← Back to search

BALLYKILLEEN SHEAN KILCUMBER AND BALLINOWLART NORTH , CO. OFFALY

CONDITIONAL

Planning application 22494

Offaly - Offaly County Council

Proposed Development

THE DEVELOPMENT OF (A) APPROXIMATELY 970M OF NEW INTERNAL ACCESS ROADS FOR THE PERMITTED CUSHALING WIND FARM (PLANNING REF. PL2/ 19/606 AND ABP 306924-20), (B) UPGRADE OF APPROXIMATELY 560M OF AN EXISTING BORD NA MONÁ BOG ACCESS ROAD, (C) CONSTRUCTION OF A 1.6KM DOUBLE CIRCUIT 33KV UNDERGROUND COLLECTOR CABLE FROM THE PERMITTED CUSHALING WIND FARM TO THE PERMITTED WIND FARM SUBSTATION, (D) DEMOLITION AND REPLACEMENT OF A BORD NA MONÁ BOGLAND ACCESS BRIDGE AND (E) RELOCATION OF THE PERMITTED CUSHALING WIND FARM SUBSTATION 25 METERS SOUTHWEST. A NATURA IMPACT STATEMENT (NIS) WILL BE SUBMITTED TO THE PLANNING AUTHORITY WITH THE APPLICATION

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    23 Sept 2022

  2. Further information requested

    17 Nov 2022

  3. Further information received

    1 Feb 2023

  4. Decision due

    28 Mar 2023

  5. Decision: CONDITIONAL

    28 Mar 2023

  6. Grant issued

    4 May 2023

Application Details

Location
BALLYKILLEEN SHEAN KILCUMBER AND BALLINOWLART NORTH , CO. OFFALY
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Offaly County Council
Site Area
6.7 ha

Timeline

Registration Date
23 September 2022
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
28 March 2023
Grant Date
4 May 2023
Permission Expires
3 May 2028

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

16m
22407N/A12 Aug 2022

(A) CONSTRUCTION OF A 1.5KM, 5M WIDE, UNPAVED, ACCESS ROAD FROM THE R401 INTO THE PERMITTED CUSHALING WIND FARM (PLANNING REF. PL2/19/606 AND ABP 306924-20), (B) CONSTRUCTION OF A 1.6KM DOUBLE CIRCUIT 33KV UNDERGROUND COLLECTOR CABLE FROM THE PERMITTED CUSHALING WIND FARM TO THE PERMITTED WIND FARM SUBSTATION, (C) DEMOLITION AND REPLACEMENT OF A BORD NA MONÁ BOGLAND ACCESS BRIDGE AND (D) RELOCATION OF THE PERMITTED CUSHALING WIND FARM SUBSTATION 25 METERS SOUTHWEST. A NATURA IMPACT STATEMENT (NIS) WILL BE SUBMITTED TO THE PLANNING AUTHORITY WITH THE APPLICATION

THE TOWNLANDS OF BALLYKILLEEN SHEAN , KILCUMBER AND BALLINOWLART NORTH , CO. OFFALY

198m
19500CONDITIONAL25 Oct 2019

THE ERECTION AND OPERATION OF A MULTI-USER TELECOMMUNICATIONS MAST TO BE UTILISED AS PART OF THE NATIONAL BROADBAND PLAN, COMPRISING A 45-METRE LATTICE STRUCTURE, 6NO. CABINETS ON STRUCTURE PLINTHS, FIBRE CHAMBER, ANTENNAE, TURNING AREA, COMPOUND, FENCING, GATE, ACCESS AND ALL ASSOCIATED WORKS AND SERVICES

BALLYKILLEEN NORTH OF EDENDERRY POWER STATION , IN THE TOWNLAND OF BALLYKILLEEN , CO OFFALY

316m
21291CONDITIONAL10 May 2021

DEVELOPMENT AT EDENDERRY POWER PLANT. EDENDERRY POWER LIMITED CURRENTLY HAS PLANNING PERMISSION TO OPERATE EDENDERRY POWER PLANT AS A PEAT AND BIOMASS CO-FIRED POWER PLANT UNDER GRANT OF PLANNING PERMISSION (OFFALY COUNTY COUNCIL REGISTER REFERENCE - PL2/15/129, AN BORD PLEANÁLA REGISTER REFERENCE - PL 19.245295). THE PROPOSED DEVELOPMENT WILL CONSIST OF THE CONTINUED OPERATION OF EDENDERRY POWER PLANT FROM THE BEGINNING OF 2024 TO THE END OF 2030 EXCLUSIVELY USING SUSTAINABLE BIOMASS FUEL. THE APPLICANT PROPOSES TO INCREASE THE VOLUME OF BIOMASS CONSUMED AT THE FACILITY FROM A CURRENT MAXIMUM OF 300,000 TO 530,000 TONNES PER ANNUM. IT IS PROPOSED TO UTILISE THE EXISTING PERMITTED ELECTRICITY GENERATION STATION AND INFRASTRUCTURE, INCLUDING FUEL HANDLING SYSTEMS, UTILITIES, PROCESSING SYSTEMS AND ANCILLARY STRUCTURES AS PART OF THE PROPOSED DEVELOPMENT. THERE WILL BE NO CHANGE TO EXISTING INFRASTRUCTURE PRESENT ON-SITE. SITE ACCESS AND EGRESS WILL USE THE EXISTING PERMITTED SITE ENTRANCES TO THE R401 PUBLIC ROAD. THERE WILL BE NO CHANGE TO THE PERMITTED BOUNDARY OF THE FACILITY. EDENDERRY POWER PLANT IS LICENCED BY THE ENVIRONMENTAL PROTECTION AGENCY UNDER AN INDUSTRIAL EMISSIONS (IE) LICENCE [REF. P0482-04]. ACTIVITIES AT THE FACILITY AND ASSOCIATED ENVIRONMENTAL ASPECTS AND EMISSIONS WILL CONTINUE TO BE REGULATED AND CONTROLLED BY THE EPA. THE PLANNING APPLICATION IS ACCOMPANIED BY AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR). THE PLANNING APPLICATION IS ALSO ACCOMPANIED BY A NATURA IMPACT STATEMENT (NIS)

