BALLYDUFF TOWNLAND , TULLAMORE , CO. OFFALY
CONDITIONALPlanning application 1711
Offaly - Offaly County Council
Proposed Development
A 10 YEAR PERMISSION (TO CONSTRUCT DEVELOPMENT). THE DEVELOPMENT WILL CONSIST OF A SOLAR FARM COMPRISING: THE INSTALLATION OF PHOTOVOLTAIC PANELS ON GROUND MOUNTED FRAMES IN ROWS ON A SITE OF C. 17.7 HECTARES, A SINGLE STOREY ESB TERMINAL STATION, A SINGLE STOREY SWITCHGEAR ENCLOSURE AS WELL AS 2 NO. SINGLE STOREY STORAGE CONTAINERS, 8 NO. SINGLE STOREY INVERTER STATIONS, DUCTING AND UNDERGROUND ELECTRICAL CABLING, PERIMETER FENCING, 10 NO. MOUNTED CCTV CAMERAS, USE OF EXISTING ACCESS FROM THE R420 AND PROVISION OF INTERNAL ACCESS TRACKS, AND ALL ASSOCIATED SITE DEVELOPMENT (INCLUDING MINOR RE-PROFILING TO EXISTING LEVELS OF C. 0.5 HECTARES), AND LANDSCAPING WORKS
Application Timeline
Application received
16 Jan 2017
Further information requested
10 Mar 2017
Further information received
3 Jul 2017
Decision: CONDITIONAL
28 Jul 2017
Decision due
30 Jul 2017
Grant issued
31 Aug 2017
Application Details
- Location
- BALLYDUFF TOWNLAND , TULLAMORE , CO. OFFALY
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Offaly County Council
- Site Area
- 17.7 ha
Timeline
- Registration Date
- 16 January 2017
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 28 July 2017
- Grant Date
- 31 August 2017
- Permission Expires
- 30 August 2027
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
THE EXTENSION OF THE OPERATIONAL LIFESPAN OF A SOLAR FARM PERMITTED BY OFFALY COUNTY COUNCIL UNDER REG. REF. 17/11 FROM 30 NO. YEARS AS PERMITTED (BY REASON OF CONDITION NO. 2 OF PERMISSION REG. REF. 17/11) TO 40 NO. YEARS
BALLYDUFF , TULLAMORE , CO. OFFALY
Permission for retention of changes to an existing vehicular entrance off the R420 to facilitate the construction of the Solar PV Farm permitted under Planning Ref. 17/11 and changes to the same previously permitted Solar Farm consisting of the reconfiguration of an internal access track resulting in a decrease in the footprint of the solar array. Permission is also sought for the completion of works at the vehicular entrance off the R420 to facilitate the operational and decommissioning phases of the permitted Solar PV Farm on lands at Ballyduff (Townland), Tullamore, Co. Offaly.
Ballyduff (Townland) , Tullamore , Co. Offaly
changes to an existing vehicular entrance off the R420 to facilitate the construction of the Solar PV Farm permitted under Planning Ref. 17/11 and changes to the same previously permitted Solar Farm consisting of the reconfiguration of an internal access track resulting in a decrease in the footprint of the solar array. Permission is also sought for the completion of works at the vehicular entrance off the R420 to facilitate the operational and decommissioning phases of the permitted Solar PV Farm on lands
Ballyduff (Townland) , Tullamore , Co. Offaly
THE REPLACEMENT OF A PERMITTED SINGLE STOREY TERMINAL ELECTRICAL STATION AND SEPARATE PERMITTED SWITCHGEAR ENCLOSURE (BOTH PREVIOUSLY PERMITTED AS PART OF A SOLAR FARM PERMISSION BY OFFALY COUNTY COUNCIL UNDER PLANNING REF. 17/11) WITH I NO. PROPOSED SINGLE STOREY 20KV SUBSTATION BUILDING ON THE SITE OF THE PREVIOUSLY PERMITTED TERMINAL STATION AND SWITCHGEAR ENCLOSURE
TOWNLAND OF BALLYDUFF , TULLAMORE , CO. OFFALY
