← Back to search

Rossmore , Killeshin , Co Laois

REFUSED

Planning application 2629

Laois - Laois County Council

Proposed Development

extend duration of PL 20/478 in regards the construct a storey and a half type dwelling, domestic garage

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    7 May 2026

  2. Decision: REFUSED

    22 Jun 2026

  3. Decision due

    1 Jul 2026

Application Details

Location
Rossmore , Killeshin , Co Laois
Applicant
N/A
Application Type
EXTENSION OF DURATION
Planning Authority
Laois County Council

Timeline

Registration Date
7 May 2026
Status
APPLICATION FINALISED
Decision
REFUSED
Decision Date
22 June 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
20478CONDITIONAL21 Sept 2020

permission for the demolition of an existing single storey dwelling, the construction of a replacement storey and a half type dwelling, a domestic garage, a bored well, a packaged wastewater treatment system and a raised polishing filter, alterations to the existing entrance and all associated site works

Rossmore , Killeshin , Carlow Co. Laois

234m
17217CONDITIONAL2 May 2017

renovate existing dwelling house, including roof alterations and re-roofing of same, permission for change of use of existing out-house to use as living accommodation, permission to construct a single-storey extension link between the outhouse and the existing dwelling, permission to upgrade existing septic tank to a proprietary treatment system with ancillary percolation area. RETENTION PERMISSION to temporarily retain existing mobile home on site, all ancillary site works and services

Skyview , Rossmore Upper , Killeshin

249m
2460446N/A26 Jul 2024

Construct a dormer style dwelling, attached single storey open double garage, new entrance, waste water treatment system and percolation area, bored well, and all associated site works.

Upper Rossmore , Co. Laois , Co. Laois

249m
2460464CONDITIONAL9 Aug 2024

construct a dormer style dwelling, attached single storey open double garage, new entrance, waste water treatment system and percolation area, bored well, and all associated site works

Upper Rossmore , Co. Laois

251m
2460231N/A9 Aug 2024

to construct a dormer style dwelling, attached single storey open double garage, new entrance, waste water treatment system and percolation area, bored well, and all associated site works

Upper Rossmore , Co. Laois

325m
20281CONDITIONAL11 Jun 2020

installation of approximately 4.6 kilometers ('km') of underground cables within Carlow County Council ('CCC') boundary and approximately 2.0km within Laois County Council ('LCC') boundary with a voltage of up to 38 kilovolts and associated works, including a new substation with LCC, for the connection of the consented Bilboa Wind Farm (Planning Register References : Carlow County Council 11/154; An Bord Pleanala PL 01.240245) to the national electricity grid; upgrading of an existing forestry track within CCC; construction of two new onsite access track within CCC; re-orientation and increasing in size of a crane hardstanding area within CCC; and road strengthening and widening along an updated turbine delivery route, within LCC, pursuant to the consented Bilboa Wind Farm (Planning Register References: Carlow County Council 11/154; An Bord Pleanala PL 01.240245). The application is accompanied by a Planning Report, Environmental Impact Assessment Report and a Natura Impact Statement

Townlands of Rossmore and Clogrennan , Co. Laois.

355m
20423CONDITIONAL17 Aug 2020

retain alterations to existing dwelling to include the conversion of an attic to use as habitable space, 1 no. roof window to front elevation, 2 no. roof windows to rear elevation, the construction of a basement, the construction of a domestic garage, and all associated site works

Barrowview , Rossmore , Killeshin Carlow

376m
2560124CONDITIONAL14 Mar 2025

construct a single storey dwelling, new entrance, wastewater treatment system and percolation area, bored well and all associated site works

Upper Rossmore , Co. Laois

398m
2460153N/A21 Mar 2024

carry out amendments to the consented (but not yet constructed) substation development permitted as part of Laois County Council Planning Reference 20/281 comprising a Revised 38kV Substation and Compound Area including a single storey control building (c5.3m height and c162sqm) and all associated electrical infrastructure and apparatus, New and Upgraded Site Entrance and Access Road and associated ancillary site development works

Rossmore , n/a , Co. Laois

398m
2460170CONDITIONAL29 Mar 2024

Amend the consented (but not yet constructed) substation development permitted as part of Laois County Council Planning Reference 20/281 comprising a Revised 38kV Substation and Compound Area including a single storey control building (c5.3m height and c162sqm) and all associated electrical infrastructure and apparatus, New and Upgraded Site Entrance and Access Road and associated ancillary site development works.

Rossmore , n/a , Co. Laois

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?