← Back to search

ASHMOUNT HOUSE , BALLYBOUGHLIN , CLARA CO. OFFALY R35 XV29

CONDITIONAL

Planning application 17418

Offaly - Offaly County Council

Proposed Development

THE CONSTRUCTION OF A NEW POLYTUNNEL (CIRCA. 1370 M2) AND ALL ASSOCIATED SITE WORKS AND SERVICES. THE PROPOSED DEVELOPMENT IS WITHIN THE CURTILAGE OF A PROTECTED STRUCTURE RPS 12-61, NIAH 14908002

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    24 Oct 2017

  2. Decision: CONDITIONAL

    6 Dec 2017

  3. Decision due

    18 Dec 2017

  4. Grant issued

    19 Jan 2018

Application Details

Location
ASHMOUNT HOUSE , BALLYBOUGHLIN , CLARA CO. OFFALY R35 XV29
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Offaly County Council
Site Area
2.38 ha

Timeline

Registration Date
24 October 2017
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
6 December 2017
Grant Date
19 January 2018
Permission Expires
18 January 2023

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

278m
20323CONDITIONAL27 Jul 2020

CONSTRUCTION OF A TWO-STOREY DWELLING (268.4SQ M) & DOMESTIC GARAGE (27SQ M) AND FOR A NEW DOMESTIC ENTRANCE ONTO THE PUBLIC ROADWAY. PERMISSION IS ALSO SOUGHT FOR THE INSTALLATION OF A PACKAGED WASTEWATER TREATMENT SYSTEM AND PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS

RAHEEN , CLARA , CO. OFFALY

616m
2360072CONDITIONAL18 Aug 2023

retrofit, extend and alter existing dwelling and all associated site works. Permission is also sought for a new waste water treatment system and percolating area

Raheen , Clara , Co.Offaly

691m
2660339N/A29 Jun 2026

construction of a new dwelling, garage, new wastewater treatment system and polishing filter all associated site works

Raheen , Clara , Co. Offaly

691m
2660348N/A3 Jul 2026

a new dwelling, garage, new waste water treatment system and polishing filter all associated site works

Raheen , Clara , Co. Offaly

696m
2460197N/A1 Jun 2024

Construct a four bedroom dwelling with garage. The application will also include a new domestic entrance and boundary treatments, effluent treatment system, percolation area, associated site-works landscaping and drainage.

Raheen , Clara , Co Offaly

696m
2460210REFUSED5 Jun 2024

Construction of a four bedroom dwelling with garage. The application will also include a new domestic entrance and boundary treatments, effluent treatment system, percolation area, associated site-works landscaping and drainage.

Raheen , Clara , Co Offaly

707m
2460308N/A12 Aug 2024

The application seeks a 10-year permission with an operational lifetime of 35 years. The development will consist of: • Approximately 38,000 panels on ground mounted metal frames, with a maximum height above ground of 3.17 metres, including string inverters mounted to the rear of the panels; • 1 no. 38kV substation including 1 no. MV switch room, IPP control room, 1 no. ESB switch room, and associated electrical infrastructure; • 3 no. transformer units; • Underground cabling and ducting; • 1 no. temporary construction compound and ancillary facilities for the duration of the construction phase of the project; • Perimeter Fencing; • CCTV; • Site access provided from existing site access of Curagh Road (L20171), internal tracks, site landscaping and all associated site enabling and site development works. This planning application is accompanied by a Natura Impact Statement (NIS).

Ballyboughlin , Clara , Co. Offaly

708m
2460338CONDITIONAL3 Sept 2024

the development and operation of a c. 14MW solar photovoltaic (PV) farm at this 29.75ha site located off Curragh Road (L20171) in the townland of Clara, near Clara, Co. Offaly. The application seeks a 10-year permission with an operational lifetime of 35 years. The development will consist of: • Approximately 38,000 panels on ground mounted metal frames, with a maximum height above ground of 3.17 metres, including string inverters mounted to the rear of the panels; • 1 no. 38kV substation including 1 no. MV switch room, IPP control room, 1 no. ESB switch room, and associated electrical infrastructure; • 3 no. transformer units; • Underground cabling and ducting; • 1 no. temporary construction compound and ancillary facilities for the duration of the construction phase of the project; • Perimeter Fencing; • CCTV; • Site access provided from existing site access off Curragh Road (L20171), internal tracks, site landscaping and all associated site enabling and site development works. This planning application is accompanied by a Natura Impact Statement (NIS).

Townland of Clara , near Clara , Co. Offaly

717m
18314CONDITIONAL19 Jul 2018

DEVELOPMENT OF A SOLAR FARM. THE PROPOSED SOLAR FARM WILL COMPRISE THE CONSTRUCTION AND OPERATION OF SOLAR PV ARRAYS MOUNTED ON METAL FRAMES ON AN APPROX 29.7HA SITE, INCLUSIVE OF A SINGLE ELECTRICAL CONTROL BUILDING, UP TO 8 INVERTER UNITS, A TEMPORARY CONSTRUCTION AREA AND ANCILLARY FACILITIES, BOUNDARY SECURITY FENCE WITH CCTV UNITS, AN ACCESS TRACK, ALL ASSOCIATED WORKS (INCLUSIVE OF GROSS FLOOR SPACE OF PROPOSED WORKS UP TO 213.6SQM). THE APPLICATION IS ACCOMPANIED BY AN ENVIRONMENTAL REPORT AND STAGE 1 SCREENING FOR APPROPRIATE ASSESSMENT

IN THE TOWNLAND OF CLARA , NEAR CLARA , CO OFFALY

727m
18165CONDITIONAL13 Apr 2018

AN EXISTING SHED COMPRISING FUEL STORE AND GARDEN TOOL STORE TOGETHER WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS

RAHEEN , CLARA , CO OFFALY

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?