IN THE TOWNLAND OF CLARA , NEAR CLARA , CO OFFALY

CONDITIONAL

Planning application 18314

Offaly - Offaly County Council

Proposed Development

DEVELOPMENT OF A SOLAR FARM. THE PROPOSED SOLAR FARM WILL COMPRISE THE CONSTRUCTION AND OPERATION OF SOLAR PV ARRAYS MOUNTED ON METAL FRAMES ON AN APPROX 29.7HA SITE, INCLUSIVE OF A SINGLE ELECTRICAL CONTROL BUILDING, UP TO 8 INVERTER UNITS, A TEMPORARY CONSTRUCTION AREA AND ANCILLARY FACILITIES, BOUNDARY SECURITY FENCE WITH CCTV UNITS, AN ACCESS TRACK, ALL ASSOCIATED WORKS (INCLUSIVE OF GROSS FLOOR SPACE OF PROPOSED WORKS UP TO 213.6SQM). THE APPLICATION IS ACCOMPANIED BY AN ENVIRONMENTAL REPORT AND STAGE 1 SCREENING FOR APPROPRIATE ASSESSMENT

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    19 Jul 2018

  2. Further information requested

    11 Sept 2018

  3. Further information received

    23 Nov 2018

  4. Decision: CONDITIONAL

    19 Dec 2018

  5. Decision due

    20 Dec 2018

  6. Grant issued

    4 Feb 2019

Application Details

Location
IN THE TOWNLAND OF CLARA , NEAR CLARA , CO OFFALY
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Offaly County Council
Site Area
29.7 ha

Timeline

Registration Date
19 July 2018
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
19 December 2018
Grant Date
4 February 2019
Permission Expires
3 February 2024

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

10m
2460338CONDITIONAL3 Sept 2024

the development and operation of a c. 14MW solar photovoltaic (PV) farm at this 29.75ha site located off Curragh Road (L20171) in the townland of Clara, near Clara, Co. Offaly. The application seeks a 10-year permission with an operational lifetime of 35 years. The development will consist of: • Approximately 38,000 panels on ground mounted metal frames, with a maximum height above ground of 3.17 metres, including string inverters mounted to the rear of the panels; • 1 no. 38kV substation including 1 no. MV switch room, IPP control room, 1 no. ESB switch room, and associated electrical infrastructure; • 3 no. transformer units; • Underground cabling and ducting; • 1 no. temporary construction compound and ancillary facilities for the duration of the construction phase of the project; • Perimeter Fencing; • CCTV; • Site access provided from existing site access off Curragh Road (L20171), internal tracks, site landscaping and all associated site enabling and site development works. This planning application is accompanied by a Natura Impact Statement (NIS).

Townland of Clara , near Clara , Co. Offaly

11m
2460308N/A12 Aug 2024

The application seeks a 10-year permission with an operational lifetime of 35 years. The development will consist of: • Approximately 38,000 panels on ground mounted metal frames, with a maximum height above ground of 3.17 metres, including string inverters mounted to the rear of the panels; • 1 no. 38kV substation including 1 no. MV switch room, IPP control room, 1 no. ESB switch room, and associated electrical infrastructure; • 3 no. transformer units; • Underground cabling and ducting; • 1 no. temporary construction compound and ancillary facilities for the duration of the construction phase of the project; • Perimeter Fencing; • CCTV; • Site access provided from existing site access of Curagh Road (L20171), internal tracks, site landscaping and all associated site enabling and site development works. This planning application is accompanied by a Natura Impact Statement (NIS).

Ballyboughlin , Clara , Co. Offaly

717m
17418CONDITIONAL24 Oct 2017

THE CONSTRUCTION OF A NEW POLYTUNNEL (CIRCA. 1370 M2) AND ALL ASSOCIATED SITE WORKS AND SERVICES. THE PROPOSED DEVELOPMENT IS WITHIN THE CURTILAGE OF A PROTECTED STRUCTURE RPS 12-61, NIAH 14908002

ASHMOUNT HOUSE , BALLYBOUGHLIN , CLARA CO. OFFALY R35 XV29

958m
20323CONDITIONAL27 Jul 2020

CONSTRUCTION OF A TWO-STOREY DWELLING (268.4SQ M) & DOMESTIC GARAGE (27SQ M) AND FOR A NEW DOMESTIC ENTRANCE ONTO THE PUBLIC ROADWAY. PERMISSION IS ALSO SOUGHT FOR THE INSTALLATION OF A PACKAGED WASTEWATER TREATMENT SYSTEM AND PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS

RAHEEN , CLARA , CO. OFFALY

1.0km
2460197N/A1 Jun 2024

Construct a four bedroom dwelling with garage. The application will also include a new domestic entrance and boundary treatments, effluent treatment system, percolation area, associated site-works landscaping and drainage.

Raheen , Clara , Co Offaly

1.0km
2460210REFUSED5 Jun 2024

Construction of a four bedroom dwelling with garage. The application will also include a new domestic entrance and boundary treatments, effluent treatment system, percolation area, associated site-works landscaping and drainage.

Raheen , Clara , Co Offaly

1.0km
18165CONDITIONAL13 Apr 2018

AN EXISTING SHED COMPRISING FUEL STORE AND GARDEN TOOL STORE TOGETHER WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS

RAHEEN , CLARA , CO OFFALY

1.1km
22467CONDITIONAL8 Sept 2022

DOMESTIC SHED/GARAGE AT THE REAR OF THE DWELLING HOUSE

RAHEEN , CLARA , CO. OFFALY

1.1km
2360072CONDITIONAL18 Aug 2023

retrofit, extend and alter existing dwelling and all associated site works. Permission is also sought for a new waste water treatment system and percolating area

Raheen , Clara , Co.Offaly

1.1km
2660339N/A29 Jun 2026

construction of a new dwelling, garage, new wastewater treatment system and polishing filter all associated site works

Raheen , Clara , Co. Offaly

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?