Monaincha , Roscrea , Co. Tipperary
N/APlanning application 22651
Tipperary - Tipperary County Council
Proposed Development
amendment of the design of the previously approved development (reference 21261) which comprises consent for a 10 year period to construct and a 40 year period to operate a 142.7 hectare Solar PV Energy Development; amendment includes 1) slight increased in the height of the Solar PV panels, 2) slight increase in the bottom height of the Solar PV panels off the ground, 3) slight reduction in the spacing of Solar PV rows (strings), 4) slight decrease in size of solar panels, 5) slight increase in the area of transformers/inverters as a result of slight change in dimensions and 6) an increase in the number of solar panels - A Natura Impact Statement will also be submitted
View the full application file on the council's planning portal →Application Details
- Location
- Monaincha , Roscrea , Co. Tipperary
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Tipperary County Council
Timeline
- Registration Date
- 28 November 2022
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
a 10 year planning permission for the construction of, and a 40 year operation and subsequent decommission of, a development consisting of a 142.7 hectare solar farm. The proposed solar farm will consist of a series of ground mounted solar photovoltaic (PV) panels, mounted on steel support structures, 34 no. electrical transformation enclosures, a temporary construction compound, underground cabling, inverters, CCTV poles and cameras, deer type security fencing around the site boundary , landscaping and biodiversity measures and all asscociated ancillary development works , for the purpose of generating renewable energy electricity. A Natura Impact Statement will also be submitted to the Planning Authority in connection with this application
Monaincha , Roscrea , Co. Tipperary
amendment to the design of the previously approved development (Planning Reference: Tipperary County Council 21261), which comprises consent for a 10 year period to construct and a 40 year period to operate a 142.7 hectare Solar PV Energy Development to include (1) slight increase in the height of the Solar PV panels, (2) slight increase in the bottom height of the Solar PV panels off the ground, (3) slight reduction in the spacing of Solar PV rows (strings), (4) slight decrease in size of solar panels, (5) slight increase in the area of transformers/inverters as a result of slight change in dimensions and (6) an increase in the number of solar panels (A Natura Impact Statement will also be submitted)
Monaincha Townland , Roscrea , Co Tipperary
construction of a 4.00m wide access track including crossing of the Rackethall Stream and other stream (unnamed), measuring approximately c.750m in overall length to facilitate access between two consented solar farms, those being Monaincha Solar Farm (Ref. 21261) and The Sheehy’s Solar Farm (Ref. 16/600917). The access track would be located in the townlands of Monaincha and The Sheehy, Roscrea, Co. Tipperary (Grid Easting: 618575; Northing 686630 – centre of application site). A Natura Impact Statement is submitted as part of the planning application
The Sheehy and Monaincha townlands , Roscrea , Co. Tipperary
the construction of a 4.00m wide access track, including crossing of the Rackethall Stream and other stream (unnamed), measuring approximately c.750m in overall length to facilitate access between two consented solar farms, those being Monaincha Solar Farm (Ref. 21261) and The Sheehy’s Solar Farm (Ref. 16/600917). The access track would be located (Grid Easting: 618575; Northing 686630 centre of application site. A Natura Impact Statement is submitted as part of the planning application
The Sheehy and Monaincha Townlands , Roscrea , Co. Tipperary
a 4.00m wide access track, including crossing of the Rackethall Stream and other stream (unnamed), measuring approximately c.750m in overall length to facilitate access between two consented solar farms, those being Monaincha Solar Farm (Ref. 21261) and The Sheehy’s Solar Farm (Ref. 16/600917). The access track would be located in the townlands of Monaincha and The Sheehy, Roscrea, Co. Tipperary (Grid Easting: 618575; Northing 686630 – centre of application site). A Natura Impact Statement is submitted as part of the planning application.
The Sheehy and Monaincha townlands , Roscrea , Co. Tipperary
develop as follows: open cut extraction of 200,000m3 of sand and gravel along with site entrance and all ancillary works over an areas of 4 hectares
Kilmartin , Borris-in-Ossory , Portlaoise
to open cut extraction of 200,000m3 of sand and gravel along with site entrance and all ancillary works over an areas of 4 hectares
Kilmartin , Borris-in-Ossory , Portlaoise
construct a new dwelling, garage and stables, along with a new well for portable water, a new wastewater treatment system & percolation area, enhanced site landscaping, vehicular access via an existing entrance and all ancillary infrastructure and associated site development works above and below ground level at a site of approximately 10.06ha,
Ballaghmore , Co. Laois
construction of a slatted shed with crush and handling yard and all associated site works
Tinderry , Knock , Roscrea
construction of a slatted shed with crush and handling yard and all associated site works, this development is within the curtilage of a protected structure (S384)
Tinderry , Knock , Roscrea
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?