← Back to search

Fitzgeralds Woodlands Hotel , Knockanes. , Adare

CONDITIONAL

Planning application 2460618

Limerick - Limerick County Council

Proposed Development

the relaxation room and covered walk-way, linking it to Revas Spa and for the storage building at Revas Spa

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    21 Jun 2024

  2. Further information requested

    9 Aug 2024

  3. Further information received

    12 Nov 2024

  4. Decision due

    9 Dec 2024

  5. Decision: CONDITIONAL

    9 Dec 2024

  6. Grant issued

    20 Jan 2025

Application Details

Location
Fitzgeralds Woodlands Hotel , Knockanes. , Adare
Applicant
N/A
Application Type
RETENTION
Planning Authority
Limerick County Council
Site Area
8.1 ha

Timeline

Registration Date
21 June 2024
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
9 December 2024
Grant Date
20 January 2025
Permission Expires
19 January 2030

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

10m
23265N/A23 May 2023

the relaxation room and covered walkway linking it to Revas Spa and for the storage building at Revas Spa and all ancillary site works

Fitzgeralds Woodlands Hotel , Knockanes , Adare

121m
18421CONDITIONAL3 May 2018

2 No. Poly-Tunnels. Retention is also sought for 1 No. Poly-Tunnel

Fitzgeralds Woodlands Hotel , Knockanes , Adare Co. Limerick.

158m
2561075CONDITIONAL27 Oct 2025

1. Demolition of: a) existing main vehicular entrance walls & piers; b) existing single storey office structures (47m sq) & part south facing façade to existing bedroom block, forming part of the hotel complex 2. Construction of: a) new main vehicular entrance walls & piers; b) erection of 6 no. x 6m high flagpoles at the main entrance c) extension to existing hotel building consisting of two storey bedroom block (12 bedrooms, 510m sq total), en-suite accommodation, passenger lift & stairwell, incorporating connections to existing foul & surface water infrastructure, including new SuDS drainage works and all other ancillary site works

Fitzgerald’s Woodlands House Hotel & Spa , Knockanes Adare , Co. Limerick

161m
2371N/A7 Feb 2023

the Tree House Outdoor Dining Area comprising of wooden dining cabins, the shop/kitchen building, the bar/restaurant structure, the sanitary accommodation building and 5no. storage containers and all associated site works

Fitzgeralds Woodlands Hotel , Knockanes , Adare

169m
2461104CONDITIONAL8 Nov 2024

the Tree House Outdoor Dining Area comprising of wooden dining cabins, the shop/kitchen building, the bar/restaurant structure, the sanitary accommodation building and 9 no. storage containers/structures and all associated site works

Fitzgeralds Woodlands Hotel , Knockanes , Adare Co. Limerick

179m
23169CONDITIONAL22 Mar 2023

additional office space adjacent to the reception and for the building containing the laundry, 2 no. stores and a staff canteen, located off the link corridor

Fitzgeralds Woodlands Hotel , Knockanes , Adare

189m
2461310CONDITIONAL23 Dec 2024

construction of two storey extension to existing hotel building incorporating a) Office & storage accommodation at Ground Floor Level, b) 2 no. Hotel Bedrooms at First Floor Level, c) New Passenger Lift, d) connections to existing waste water & surface water infrastructure and all associated works.

Fitzgerald’s Woodlands House Hotel & Spa , Knockanes , Adare Co. Limerick

221m
2660779N/A9 Jul 2026

the construction of staff accommodation & services buildings comprising – Building 1, 590m sq, two storey communal residence, [20 no. bedrooms & 2 no. communal areas], Building 2, 502m sq, two storey apartments, [6 no. studio & 2 no. 2 bedroom units], Building 3, 47m sq, single storey staff bicycle storage & laundry building; connections to existing private on site waste water treatment facility, landscaping including incorporation of nature-based Sustainable Drainage Systems (SuDS) & all associated works

Fitzgerald’s Woodlands House Hotel , Knockanes Adare , Co. Limerick

257m
211346N/A28 Sept 2021

a 90 kw photovoltaic ground mounted solar array

Fitzgeralds Woodlands Hotel , Knockanes , Adare Co. Limerick.

437m
17125CONDITIONAL14 Feb 2017

demolition of existing dwelling and the construction of a replacement dwelling, installation of a proprietary treatment system and polishing filter, and all associated site works

Knockanes , Adare , Co Limerick

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?