BALLYKILLEEN SHEAN KILCUMBER CLONCANT AND CUSHALING , EDENDERRY , CO OFFALY

N/A

Planning application 19568

Offaly - Offaly County Council

Proposed Development

A 10-YEAR PLANNING PERMISSION WITH A 30-YEAR OPERATIONAL LIFE FOR DEVELOPMENT ON A SITE AREA OF 60.674 HECTARES. THE DEVELOPMENT WILL CONSIST OF UP TO 8 ( EIGHT) WIND TURBINES WITH A TIP HEIGHT OF UP TO 187 METRES, AND ALL ASSOCIATED FOUNDATIONS AND HARDSTANDING AREAS; APPROXIMATELY 4,750 METRES OF NEW INTERNAL ACCESS ROADS, ASSOCIATED DRAINAGE AND TURNING AREAS; UPGRADE OF APPROXIMATELY 3,500 METRES OF THE EXISTING L50062 PUBLIC ROAD INCLUDING UPGRADE OF THE EXISTING BRIDGE; A NEW BRIDGE CROSSING OF THE FIGILE RIVER TO PROVIDE ACCESS BETWEEN TURBINE 3 AND TURBINE 4; A 2,950-METRE RECREATION TRAIL AND ALL ASSOCIATED DEVELOPMENT TO INCLUDE GRAVEL PATHWAYS, A FOOTBRIDGE ACROSS THE FIGILE RIVER, A PARKING AREA, SIGNAGE, INFORMATION BOARDS AND OUTDOOR FITNESS EQUIPMENT; AN OFF-SITE ELECTRICAL SUBSTATION AND A BATTERY ENERGY STORAGE FACILITY; ALL ASSOCIATED UNDERGROUND ELECTRICAL AND COMMUNICATIONS CABLING TO CONNECT THE TURBINES TO THE SUBSTATION INCLUDING APPROXIMATELY 1,550M ALONG THE R401 REGIONAL ROAD; A SPOIL STORAGE AREA; A PERMANENT METEOROLOGICAL MAST UP TO 110.5 METRES HIGH; 2 NO. TEMPORARY CONSTRUCTION COMPOUNDS; 2 NO. TEMPORARY BLADE ADAPTER SET-DOWN AREAS WITHIN THE WIND FARM SITE AND AT THE JUNCTION OF THE R402 AND R401 AT RATHMORE, EDENDERRY, CO. OFFALY; TURBINE DELIVERY ROUTE WORKS INCLUDING WIDENING OF THE JUNCTION OF THE R420 AND R402 AT BALLINA, GEASHILL, CO. OFFALY AND ALL ASSOCIATED SITE DEVELOPMENT WORKS. THE OVERALL DEVELOPMENT IS FOR A NINE (9) TURBINE WIND FARM, WITH A SEPARATE PLANNING APPLICATION BEING SUBMITTED TO KILDARE COUNTY COUNCIL FOR ONE (1) TURBINE LOCATED IN THE TOWNLAND OF TICKNEVIN, CARBURY, CO. KILDARE. AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR) AND A NATURA IMPACT STATEMENT (NIS) HAS BEEN PREPARED IN RESPECT OF THE APPLICATION

View the full application file on the council's planning portal →

Application Details

Location
BALLYKILLEEN SHEAN KILCUMBER CLONCANT AND CUSHALING , EDENDERRY , CO OFFALY
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Offaly County Council

Timeline

Registration Date
28 November 2019Other applications received that week
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

