The development consists of a new children’s hospice, which will provide specialist palliative day and in-patient services, respite, and end-of-life care. The building will consist of day rooms, shared therapies including a hydrotherapy suite, 8 no. inpatient bedrooms, 4 no. family overnight bedrooms, associated ancillary areas, staff offices, dining room, contemplation room and family gathering room, along with plant, waste, and storage areas. The proposed building is primarily single storey with part two storey to the front of the building. The development will consist of a new vehicular entrance and pedestrian access routes, landscaped therapy gardens, 43 vehicular parking spaces, bicycle stand, designated external services area, ESB substation, renewable energy sources, and plant at roof level, new connection to public sewer and all ancillary site development works.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    23 Jun 2026

  2. Decision due

    17 Aug 2026

Application Details

Location
Moneenbradagh , Castlebar , Mayo
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Mayo County Council
Site Area
0.65 ha

Timeline

Registration Date
23 June 2026
Status
NEW APPLICATION
Decision
N/A
Decision Due
17 August 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

139m
18226CONDITIONAL3 Apr 2018

CONSTRUCTION OF A PUBLIC CIVIC AMENITY CENTRE INCLUDING PARKING, ENTRANCE/EXIT, LANDSCAPING, BOUNDARY TREATMENT, LIGHTS, SIGNAGE, CONNECTION INTO EXISTING SERVICES AND ALL ANCILLARY ISTE WORKS

MONEENBRADAGH , CASTLEBAR , CO. MAYO

142m
2360466CONDITIONAL7 Nov 2023

Permission for development at Castlebar Primary Care Centre, Moneen Road, Moneenbradagh, Castlebar, Co. Mayo, F23 XV04 consisting of amendments to the permitted extension (Reg. Ref: P18/640 refers) to the existing Primary Care Centre. The development will consist of: 1. Expanded footprint of extension at ground and first floor involving an additional 227 sqm gross floor space; 2. Internal reconfiguration of room/circulation layout at ground and first floor (and associated elevational changes); 3. Reconfiguration of ‘courtyard’ area enclosed by existing and extended Primary Care Centre; 4. Provision for rooftop mounted solar panel arrays and plant enclosures; and, 5. Associated and ancillary works including enabling works to existing Primary Care Centre building.

Castlebar Primary Care Centre Moneen Road , Moneenbradagh Castlebar , Co. Mayo

172m
2560636CONDITIONAL15 Sept 2025

Application is being made to Mayo County Council on behalf of Intersport Elvery’s for planning permission to construct storage warehouse ancillary to the existing facility at Moneenbradagh, Moneen Road, Castlebar, Co Mayo including all ancillary site works and services

Moneenbradagh , Moneen Road , Castlebar Co Mayo

173m
18640CONDITIONAL20 Aug 2018

CONSTRUCT A 2 STOREY 3,907SQM EXTENSION TO THE EXISTING PRIMARY CARE CENTRE, (P13/12500 REFERS) WITH ALL ANCILLARY AND ASSOCIATED WORKS

MONEENBRADAGH , CASTLEBAR , CO. MAYO

200m
18327CONDITIONAL10 May 2018

CONSTRUCT NEW ENTRANCE/EXIT WITH ASSOCIATED ADJUSTMENTS TO BOUNDARY TREATMENT, FOOTPATHS, LANDSCAPING, LIGHTING, SIGNAGE AND ALL ANCILLARY SITE WORKS

MONEENBRADAGH , CASTLEBAR , CO. MAYO

200m
20760CONDITIONAL15 Oct 2020

CONSTRUCT AN EXTENSION TO EXISTING DISTRIBUTION AND WAREHOUSE FACILITY. THE EXTENSION FLOOR AREA IS 4496SQM IN TOTAL, WITH AN EXTERNAL HEIGHT OF 14M. THE EXTENSION IS TO BE CONSTRUCTED IN 2 PHASES. PHASE 1 IS 2996SQM AND PHASE 2 IS 1500SQM. THE BUILDINGS WILL CONTAIN WAREHOUSE AND DISTRIBUTION SPACE INCLUDING DOCK LEVELLERS WIRH OFFICES, RECEPTION, CHANGING ROOMS, A GYMNASIUM, CRECHE AND ANCILLARY FACILITIES. ADDITIONAL STAFF AND VISITOR PARKING WILL BE INCLUDED IN THE SITE LAYOUT.

MONEENBRADAGH , CASTLEBAR

209m
24365N/A5 Sept 2024

Section 5 Declaration: refurbishment of existing derelict house and rear extension

19 Moneenbraddagh , Castlebar

211m
19706CONDITIONAL6 Sept 2019

CHANGE OF USE OF EXISTING MANUFACTURING TO GROUND FLOOR OFFICE SPACE, TOGETHER WITH A FIRST FLOOR MEZZANINE FLOOR FOR WAREHOUSING AT REAR OF EXISTING BUILDING, P16/572 AND P07/739 REFERS. THESE WORKS TO BE CARRIED OUT TOGETHER WITH ASSOCIATED SITE SERVICES

CASTLEBAR TECHNOLOGY PARK , MONEEN ROAD , DRUMCONLAN

214m
2660374CONDITIONAL12 May 2026

Generator and fuel storage including an enclosure and all associated and ancillary works at Castlebar Primary Care Centre, Moneenbradagh, Castlebar, Co. Mayo

moneenbradagh , Castlebar , Co. Mayo

233m
23462CONDITIONAL16 Aug 2023

ESB substation building with switch room and all associated and ancillary works

Moneenbradagh , Castlebar

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?