Proposed Development
to open cut extraction of 200,000m3 of sand and gravel along with site entrance and all ancillary works over an areas of 4 hectares
View the full application file on the council's planning portal →Application Details
- Location
- Kilmartin , Borris-in-Ossory , Portlaoise
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Laois County Council
Timeline
- Registration Date
- 3 December 2021
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
develop as follows: open cut extraction of 200,000m3 of sand and gravel along with site entrance and all ancillary works over an areas of 4 hectares
Kilmartin , Borris-in-Ossory , Portlaoise
retain an existing garage and sheds provided to the rear of a dwelling house and also to retain the existing site boundaries
Kilmartin , Borris-In-Ossory , Co.Laois
construct a new dwelling, garage and stables, along with a new well for portable water, a new wastewater treatment system & percolation area, enhanced site landscaping, vehicular access via an existing entrance and all ancillary infrastructure and associated site development works above and below ground level at a site of approximately 10.06ha,
Ballaghmore , Co. Laois
an agricultural structure containing handling area & livestock housing, as constructed, permission for the erection of an extension to existing livestock sheds with an underground effluent storage tank and permission for the extension of silage base & associated site works
Rockforest , Knock , Roscrea
amendment of the design of the previously approved development (reference 21261) which comprises consent for a 10 year period to construct and a 40 year period to operate a 142.7 hectare Solar PV Energy Development; amendment includes 1) slight increased in the height of the Solar PV panels, 2) slight increase in the bottom height of the Solar PV panels off the ground, 3) slight reduction in the spacing of Solar PV rows (strings), 4) slight decrease in size of solar panels, 5) slight increase in the area of transformers/inverters as a result of slight change in dimensions and 6) an increase in the number of solar panels - A Natura Impact Statement will also be submitted
Monaincha , Roscrea , Co. Tipperary
a 10 year planning permission for the construction of, and a 40 year operation and subsequent decommission of, a development consisting of a 142.7 hectare solar farm. The proposed solar farm will consist of a series of ground mounted solar photovoltaic (PV) panels, mounted on steel support structures, 34 no. electrical transformation enclosures, a temporary construction compound, underground cabling, inverters, CCTV poles and cameras, deer type security fencing around the site boundary , landscaping and biodiversity measures and all asscociated ancillary development works , for the purpose of generating renewable energy electricity. A Natura Impact Statement will also be submitted to the Planning Authority in connection with this application
Monaincha , Roscrea , Co. Tipperary
retain 1/ Material widening of an agricultural entrance and intensification of the use of the entrance for an agricultural business. 2/ 1No. Container for use as agricultural office and toilet and 2No. containers ancillary to the use of the previously approved Section 5 Mushroom Tunnel. 3/ Mobile septic tank and pump house and all ancillary works
Ballaghmore Lower , Borris in Ossory , Co. Laois.
retain the following: 1/ Material widening of an agricultural entrance and intensification of the use of the entrance for an agricultural business. 2/ 1No. Container for use as agricultural office and toilet and 2No. containers ancillary to the use of the previously approved Section 5 Mushroom Tunnel. 3/ Mobile septic tank and pump house and all ancillary works
Ballaghmore Lower , Borris in Ossory , Co. Laois.
amendment to the design of the previously approved development (Planning Reference: Tipperary County Council 21261), which comprises consent for a 10 year period to construct and a 40 year period to operate a 142.7 hectare Solar PV Energy Development to include (1) slight increase in the height of the Solar PV panels, (2) slight increase in the bottom height of the Solar PV panels off the ground, (3) slight reduction in the spacing of Solar PV rows (strings), (4) slight decrease in size of solar panels, (5) slight increase in the area of transformers/inverters as a result of slight change in dimensions and (6) an increase in the number of solar panels (A Natura Impact Statement will also be submitted)
Monaincha Townland , Roscrea , Co Tipperary
construct a new dwelling house, new domestic garage, new septic tank and percolation area, new site entrance and all associated site works
Ballaghmore Lower , Borris-in-Ossory , Co. Laois
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?