8m
19606REFUSED19 Dec 2019

A 10-YEAR PLANNING PERMISSION WITH A 30-YEAR OPERATIONAL LIFE FOR DEVELOPMENT ON A SITE AREA OF 60.674 HECTARES. THE DEVELOPMENT WILL CONSIST OF UP TO 8 (EIGHT) WIND TURBINES WITH A TIP HEIGHT OF UP TO 187 METRES, AND ALL ASSOCIATED FOUNDATIONS AND HARDSTANDING AREAS; APPROXIMATELY 4,750 METRES OF NEW INTERNAL ACCESS ROADS, ASSOCIATED DRAINAGE AND TURNING AREAS; UPGRADE OF APPROXIMATELY 3,500 METRES OF THE EXISTING L50062 PUBLIC ROAD INCLUDING UPGRADE OF THE EXISTING BRIDGE; A NEW BRIDGE CROSSING OF THE FIGILE RIVER TO PROVIDE ACCESS BETWEEN TURBINE 3 AND TURBINE 4; A 2,950-METRE RECREATION TRAIL AND ALL ASSOCIATED DEVELOPMENT TO INCLUDE GRAVEL PATHWAYS, A FOOTBRIDGE ACROSS THE FIGILE RIVER, A PARKING AREA, SIGNAGE, INFORMATION BOARDS AND OUTDOOR FITNESS EQUIPMENT; AN OFF-SITE ELECTRICAL SUBSTATION AND A BATTERY ENERGY STORAGE FACILITY; ALL ASSOCIATED UNDERGROUND ELECTRICAL AND COMMUNICATIONS CABLING TO CONNECT THE TURBINES TO THE SUBSTATION INCLUDING APPROXIMATELY 1,550M ALONG THE R401 REGIONAL ROAD; A SPOIL STORAGE AREA; A PERMANENT METEOROLOGICAL MAST UP TO 110.5 METRES HIGH; 2 NO. TEMPORARY CONSTRUCTION COMPOUNDS; 2 NO. TEMPORARY BLADE ADAPTER SET-DOWN AREAS WITHIN THE WIND FARM SITE AND AT THE JUNCTION OF THE R402 AND R401 AT RATHMORE, EDENDERRY, CO. OFFALY; TURBINE DELIVERY ROUTE WORKS INCLUDING WIDENING OF THE JUNCTION OF THE R420 AND R402 AT BALLINA, GEASHILL, CO. OFFALY AND ALL ASSOCIATED SITE DEVELOPMENT WORKS. THE OVERALL DEVELOPMENT IS FOR A NINE (9) TURBINE WIND FARM, WITH A SEPARATE PLANNING APPLICATION BEING SUBMITTED TO KILDARE COUNTY COUNCIL FOR ONE (1) TURBINE LOCATED IN THE TOWNLAND OF TICKNEVIN, CARBURY, CO. KILDARE. AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR) AND A NATURA IMPACT STATEMENT (NIS) HAS BEEN PREPARED IN RESPECT OF THE APPLICATION

BALLYKILLEEN SHEAN KILCUMBER CLONCANT & CUSHALING , EDENDERRY , CO OFFALY

1.6km
19524N/A8 Nov 2019

A 10-YEAR PLANNING PERMISSION WITH A 30-YEAR OPERATIONAL LIFE FOR DEVELOPMENT ON A TOTAL SITE AREA OF 63.9 HECTARES . THE DEVELOPMENT WILL CONSIST OF UP TO 9 NO. WIND TURBINES (8 IN CO. OFFALY, 1 IN CO. KILDARE), WITH A TIP HEIGHT OF UP TO 187 METRES, AND ALL ASSOCIATED FOUNDATIONS AND HARDSTANDING AREAS; APPROXIMATELY 4,750 METRES OF NEW INTERNAL ACCESS ROADS, ASSOCIATED DRAINAGE AND TURNING AREAS; UPGRADE OF APPROXIMATELY 3,500 METRES OF THE EXISTING L50062 PUBLIC ROAD INCLUDING UPGRADE OF THE EXISTING BRIDGE; A NEW BRIDGE CROSSING OF THE FIGILE RIVER TO PROVIDE ACCESS BETWEEN TURBINE 3 AND TURBINE 4; A 2,950-METRE RECREATION TRAIL AND ALL ASSOCIATED DEVELOPMENT TO INCLUDE GRAVEL PATHWAYS, A FOOTBRIDGE ACROSS THE FIGILE RIVER, A PARKING AREA, SIGNAGE, INFORMATION BOARDS AND OUTDOOR FITNESS EQUIPMENT; AN OFF-SITE ELECTRICAL SUBSTATION AND A BATTERY ENERGY STORAGE FACILITY; ALL ASSOCIATED UNDERGROUND ELECTRICAL AND COMMUNICATIONS CABLING TO CONNECT THE TURBINES TO THE SUBSTATION INCLUDING APPROXIMATELY 1,550M ALONG THE R401 REGIONAL ROAD; A SPOIL STORAGE AREA; A PERMANENT METEOROLOGICAL MAST UP TO 110.5 METRES HIGH; 2 NO. TEMPORARY CONSTRUCTION COMPOUNDS; 2 NO TEMPORARY BLADE ADAPTER SET-DOWN AREAS, TURBINE DELIVERY ROUTE WORKS AND ALL ASSOCIATED SITE DEVELOPMENT WORKS. AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR) AND A NATURA IMPACT STATEMENT (NIS) HAS BEEN PREPARED IN RESPECT OF THE APPLICATION

BALLYKILLEEN SHEAN KILCUMBER CLONCANT CUSHALING AND RATHMORE EDENDERRY , AND BALLINA GEASHILL , CO OFFALY AND TICKNEVIN CARBURY CO. KILDARE

The submission window has closed

Observations on this application closed on Friday 10 January 2020, five weeks after it was received. The authority cannot accept a late submission.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?