N/APlanning application 19524
Offaly - Offaly County Council
Proposed Development
A 10-YEAR PLANNING PERMISSION WITH A 30-YEAR OPERATIONAL LIFE FOR DEVELOPMENT ON A TOTAL SITE AREA OF 63.9 HECTARES . THE DEVELOPMENT WILL CONSIST OF UP TO 9 NO. WIND TURBINES (8 IN CO. OFFALY, 1 IN CO. KILDARE), WITH A TIP HEIGHT OF UP TO 187 METRES, AND ALL ASSOCIATED FOUNDATIONS AND HARDSTANDING AREAS; APPROXIMATELY 4,750 METRES OF NEW INTERNAL ACCESS ROADS, ASSOCIATED DRAINAGE AND TURNING AREAS; UPGRADE OF APPROXIMATELY 3,500 METRES OF THE EXISTING L50062 PUBLIC ROAD INCLUDING UPGRADE OF THE EXISTING BRIDGE; A NEW BRIDGE CROSSING OF THE FIGILE RIVER TO PROVIDE ACCESS BETWEEN TURBINE 3 AND TURBINE 4; A 2,950-METRE RECREATION TRAIL AND ALL ASSOCIATED DEVELOPMENT TO INCLUDE GRAVEL PATHWAYS, A FOOTBRIDGE ACROSS THE FIGILE RIVER, A PARKING AREA, SIGNAGE, INFORMATION BOARDS AND OUTDOOR FITNESS EQUIPMENT; AN OFF-SITE ELECTRICAL SUBSTATION AND A BATTERY ENERGY STORAGE FACILITY; ALL ASSOCIATED UNDERGROUND ELECTRICAL AND COMMUNICATIONS CABLING TO CONNECT THE TURBINES TO THE SUBSTATION INCLUDING APPROXIMATELY 1,550M ALONG THE R401 REGIONAL ROAD; A SPOIL STORAGE AREA; A PERMANENT METEOROLOGICAL MAST UP TO 110.5 METRES HIGH; 2 NO. TEMPORARY CONSTRUCTION COMPOUNDS; 2 NO TEMPORARY BLADE ADAPTER SET-DOWN AREAS, TURBINE DELIVERY ROUTE WORKS AND ALL ASSOCIATED SITE DEVELOPMENT WORKS. AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR) AND A NATURA IMPACT STATEMENT (NIS) HAS BEEN PREPARED IN RESPECT OF THE APPLICATION
View the full application file on the council's planning portal →Application Details
- Location
- BALLYKILLEEN SHEAN KILCUMBER CLONCANT CUSHALING AND RATHMORE EDENDERRY , AND BALLINA GEASHILL , CO OFFALY AND TICKNEVIN CARBURY CO. KILDARE
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Offaly County Council
Timeline
- Registration Date
- 8 November 2019
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
(A) CONSTRUCTION OF A 1.5KM, 5M WIDE, UNPAVED, ACCESS ROAD FROM THE R401 INTO THE PERMITTED CUSHALING WIND FARM (PLANNING REF. PL2/19/606 AND ABP 306924-20), (B) CONSTRUCTION OF A 1.6KM DOUBLE CIRCUIT 33KV UNDERGROUND COLLECTOR CABLE FROM THE PERMITTED CUSHALING WIND FARM TO THE PERMITTED WIND FARM SUBSTATION, (C) DEMOLITION AND REPLACEMENT OF A BORD NA MONÁ BOGLAND ACCESS BRIDGE AND (D) RELOCATION OF THE PERMITTED CUSHALING WIND FARM SUBSTATION 25 METERS SOUTHWEST. A NATURA IMPACT STATEMENT (NIS) WILL BE SUBMITTED TO THE PLANNING AUTHORITY WITH THE APPLICATION
THE TOWNLANDS OF BALLYKILLEEN SHEAN , KILCUMBER AND BALLINOWLART NORTH , CO. OFFALY
THE DEVELOPMENT OF (A) APPROXIMATELY 970M OF NEW INTERNAL ACCESS ROADS FOR THE PERMITTED CUSHALING WIND FARM (PLANNING REF. PL2/ 19/606 AND ABP 306924-20), (B) UPGRADE OF APPROXIMATELY 560M OF AN EXISTING BORD NA MONÁ BOG ACCESS ROAD, (C) CONSTRUCTION OF A 1.6KM DOUBLE CIRCUIT 33KV UNDERGROUND COLLECTOR CABLE FROM THE PERMITTED CUSHALING WIND FARM TO THE PERMITTED WIND FARM SUBSTATION, (D) DEMOLITION AND REPLACEMENT OF A BORD NA MONÁ BOGLAND ACCESS BRIDGE AND (E) RELOCATION OF THE PERMITTED CUSHALING WIND FARM SUBSTATION 25 METERS SOUTHWEST. A NATURA IMPACT STATEMENT (NIS) WILL BE SUBMITTED TO THE PLANNING AUTHORITY WITH THE APPLICATION
BALLYKILLEEN SHEAN KILCUMBER AND BALLINOWLART NORTH , CO. OFFALY
A PERIOD OF 10 YEARS TO CONSTRUCT AND COMPLETE A SOLAR PV DEVELOPMENT WITH A TOTAL SITE AREA OF CIRCA 117.47 HECTARES, TO INCLUDE PV PANELS MOUNTED ON METAL FRAMES, NEW ACCESS TRACKS, UNDERGROUND CABLING, PERIMETER FENCING WITH CCTV CAMERAS, 22 NO. MV POWER STATIONS, TEMPORARY CONSTRUCTION COMPOUNDS AND ALL ANCILLARY GRID INFRASTRUCTURE AND ASSOCIATED WORKS. THE SOLAR FARM WOULD BE OPERATIONAL FOR 40 YEARS
BALLINOWLART NORTH BALLYKILLEN KILCUMBER CLONCANT AND CUSHALING , EDENDERRY , CO. OFFALY
The development will consist of: A. A single storey extension to an existing single storey dwelling, B. A proposed new onsite effluent treatment system and percolation area, C. Upgrade of an existing agricultural vehicular entrance to residential use and closure of the existing residential entrance D. All other associated site development work
Kilcumber , Clonbulloge , Co. Offaly