AND RELOCATION OF EXISTING CONTAINERS FOR USE ANCILLARY TO THE BUSINESS. PERMISSION FOR: CONSTRUCTION OF A NEW EXTENSION TO EXISTING AGRICULTURAL SHED FOR STORAGE USE, A NEW AGRICULTURAL DRYING SHED WITH ANCILLARY DRYING FACILITIES, A NEW WOOD CHIP STORAGE AREA BOILER AND CHIMNEY, NEW ENCLOSURE TO EXISTING HOPPER AND NEW WEIGHBRIDGE STATION DEMOLITION EXISTING FORMER AGRICULTURAL FARM WALLS & SHEDS EXTENSION OF EXISTING GRAVEL YARD TO ACCOMMODATE VEHICLE TURNING ALL ASSOCIATED SITE DEVELOPMENT WORKS TO COMPLETE THE DEVELOPMENT
BALLYDUFF CLARA ROAD , TULLAMORE , CO. OFFALY
(1) CHANGE OF USE OF EXISTING SHEDS TO INDUSTRIAL USE FOR THE STORING, PROCESSING AND PACKAGING OF FOREST PRODUCTS. (2) EXISTING CONTAINER UNITS FOR USE AS OFFICE AND RELOCATION OF THESE OFFICES ON THE SITE FOR USE ANCILLARY TO THE BUSINESS. PERMISSION FOR: (1) CONSTRUCTION OF A NEW EXTENSION TO EXISTING STORAGE SHED, A NEW DRYING SHED WITH ANCILLARY DRYING FACILITIES, A NEW WOOD CHIP STORAGE AREA, BOILER AND CHIMNEY, NEW ENCLOSURE TO EXISTING HOPPER AND NEW WEIGHBRIDGE STATION. (2) DEMOLITION EXISTING FORMER AGRICULTURAL FARM WALLS & SHEDS. (3) EXTENSION OF EXISTING GRAVEL YARD TO ACCOMMODATE VEHICLE TURNING. (4) NEW EFFLUENT TREATMENT SYSTEM AND PERCOLATION AREA. (5) ALL ASSOCIATED SITE DEVELOPMENT WORKS TO COMPLETE THE DEVELOPMENT. THE PROPOSED DEVELOPMENT CONSISTS OF WORKS WITHIN THE CURTILAGE OF A PROTECTED STRUCTURE
BALLYDUFF CLARA ROAD , TULLAMORE , CO. OFFALY
AND RELOCATION OF EXISTING CONTAINERS FOR USE ANCILLARY TO THE BUSINESS. PERMISSION FOR (I) CONSTRUCTION OF A NEW EXTENSION TO EXISTING AGRICULTURAL SHED FOR STORAGE USE, A NEW AGRICULTURAL DRYING SHED WITH ANCILLARY DRYING FACILITIES, A NEW WOOD CHIP STORAGE AREA, BOILER AND CHIMNEY, NEW ENCLOSURE TO EXISTING HOPPER AND NEW WEIGHBRIDGE STATION (II) DEMOLITION EXISTING FORMER AGRICULTURAL FARM WALLS & SHEDS (III) EXTENSION OF EXISTING GRAVEL YARD TO ACCOMMODATE VEHICLE TURNING (IV) NEW EFFLUENT TREATMENT SYSTEM AND PERCOLATION AREA, (V) ALL ASSOCIATED SITE DEVELOPMENT WORKS TO COMPLETE THE DEVELOPMENT. THE PROPOSED DEVELOPMENT CONSISTS OF WORKS WITHIN THE CURTILAGE OF A PROTECTED STRUCTURE
BALLYDUFF CLARA ROAD , TULLAMORE , CO. OFFALY
DOMESTIC GARAGE AND FUEL SHED, AS CONSTRUCTED AND ALL ASSOCIATED SITE SERVICES.
MUINIAGH , BALLYDUFF , CO. OFFALY
CONSTRUCTION OF A SINGLE STOREY DWELLING, DOMESTIC GARAGE, SEPTIC TANK, EFFLUENT TREATMENT SYSTEM AND PERCOLATION AREA AND ALL ASSOCIATED WORKS
BALLYDUFF , TULLAMORE , CO OFFALY
A. Restoration of the existing derelict farmhouse, including the demolition of the current utility room and pantry at the rear, and the construction of a new contemporary-style dormer extension on the east side of the farmhouse. B. Conversion of an existing disused shed into a home office, WC, and storage area for domestic use. C. Construction of six new single-storey holiday let units in a traditional courtyard layout, consisting of 2 no. two-bedroom units and 4 no. one-bedroom units. D. Construction of a new hot tub pavilion in the centre of the courtyard, featuring a small sauna and steam room. E. Installation of a new sewage treatment plant and percolation area to manage waste from the main house, home office, and holiday lets. F. Upgrade of the existing vehicular entrance, including the addition of new gravel, stone piers, and entrance gates. G. Site landscaping and all associated site works.
MUINIAGH , TULLAMORE , CO. OFFALY
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?