← Back to search

Crecora Mills , Ballinvullin , Newcastle West Co. Limerick

CONDITIONAL

Planning application 2661042

Limerick - Limerick County Council

Proposed Development

an existing ground-mounted solar photovoltaic installation comprising 1,120 no. solar panels and all associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    8 Sept 2026

  2. Decision due

    2 Nov 2026

  3. Decision: CONDITIONAL

    2 Nov 2026

Application Details

Location
Crecora Mills , Ballinvullin , Newcastle West Co. Limerick
Applicant
N/A
Application Type
RETENTION
Planning Authority
Limerick County Council
Site Area
0.59 ha

Timeline

Registration Date
8 September 2026Other applications received that week
Status
DECISION MADE
Decision
CONDITIONAL
Decision Date
2 November 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

59m
221276CONDITIONAL1 Dec 2022

the erection of 3905m2 of photovoltaic panels, ground mounted, on the field located at the west of the existing buildings, in our factory with all associated site works

Ballinvullin , Newcastle West , Co. Limerick

80m
2660975N/A25 Aug 2026

an extension to the existing ground-mounted solar photovoltaic installation, comprising 900 no. solar panels, mounted on ground-mounted support structures, together with associated cabling and all ancillary site works. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply

Crecora Mills , Ballinvullin , Newcastle West Co. Limerick

135m
1734CONDITIONAL20 Jan 2017

construction of a new shop, store room, offices, toilets and conference room and all associated site works in front of existing shop building

Ballinvullin , Newcastle West , Co Limerick

149m
20848CONDITIONAL31 Aug 2020

the construction of a store room extension onto rear of existing shop/workshop building

Ballinvullin , Newcastle West , Co. Limerick

372m
2560650CONDITIONAL3 Jul 2025

existing hardcore surface. Permission is also being sought for the following: 1) the sub-division of the existing building, 2) construction of a new extension to the side of the existing building for use as a workshop and warehouse, 3) construction of a new porch to existing main entrance door to the existing building, 4) elevational changes to the existing building to include a new glazed window to an existing office on the southeast elevation, 5) relocation of Wash Bay, 6) relocation of fuel tanks, 7) relocation of water collection / storage tank, 8) proposed extension of hardstanding area, and 9) all associated site development works all

Unit 1 Ballinvullin Business Park , Newcastle West , Co. Limerick

391m
19877N/A3 Sept 2019

an extension to an existing estate road and services to business park sites and associated site works

Ballinvullin Business Park , Ballinvullin , Castlemahon Co. Limerick.

487m
21697CONDITIONAL21 May 2021

an engineering warehouse which will include a steel fabrication workshop, gantry crane, office, canteen, toilet, connection to the existing services and all associated site works

Ballinvullin Business Park , Newcastle West , Co. Limerick

582m
181037CONDITIONAL24 Oct 2018

construction of external sand ring, external lunge ring, roof structure to cover manure heap, office, waste water treatment unit and polishing filter and all ancillary site development works

Fanlehane , Castlemahon , Co. Limerick.

591m
19597CONDITIONAL21 Jun 2019

relocating and increasing the floor area of the office building, granted under planning permission ref. 18/1037 and all ancillary site development works

Fawnlehane , Castlemahon , Co. Limerick.

635m
24167CONDITIONAL23 Apr 2024

the construction of a shed for the perpose of storing hay and straw and an extension to existing outdoor sand arena

Fawnlehane , Newcastle West , Co. Limerick

The submission window has closed

A decision issued on this application, so observations can no longer be made. Anyone who made a submission during the five-week window can appeal to An Coimisiún Pleanála within four weeks of the decision — until Monday 30 November 2026 — for a fee of €220.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?