BALLYKILLEEN , EDENDERRY , CO. OFFALY

601m
19496CONDITIONAL23 Oct 2019

ALTERATIONS TO THE EXISTING 110KV CUSHALING SUBSTATION AND INCLUDES THE INSTALLATION OF 110KV AIS SWITCHGEAR WITH ASSOCIATED FOUNDATIONS, STEELWORK, SUPPORTS AND CONNECTORS AND ASSOCIATED WORKS

BALLYKILLEEN , EDENDERRY , CO OFFALY

623m
2582CONDITIONAL29 Aug 2025

LEVELLING OF AGRICULTURAL LANDS BY THE IMPORTATION OF CLEAN, UNCONTAMINATED SOIL AND STONE MATERIALS UNDER ARTICLE 27 OF THE EUROPEAN COMMUNITIES (WASTE DIRECTIVE) REGULATIONS 2011, AS AMENDED. AN ARTICLE 6(3) OF THE HABITATS DIRECTIVE SCREENING FOR APPROPRIATE ASSESSMENT REPORT HAS BEEN PREPARED IN RESPECT OF THE PROPOSED DEVELOPMENT

BALLYKILLEEN , SHEAN EDENDERRY , CO.OFFALY

624m
2577N/A13 Aug 2025

LEVELLING OF AGRICULTURAL LANDS BY THE IMPORTATION OF CLEAN, UNCONTAMINATED SOIL AND STONE MATERIALS UNDER ARTICLE 27 OF THE EUROPEAN COMMUNITIES (WASTE DIRECTIVE) REGULATIONS 2011, AS AMENDED. AN ARTICLE 6(3) OF THE HABITATS DIRECTIVE SCREENING FOR APPROPRIATE ASSESSMENT REPORT HAS BEEN PREPARED IN RESPECT OF THE PROPOSED DEVELOPMENT

BALLYKILLEEN , SHEAN EDENDERRY , CO.OFFALY

627m
2560654CONDITIONAL18 Dec 2025

New site entrance arrangements, replacing the previously consented access points 3 and 4 approved under Planning Reference 21/598, together with associated internal access tracks, drainage systems and all related works

Within the Townlands of Ballykilleen , Ballinowlart North and Kilcumber , Co. Offaly

628m
21598CONDITIONAL30 Sept 2021

A PERIOD OF 10 YEARS TO CONSTRUCT AND COMPLETE A SOLAR PV DEVELOPMENT WITH A TOTAL SITE AREA OF CIRCA 117.47 HECTARES, TO INCLUDE PV PANELS MOUNTED ON METAL FRAMES, NEW ACCESS TRACKS, UNDERGROUND CABLING, PERIMETER FENCING WITH CCTV CAMERAS, 22 NO. MV POWER STATIONS, TEMPORARY CONSTRUCTION COMPOUNDS AND ALL ANCILLARY GRID INFRASTRUCTURE AND ASSOCIATED WORKS. THE SOLAR FARM WOULD BE OPERATIONAL FOR 40 YEARS

BALLINOWLART NORTH BALLYKILLEN KILCUMBER CLONCANT AND CUSHALING , EDENDERRY , CO. OFFALY

699m
2560264CONDITIONAL25 Jun 2025

The development will consist of: A. A single storey extension to an existing single storey dwelling, B. A proposed new onsite effluent treatment system and percolation area, C. Upgrade of an existing agricultural vehicular entrance to residential use and closure of the existing residential entrance D. All other associated site development work

Kilcumber , Clonbulloge , Co. Offaly

759m
2560603N/A27 Nov 2025

Permission for development at this site within the townlands of Ballykilleen, Ballinowlart North and Kilcumber, Co. Offaly. The development will consist of: 1. A grid connection for the previously approved, but not yet constructed, solar energy development (Planning ref: 21/598). This will consist of medium voltage (MV) electrical cabling between the solar arrays and the existing Philipstown 110kV substation, including a 8m section of cable within the R401 and a 56m section of overhead line and associated pole sets to facilitate crossing of the Figile River. 2. Amendments to the previously approved, but not yet constructed, solar energy development (Planning ref: 21/598) comprising revised site entrance arrangements in place of permitted access points 3 and 4 including associated internal access tracks, drainage and development boundary amendments.

Townlands of Ballykilleen , Ballinowlart North and Kilcumber , Co. Offaly