BALLYKILLEEN NORTH OF EDENDERRY POWER STATION , IN THE TOWNLAND OF BALLYKILLEEN , CO OFFALY
CONDITIONALPlanning application 19500
Offaly - Offaly County Council
Proposed Development
THE ERECTION AND OPERATION OF A MULTI-USER TELECOMMUNICATIONS MAST TO BE UTILISED AS PART OF THE NATIONAL BROADBAND PLAN, COMPRISING A 45-METRE LATTICE STRUCTURE, 6NO. CABINETS ON STRUCTURE PLINTHS, FIBRE CHAMBER, ANTENNAE, TURNING AREA, COMPOUND, FENCING, GATE, ACCESS AND ALL ASSOCIATED WORKS AND SERVICES
View the full application file on the council's planning portal →Application Timeline
Application received
25 Oct 2019
Decision: CONDITIONAL
18 Dec 2019
Decision due
19 Dec 2019
Grant issued
5 Feb 2020
Application Details
- Location
- BALLYKILLEEN NORTH OF EDENDERRY POWER STATION , IN THE TOWNLAND OF BALLYKILLEEN , CO OFFALY
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Offaly County Council
- Site Area
- 0.017 ha
Timeline
- Registration Date
- 25 October 2019
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 18 December 2019
- Grant Date
- 5 February 2020
- Permission Expires
- 4 February 2025
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
(A) CONSTRUCTION OF A 1.5KM, 5M WIDE, UNPAVED, ACCESS ROAD FROM THE R401 INTO THE PERMITTED CUSHALING WIND FARM (PLANNING REF. PL2/19/606 AND ABP 306924-20), (B) CONSTRUCTION OF A 1.6KM DOUBLE CIRCUIT 33KV UNDERGROUND COLLECTOR CABLE FROM THE PERMITTED CUSHALING WIND FARM TO THE PERMITTED WIND FARM SUBSTATION, (C) DEMOLITION AND REPLACEMENT OF A BORD NA MONÁ BOGLAND ACCESS BRIDGE AND (D) RELOCATION OF THE PERMITTED CUSHALING WIND FARM SUBSTATION 25 METERS SOUTHWEST. A NATURA IMPACT STATEMENT (NIS) WILL BE SUBMITTED TO THE PLANNING AUTHORITY WITH THE APPLICATION
THE TOWNLANDS OF BALLYKILLEEN SHEAN , KILCUMBER AND BALLINOWLART NORTH , CO. OFFALY
THE DEVELOPMENT OF (A) APPROXIMATELY 970M OF NEW INTERNAL ACCESS ROADS FOR THE PERMITTED CUSHALING WIND FARM (PLANNING REF. PL2/ 19/606 AND ABP 306924-20), (B) UPGRADE OF APPROXIMATELY 560M OF AN EXISTING BORD NA MONÁ BOG ACCESS ROAD, (C) CONSTRUCTION OF A 1.6KM DOUBLE CIRCUIT 33KV UNDERGROUND COLLECTOR CABLE FROM THE PERMITTED CUSHALING WIND FARM TO THE PERMITTED WIND FARM SUBSTATION, (D) DEMOLITION AND REPLACEMENT OF A BORD NA MONÁ BOGLAND ACCESS BRIDGE AND (E) RELOCATION OF THE PERMITTED CUSHALING WIND FARM SUBSTATION 25 METERS SOUTHWEST. A NATURA IMPACT STATEMENT (NIS) WILL BE SUBMITTED TO THE PLANNING AUTHORITY WITH THE APPLICATION
BALLYKILLEEN SHEAN KILCUMBER AND BALLINOWLART NORTH , CO. OFFALY
DEVELOPMENT AT EDENDERRY POWER PLANT. EDENDERRY POWER LIMITED CURRENTLY HAS PLANNING PERMISSION TO OPERATE EDENDERRY POWER PLANT AS A PEAT AND BIOMASS CO-FIRED POWER PLANT UNDER GRANT OF PLANNING PERMISSION (OFFALY COUNTY COUNCIL REGISTER REFERENCE - PL2/15/129, AN BORD PLEANÁLA REGISTER REFERENCE - PL 19.245295). THE PROPOSED DEVELOPMENT WILL CONSIST OF THE CONTINUED OPERATION OF EDENDERRY POWER PLANT FROM THE BEGINNING OF 2024 TO THE END OF 2030 EXCLUSIVELY USING SUSTAINABLE BIOMASS FUEL. THE APPLICANT