrance/exit sightlines
Murtaghstown , Slieverue , Co. Kilkenny
for the indefinite retention of existing single storey garage/workshop with roller shutter type door with adjoining single storey rear storage shed, and timber storage canopy which has been constructed to the side of existing dwelling, and also existing outbuildings, consisting of materials storage shed, dog shed, laundry and boiler house, which has been constructed to the rear of existing dwelling, together with all associated site works
Teach Eoin , Drumdowney Upper , Slieverue
for a 10 Year Planning Permission for a solar farm with a total area of circa 35 hectares in the townlands of Luffany, Murtaghstown, Curraghmore, Rathpatrick, Ballinlaw, and Drumdowney Upper in County Kilkenny. The solar farm will consist of solar panels on ground mounted frames, 6 no. single storey electrical inverter/transformer stations, 2 no. single storey spare parts containers, 5 no. battery storage containers, 1 no. Ring Main Unit, 3 no. weather stations, underground electrical ducting and cabling within the development site, private lands and L-3415, L-3414, L-3433 public roads (including 1 no. Horizontal Directional Drill under the Flour Mill Bridge) to connect solar farm field parcels, security and acoustic fencing, CCTV, access tracks, 3 no. stream/drain deck crossings, 2 no. temporary construction compounds, landscaping and all associated ancillary development and drainage works. Construction and operational vehicle access will be via 3 no. entrances from the L-3415. Sections of the proposed underground electrical cabling will traverse the solar farm proposed under Kilkenny County Council Reference 25/60391 / An Coimisiún Pleanála Reference PL10.500967, but will not alter infrastructure proposed under that application. The operational lifespan of the solar farm will be 40 years and planning permission is requested for this duration. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application. The NIS includes an assessment of the grid connection for the solar farm project comprising a 110kV electricity substation and ‘loop-in / loop-out’ underground 110kV cable grid connection which will connect into the existing Great Island to Waterford overhead line which has been lodged to An Coimisiún Pleanála (VA10.323985) and is situated in the townland of Rathpatrick, County Kilkenny. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply
townlands of Luffany Murtaghstown Curraghmore , Rathpatrick Ballinlaw and Drumdowney Upper , in County Kilkenny
for a 10 Year Planning Permission for a solar farm with a total area of circa 35 hectares in the townlands of Luffany, Murtaghstown, Curraghmore, Rathpatrick, Ballinlaw, and Drumdowney Upper in County Kilkenny. The solar farm will consist of solar panels on ground mounted frames, 6 no. single storey electrical inverter/transformer stations, 2 no. single storey spare parts containers, 5 no. battery storage containers, 1 no. Ring Main Unit, 3 no. weather stations, underground electrical ducting and cabling within the development site, private lands and L-3415, L-3414, L-3433 public roads (including 1 no. Horizontal Directional Drill under the Flour Mill Bridge) to connect solar farm field parcels, security and acoustic fencing, CCTV, access tracks, 3 no. stream/drain deck crossings, 2 no. temporary construction compounds, landscaping and all associated ancillary development and drainage works. Construction and operational vehicle access will be via 3 no. entrances from the L-3415. Sections of the proposed underground electrical cabling will traverse the solar farm proposed under Kilkenny County Council Reference 25/60391 / An Coimisiún Pleanála Reference PL10.500967, but will not alter infrastructure proposed under that application. The operational lifespan of the solar farm will be 40 years and planning permission is requested for this duration. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application. The NIS includes an assessment of the grid connection for the solar farm project comprising a 110kV electricity substation and ‘loop-in / loop-out’ underground 110kV cable grid connection which will connect into the existing Great Island to Waterford overhead line which has been lodged to An Coimisiún Pleanála (VA10.323985) and is situated in the townland of Rathpatrick, County Kilkenny. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.
townlands of Luffany Murtaghstown Curraghmore , Rathpatrick Ballinlaw and Drumdowney Upper , in County Kilkenny
to erect a dwelling house, Detached Garage, sewage treatment system & all ancillary works
Ballinlaw , Slieverue , Co. Kilkenny
to erect a dwelling house, detached garage, sewage treatment system and all ancillary works
Ballinlaw , Slieverue , Co. Kilkenny
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?