← Back to search

Monaincha , Roscrea , Co. Tipperary

N/A

Planning application 22651

Tipperary - Tipperary County Council

Proposed Development

amendment of the design of the previously approved development (reference 21261) which comprises consent for a 10 year period to construct and a 40 year period to operate a 142.7 hectare Solar PV Energy Development; amendment includes 1) slight increased in the height of the Solar PV panels, 2) slight increase in the bottom height of the Solar PV panels off the ground, 3) slight reduction in the spacing of Solar PV rows (strings), 4) slight decrease in size of solar panels, 5) slight increase in the area of transformers/inverters as a result of slight change in dimensions and 6) an increase in the number of solar panels - A Natura Impact Statement will also be submitted

View the full application file on the council's planning portal →

Application Details

Location
Monaincha , Roscrea , Co. Tipperary
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council

Timeline

Registration Date
28 November 2022
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

40m
21261CONDITIONAL3 Mar 2021

a 10 year planning permission for the construction of, and a 40 year operation and subsequent decommission of, a development consisting of a 142.7 hectare solar farm. The proposed solar farm will consist of a series of ground mounted solar photovoltaic (PV) panels, mounted on steel support structures, 34 no. electrical transformation enclosures, a temporary construction compound, underground cabling, inverters, CCTV poles and cameras, deer type security fencing around the site boundary , landscaping and biodiversity measures and all asscociated ancillary development works , for the purpose of generating renewable energy electricity. A Natura Impact Statement will also be submitted to the Planning Authority in connection with this application

Monaincha , Roscrea , Co. Tipperary

260m
22662CONDITIONAL6 Dec 2022

amendment to the design of the previously approved development (Planning Reference: Tipperary County Council 21261), which comprises consent for a 10 year period to construct and a 40 year period to operate a 142.7 hectare Solar PV Energy Development to include (1) slight increase in the height of the Solar PV panels, (2) slight increase in the bottom height of the Solar PV panels off the ground, (3) slight reduction in the spacing of Solar PV rows (strings), (4) slight decrease in size of solar panels, (5) slight increase in the area of transformers/inverters as a result of slight change in dimensions and (6) an increase in the number of solar panels (A Natura Impact Statement will also be submitted)

Monaincha Townland , Roscrea , Co Tipperary

1.0km
2360406N/A14 Jun 2023

construction of a 4.00m wide access track including crossing of the Rackethall Stream and other stream (unnamed), measuring approximately c.750m in overall length to facilitate access between two consented solar farms, those being Monaincha Solar Farm (Ref. 21261) and The Sheehy’s Solar Farm (Ref. 16/600917). The access track would be located in the townlands of Monaincha and The Sheehy, Roscrea, Co. Tipperary (Grid Easting: 618575; Northing 686630 – centre of application site). A Natura Impact Statement is submitted as part of the planning application

The Sheehy and Monaincha townlands , Roscrea , Co. Tipperary

1.2km
2360579CONDITIONAL1 Aug 2023

the construction of a 4.00m wide access track, including crossing of the Rackethall Stream and other stream (unnamed), measuring approximately c.750m in overall length to facilitate access between two consented solar farms, those being Monaincha Solar Farm (Ref. 21261) and The Sheehy’s Solar Farm (Ref. 16/600917). The access track would be located (Grid Easting: 618575; Northing 686630 centre of application site. A Natura Impact Statement is submitted as part of the planning application

The Sheehy and Monaincha Townlands , Roscrea , Co. Tipperary

1.3km
2360434N/A20 Jun 2023

a 4.00m wide access track, including crossing of the Rackethall Stream and other stream (unnamed), measuring approximately c.750m in overall length to facilitate access between two consented solar farms, those being Monaincha Solar Farm (Ref. 21261) and The Sheehy’s Solar Farm (Ref. 16/600917). The access track would be located in the townlands of Monaincha and The Sheehy, Roscrea, Co. Tipperary (Grid Easting: 618575; Northing 686630 – centre of application site). A Natura Impact Statement is submitted as part of the planning application.

The Sheehy and Monaincha townlands , Roscrea , Co. Tipperary

1.3km
21878N/A9 Aug 2022

develop as follows: open cut extraction of 200,000m3 of sand and gravel along with site entrance and all ancillary works over an areas of 4 hectares

Kilmartin , Borris-in-Ossory , Portlaoise

1.3km
21837N/A3 Dec 2021

to open cut extraction of 200,000m3 of sand and gravel along with site entrance and all ancillary works over an areas of 4 hectares

Kilmartin , Borris-in-Ossory , Portlaoise

1.6km
18453CONDITIONAL26 Jul 2018

construct a new dwelling, garage and stables, along with a new well for portable water, a new wastewater treatment system & percolation area, enhanced site landscaping, vehicular access via an existing entrance and all ancillary infrastructure and associated site development works above and below ground level at a site of approximately 10.06ha,

Ballaghmore , Co. Laois

1.7km
17600250N/A14 Mar 2017

construction of a slatted shed with crush and handling yard and all associated site works

Tinderry , Knock , Roscrea

1.7km
17600332CONDITIONAL31 Mar 2017

construction of a slatted shed with crush and handling yard and all associated site works, this development is within the curtilage of a protected structure (S384)

Tinderry , Knock , Roscrea

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?