Ballinvullin , Newcastle West , Co. Limerick

CONDITIONAL

Planning application 221276

Limerick - Limerick County Council

Proposed Development

the erection of 3905m2 of photovoltaic panels, ground mounted, on the field located at the west of the existing buildings, in our factory with all associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    1 Dec 2022

  2. Decision: CONDITIONAL

    31 Jan 2023

  3. Decision due

    3 Feb 2023

  4. Grant issued

    6 Mar 2023

Application Details

Location
Ballinvullin , Newcastle West , Co. Limerick
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Limerick County Council

Timeline

Registration Date
1 December 2022
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
31 January 2023
Grant Date
6 March 2023
Permission Expires
5 March 2028

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

129m
1734CONDITIONAL20 Jan 2017

construction of a new shop, store room, offices, toilets and conference room and all associated site works in front of existing shop building

Ballinvullin , Newcastle West , Co Limerick

132m
20848CONDITIONAL31 Aug 2020

the construction of a store room extension onto rear of existing shop/workshop building

Ballinvullin , Newcastle West , Co. Limerick

377m
2560650CONDITIONAL3 Jul 2025

existing hardcore surface. Permission is also being sought for the following: 1) the sub-division of the existing building, 2) construction of a new extension to the side of the existing building for use as a workshop and warehouse, 3) construction of a new porch to existing main entrance door to the existing building, 4) elevational changes to the existing building to include a new glazed window to an existing office on the southeast elevation, 5) relocation of Wash Bay, 6) relocation of fuel tanks, 7) relocation of water collection / storage tank, 8) proposed extension of hardstanding area, and 9) all associated site development works all

Unit 1 Ballinvullin Business Park , Newcastle West , Co. Limerick

407m
19877N/A3 Sept 2019

an extension to an existing estate road and services to business park sites and associated site works

Ballinvullin Business Park , Ballinvullin , Castlemahon Co. Limerick.

503m
21697CONDITIONAL21 May 2021

an engineering warehouse which will include a steel fabrication workshop, gantry crane, office, canteen, toilet, connection to the existing services and all associated site works

Ballinvullin Business Park , Newcastle West , Co. Limerick

637m
181037CONDITIONAL24 Oct 2018

construction of external sand ring, external lunge ring, roof structure to cover manure heap, office, waste water treatment unit and polishing filter and all ancillary site development works

Fanlehane , Castlemahon , Co. Limerick.

642m
19597CONDITIONAL21 Jun 2019

relocating and increasing the floor area of the office building, granted under planning permission ref. 18/1037 and all ancillary site development works

Fawnlehane , Castlemahon , Co. Limerick.

646m
24363CONDITIONAL19 Sept 2024

the construction of a slatted cubicle shed, walled silage slab, drafting and animal handling unit, concrete aprons and a settlement pond

Ardnacrohy , Newcastle West , Co. Limerick

687m
24167CONDITIONAL23 Apr 2024

the construction of a shed for the perpose of storing hay and straw and an extension to existing outdoor sand arena

Fawnlehane , Newcastle West , Co. Limerick

712m
2560379CONDITIONAL28 Apr 2025

demolition of dwelling house and construct 2 No single storey dwelling units, permission for the erection of 2 No advertising signs at the entrance, the installation of a waste water treatment unit, polishing filter and all ancillary site development works

Fawnlehane , Castlemahon Newcastle West , Co Limerick

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?