THE ERECTION AND OPERATION OF A MULTI-USER TELECOMMUNICATIONS MAST TO BE UTILISED AS PART OF THE NATIONAL BROADBAND PLAN, COMPRISING A 45-METRE LATTICE STRUCTURE, 6NO. CABINETS ON STRUCTURE PLINTHS, FIBRE CHAMBER, ANTENNAE, TURNING AREA, COMPOUND, FENCING, GATE, ACCESS AND ALL ASSOCIATED WORKS AND SERVICES
BALLYKILLEEN NORTH OF EDENDERRY POWER STATION , IN THE TOWNLAND OF BALLYKILLEEN , CO OFFALY
New site entrance arrangements, replacing the previously consented access points 3 and 4 approved under Planning Reference 21/598, together with associated internal access tracks, drainage systems and all related works
Within the Townlands of Ballykilleen , Ballinowlart North and Kilcumber , Co. Offaly
DEVELOPMENT AT EDENDERRY POWER PLANT. EDENDERRY POWER LIMITED CURRENTLY HAS PLANNING PERMISSION TO OPERATE EDENDERRY POWER PLANT AS A PEAT AND BIOMASS CO-FIRED POWER PLANT UNDER GRANT OF PLANNING PERMISSION (OFFALY COUNTY COUNCIL REGISTER REFERENCE - PL2/15/129, AN BORD PLEANÁLA REGISTER REFERENCE - PL 19.245295). THE PROPOSED DEVELOPMENT WILL CONSIST OF THE CONTINUED OPERATION OF EDENDERRY POWER PLANT FROM THE BEGINNING OF 2024 TO THE END OF 2030 EXCLUSIVELY USING SUSTAINABLE BIOMASS FUEL. THE APPLICANT PROPOSES TO INCREASE THE VOLUME OF BIOMASS CONSUMED AT THE FACILITY FROM A CURRENT MAXIMUM OF 300,000 TO 530,000 TONNES PER ANNUM. IT IS PROPOSED TO UTILISE THE EXISTING PERMITTED ELECTRICITY GENERATION STATION AND INFRASTRUCTURE, INCLUDING FUEL HANDLING SYSTEMS, UTILITIES, PROCESSING SYSTEMS AND ANCILLARY STRUCTURES AS PART OF THE PROPOSED DEVELOPMENT. THERE WILL BE NO CHANGE TO EXISTING INFRASTRUCTURE PRESENT ON-SITE. SITE ACCESS AND EGRESS WILL USE THE EXISTING PERMITTED SITE ENTRANCES TO THE R401 PUBLIC ROAD. THERE WILL BE NO CHANGE TO THE PERMITTED BOUNDARY OF THE FACILITY. EDENDERRY POWER PLANT IS LICENCED BY THE ENVIRONMENTAL PROTECTION AGENCY UNDER AN INDUSTRIAL EMISSIONS (IE) LICENCE [REF. P0482-04]. ACTIVITIES AT THE FACILITY AND ASSOCIATED ENVIRONMENTAL ASPECTS AND EMISSIONS WILL CONTINUE TO BE REGULATED AND CONTROLLED BY THE EPA. THE PLANNING APPLICATION IS ACCOMPANIED BY AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR). THE PLANNING APPLICATION IS ALSO ACCOMPANIED BY A NATURA IMPACT STATEMENT (NIS)
BALLYKILLEEN , EDENDERRY , CO. OFFALY
ALTERATIONS TO THE EXISTING 110KV CUSHALING SUBSTATION AND INCLUDES THE INSTALLATION OF 110KV AIS SWITCHGEAR WITH ASSOCIATED FOUNDATIONS, STEELWORK, SUPPORTS AND CONNECTORS AND ASSOCIATED WORKS
BALLYKILLEEN , EDENDERRY , CO OFFALY
Permission for development at this site within the townlands of Ballykilleen, Ballinowlart North and Kilcumber, Co. Offaly. The development will consist of: 1. A grid connection for the previously approved, but not yet constructed, solar energy development (Planning ref: 21/598). This will consist of medium voltage (MV) electrical cabling between the solar arrays and the existing Philipstown 110kV substation, including a 8m section of cable within the R401 and a 56m section of overhead line and associated pole sets to facilitate crossing of the Figile River. 2. Amendments to the previously approved, but not yet constructed, solar energy development (Planning ref: 21/598) comprising revised site entrance arrangements in place of permitted access points 3 and 4 including associated internal access tracks, drainage and development boundary amendments.
Townlands of Ballykilleen , Ballinowlart North and Kilcumber , Co. Offaly
(RED III) a period of 10 years for a grid connection for the previously approved, but not yet constructed, solar energy development (Planning ref: 21/598). This will consist of installation of medium voltage (MV) electrical cabling between the solar arrays and the existing Philipstown 110kV substation, including a 8m section of cable within the R401 and a 56m section of overhead line and associated pole sets to facilitate crossing of the Figile River. A Natura Impact Statement (NIS) has been submitted as part of the application. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413)
Townlands of Ballykilleen Ballinowlart North and Kilcumber , . , Co. Offaly
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.