PROPOSES TO INCREASE THE VOLUME OF BIOMASS CONSUMED AT THE FACILITY FROM A CURRENT MAXIMUM OF 300,000 TO 530,000 TONNES PER ANNUM. IT IS PROPOSED TO UTILISE THE EXISTING PERMITTED ELECTRICITY GENERATION STATION AND INFRASTRUCTURE, INCLUDING FUEL HANDLING SYSTEMS, UTILITIES, PROCESSING SYSTEMS AND ANCILLARY STRUCTURES AS PART OF THE PROPOSED DEVELOPMENT. THERE WILL BE NO CHANGE TO EXISTING INFRASTRUCTURE PRESENT ON-SITE. SITE ACCESS AND EGRESS WILL USE THE EXISTING PERMITTED SITE ENTRANCES TO THE R401 PUBLIC ROAD. THERE WILL BE NO CHANGE TO THE PERMITTED BOUNDARY OF THE FACILITY. EDENDERRY POWER PLANT IS LICENCED BY THE ENVIRONMENTAL PROTECTION AGENCY UNDER AN INDUSTRIAL EMISSIONS (IE) LICENCE [REF. P0482-04]. ACTIVITIES AT THE FACILITY AND ASSOCIATED ENVIRONMENTAL ASPECTS AND EMISSIONS WILL CONTINUE TO BE REGULATED AND CONTROLLED BY THE EPA. THE PLANNING APPLICATION IS ACCOMPANIED BY AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR). THE PLANNING APPLICATION IS ALSO ACCOMPANIED BY A NATURA IMPACT STATEMENT (NIS)
BALLYKILLEEN , EDENDERRY , CO. OFFALY
LEVELLING OF AGRICULTURAL LANDS BY THE IMPORTATION OF CLEAN, UNCONTAMINATED SOIL AND STONE MATERIALS UNDER ARTICLE 27 OF THE EUROPEAN COMMUNITIES (WASTE DIRECTIVE) REGULATIONS 2011, AS AMENDED. AN ARTICLE 6(3) OF THE HABITATS DIRECTIVE SCREENING FOR APPROPRIATE ASSESSMENT REPORT HAS BEEN PREPARED IN RESPECT OF THE PROPOSED DEVELOPMENT
BALLYKILLEEN , SHEAN EDENDERRY , CO.OFFALY
LEVELLING OF AGRICULTURAL LANDS BY THE IMPORTATION OF CLEAN, UNCONTAMINATED SOIL AND STONE MATERIALS UNDER ARTICLE 27 OF THE EUROPEAN COMMUNITIES (WASTE DIRECTIVE) REGULATIONS 2011, AS AMENDED. AN ARTICLE 6(3) OF THE HABITATS DIRECTIVE SCREENING FOR APPROPRIATE ASSESSMENT REPORT HAS BEEN PREPARED IN RESPECT OF THE PROPOSED DEVELOPMENT
BALLYKILLEEN , SHEAN EDENDERRY , CO.OFFALY
ALTERATIONS TO THE EXISTING 110KV CUSHALING SUBSTATION AND INCLUDES THE INSTALLATION OF 110KV AIS SWITCHGEAR WITH ASSOCIATED FOUNDATIONS, STEELWORK, SUPPORTS AND CONNECTORS AND ASSOCIATED WORKS
BALLYKILLEEN , EDENDERRY , CO OFFALY
New site entrance arrangements, replacing the previously consented access points 3 and 4 approved under Planning Reference 21/598, together with associated internal access tracks, drainage systems and all related works
Within the Townlands of Ballykilleen , Ballinowlart North and Kilcumber , Co. Offaly
A SINGLE STOREY MASONRY CONSTRUCTED OUTBUILDING AND A SINGLE STOREY STEEL FRAMED, TIMBER CLAD OUTBUILDING TO THE REAR/SIDE OF THE PROPERTY
SHEAN EDENDERRY , CO. OFFALY , R45 KN92
A SINGLE STOREY MASONRY CONSTRUCTED OUTBUILDING AND A SINGLE STOREY STEEL FRAMED, TIMBER CLAD OUTBUILDING TO THE REAR/SIDE OF THE PROPERTY
SHEAN , EDENDERRY CO. OFFALY , R45 KN92
1) A SINGLE STOREY, MASONRY CONSTRUCTED, PITCHED ROOF BUILDING AND 2) A SINGLE STOREY, STEEL FRAMED, PITCHED ROOF, TIMBER CLAD OUTBUILDING TO THE REAR/SIDE (FOR ANCILLARY USE) TO THE EXISTING DWELLING
SHEAN , EDENDERRY , CO. OFFALY R45 KN92
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?