← Back to search

townlands of Luffany Murtaghstown Curraghmore , Rathpatrick Ballinlaw and Drumdowney Upper , in County Kilkenny

N/A

Planning application 2660331

Kilkenny - Kilkenny County Council

Proposed Development

for a 10 Year Planning Permission for a solar farm with a total area of circa 35 hectares in the townlands of Luffany, Murtaghstown, Curraghmore, Rathpatrick, Ballinlaw, and Drumdowney Upper in County Kilkenny. The solar farm will consist of solar panels on ground mounted frames, 6 no. single storey electrical inverter/transformer stations, 2 no. single storey spare parts containers, 5 no. battery storage containers, 1 no. Ring Main Unit, 3 no. weather stations, underground electrical ducting and cabling within the development site, private lands and L-3415, L-3414, L-3433 public roads (including 1 no. Horizontal Directional Drill under the Flour Mill Bridge) to connect solar farm field parcels, security and acoustic fencing, CCTV, access tracks, 3 no. stream/drain deck crossings, 2 no. temporary construction compounds, landscaping and all associated ancillary development and drainage works. Construction and operational vehicle access will be via 3 no. entrances from the L-3415. Sections of the proposed underground electrical cabling will traverse the solar farm proposed under Kilkenny County Council Reference 25/60391 / An Coimisiún Pleanála Reference PL10.500967, but will not alter infrastructure proposed under that application. The operational lifespan of the solar farm will be 40 years and planning permission is requested for this duration. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application. The NIS includes an assessment of the grid connection for the solar farm project comprising a 110kV electricity substation and ‘loop-in / loop-out’ underground 110kV cable grid connection which will connect into the existing Great Island to Waterford overhead line which has been lodged to An Coimisiún Pleanála (VA10.323985) and is situated in the townland of Rathpatrick, County Kilkenny. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply

View the full application file on the council's planning portal →

Application Details

Location
townlands of Luffany Murtaghstown Curraghmore , Rathpatrick Ballinlaw and Drumdowney Upper , in County Kilkenny
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kilkenny County Council
Site Area
34.8 ha

Timeline

Registration Date
3 June 2026
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
2660349N/A8 Jun 2026

for a 10 Year Planning Permission for a solar farm with a total area of circa 35 hectares in the townlands of Luffany, Murtaghstown, Curraghmore, Rathpatrick, Ballinlaw, and Drumdowney Upper in County Kilkenny. The solar farm will consist of solar panels on ground mounted frames, 6 no. single storey electrical inverter/transformer stations, 2 no. single storey spare parts containers, 5 no. battery storage containers, 1 no. Ring Main Unit, 3 no. weather stations, underground electrical ducting and cabling within the development site, private lands and L-3415, L-3414, L-3433 public roads (including 1 no. Horizontal Directional Drill under the Flour Mill Bridge) to connect solar farm field parcels, security and acoustic fencing, CCTV, access tracks, 3 no. stream/drain deck crossings, 2 no. temporary construction compounds, landscaping and all associated ancillary development and drainage works. Construction and operational vehicle access will be via 3 no. entrances from the L-3415. Sections of the proposed underground electrical cabling will traverse the solar farm proposed under Kilkenny County Council Reference 25/60391 / An Coimisiún Pleanála Reference PL10.500967, but will not alter infrastructure proposed under that application. The operational lifespan of the solar farm will be 40 years and planning permission is requested for this duration. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application. The NIS includes an assessment of the grid connection for the solar farm project comprising a 110kV electricity substation and ‘loop-in / loop-out’ underground 110kV cable grid connection which will connect into the existing Great Island to Waterford overhead line which has been lodged to An Coimisiún Pleanála (VA10.323985) and is situated in the townland of Rathpatrick, County Kilkenny. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.

townlands of Luffany Murtaghstown Curraghmore , Rathpatrick Ballinlaw and Drumdowney Upper , in County Kilkenny

225m
18145CONDITIONAL5 Mar 2018

for alteration, partial demolition, renovation and extension to our existing disused dwelling plus new waste water treatment system, alterations to existing site entrance and all associated site works at

Murtaghstown , Co Kilkenny

336m
2560391CONDITIONAL27 Jun 2025

a 10 Year Planning Permission for a solar farm with a total area of circa 189 hectares in the townlands of Atateemore or Blackneys, Ballyhobuck, Ballyrahan, Carriganurra, Charlestown, Davidstown, Drumdowney Lower, Drumdowney Upper, Gorteens, Grogan, Kilmurry, Nicholastown, Rathpatrick, Scartnamoe, Tinvaucoosh and Treanaree in County Kilkenny. The solar farm will consist of solar panels on ground mounted frames, 27 no. single storey electrical inverter/transformer stations, 5 no. single storey spare parts containers, 3 no. Ring Main Units, 5 no. weather stations, underground electrical ducting and cabling within the development site, private lands and within the L3429, L7523, L7563, L7469, L3407, L3414, L34144, L7466, L3406, L7483, L3415, N25 and N29 public roads to connect solar farm field parcels, security fencing, CCTV, access tracks, 7 no. watercourse/drain deck crossings and 4 no. horizontal directional drill crossings (under the N25 and N29 public roads and the Luffany River), temporary construction compounds, landscaping and all associated ancillary development and drainage works. Construction and operational access will be via 7 no. existing entrances from the L3429, L7469, L7466, L4783 and L34142 which will be subject to entrance upgrade works. Separate construction phase access options are proposed for Parcel 4 via Port of Waterford and the L4783. The operational lifespan of the solar farm will be 40 years and planning permission is requested for this duration. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application

In the townlands of Atateemore or Blackneys Ballyhobuck Ballyrahan Carriganurra Charlestown , Davidstown Drumdowney Lower Drumdowney Upper Gorteens Grogan Kilmurry Nicholastown , Rathpatrick Scartnamoe Tinvaucoosh and Treanaree in County Kilkenny

430m
22581REFUSED5 Sept 2022

construction of a two storey dwelling, garage, site entrance, driveway, wastewater treatment system and percolation area together with all ancillary site works

Murtaghstown , Slieverue , Co. Kilkenny

442m
22232CONDITIONAL11 Apr 2022

for the indefinite retention of as constructed single storey detached garage to the rear of my property, all with associated site development works

Curraghmore , Slieverue , County Kilkenny

454m
2584CONDITIONAL18 Aug 2025

to erect a one and half storey dwelling house, detached domestic garage, sewage treatment system and all ancillary works

Murtaghstown , Slieverue , Co. Kilkenny

460m
21454N/A25 May 2021

to build a two storey, detached house, with single storey carport, yard and double garage, together with the installation of the necessary services, including foul drainage disposal system and deep well water supply and all associated site development works, including the building of an entrance from the adjoining public road at the junction of and through part of abandoned secondary road and also modification to roadside boundary to create the necessary entrance/exit sightlines

Murtaghstown , Slieverue , Co. Kilkenny

464m
23187CONDITIONAL1 Aug 2023

for the construction of a new dwelling, a new garage, a new driveway entrance and the installation of a new waste-water treatment system and percolation along with the associated site works

Murtaghstown , Slieverue , Co. Kilkenny

495m
21598N/A12 Jul 2021

to erect a dwelling house, Detached Garage, sewage treatment system & all ancillary works

Ballinlaw , Slieverue , Co. Kilkenny

495m
20781REFUSED16 Nov 2020

to erect a dwelling house, detached garage, sewage treatment system and all ancillary works

Ballinlaw , Slieverue , Co. Kilkenny

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?