Proposed Development
construct a part single storey, part two storey, split level dwelling, detached garage, bored well, waste water treatment system and percolation area, use of existing entrance and alterations to boundary location granted under Planning Reference 24/60464 and all associated site works.
Application Timeline
Application received
13 Oct 2026
Decision due (upcoming)
7 Dec 2026
Application Details
- Location
- Upper Rossmore , Co Laois , Co Laois
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Laois County Council
- Site Area
- 0.32 ha
- Floor Area
- 262 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 13 October 2026
- Status
- NEW APPLICATION
- Decision
- N/A
- Decision Due
- 7 December 2026
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
construct a part single storey, part two storey, split level dwelling, detached garage, bored well, waste water treatment system and percolation area, use of existing entrance (granted under Planning Reference 24/60464) and all associated site works
Upper Rossmore , Co Laois , Co Laois
construct a part single storey, part two storey, split level dwelling, detached garage, bored well, waste water treatment system and percolation area, use of existing entrance (granted under Planning Reference 24/60464) and all associated site works
Upper Rossmore , Co Laois , Co Laois
to construct a dormer style dwelling, attached single storey open double garage, new entrance, waste water treatment system and percolation area, bored well, and all associated site works
Upper Rossmore , Co. Laois
Construct a dormer style dwelling, attached single storey open double garage, new entrance, waste water treatment system and percolation area, bored well, and all associated site works.
Upper Rossmore , Co. Laois , Co. Laois
construct a dormer style dwelling, attached single storey open double garage, new entrance, waste water treatment system and percolation area, bored well, and all associated site works
Upper Rossmore , Co. Laois
construct a single storey dwelling, new entrance, wastewater treatment system and percolation area, bored well and all associated site works
Upper Rossmore , Co. Laois
Amend the consented (but not yet constructed) substation development permitted as part of Laois County Council Planning Reference 20/281 comprising a Revised 38kV Substation and Compound Area including a single storey control building (c5.3m height and c162sqm) and all associated electrical infrastructure and apparatus, New and Upgraded Site Entrance and Access Road and associated ancillary site development works.
Rossmore , n/a , Co. Laois
carry out amendments to the consented (but not yet constructed) substation development permitted as part of Laois County Council Planning Reference 20/281 comprising a Revised 38kV Substation and Compound Area including a single storey control building (c5.3m height and c162sqm) and all associated electrical infrastructure and apparatus, New and Upgraded Site Entrance and Access Road and associated ancillary site development works
Rossmore , n/a , Co. Laois
permission for the demolition of an existing single storey dwelling, the construction of a replacement storey and a half type dwelling, a domestic garage, a bored well, a packaged wastewater treatment system and a raised polishing filter, alterations to the existing entrance and all associated site works
Rossmore , Killeshin , Carlow Co. Laois
extend duration of PL 20/478 in regards the construct a storey and a half type dwelling, domestic garage
Rossmore , Killeshin , Co Laois
Affected by this application?
Open for submissionsObservations close on Monday 16 November 2026, five weeks from the date the application was received. The fee is €20, and only planning grounds count.
Check if you have grounds — freeTwo questions, no payment: we'll tell you whether what concerns you is something the council can actually take into account.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?