LEABEG BLUEBALL , CO. OFFALY , R35 FX79
CONDITIONALPlanning application 22610
Offaly - Offaly County Council
Proposed Development
A CHANGE OF USE OF THE ORIGINAL DOMESTIC GARAGE TO STUDY, AN EXISTING GARAGE/FUEL STORE (51.33M2) LOCATED AT THE REAR OF THE SITE. ALSO A KITCHEN/DINING EXTENSION TO THE REAR OF EXISTING DWELLING (23.8 M2) AND ALL ANCILLARY WORKS
Application Timeline
Application received
25 Nov 2022
Decision: CONDITIONAL
27 Jan 2023
Decision due
28 Jan 2023
Grant issued
10 Mar 2023
Application Details
- Location
- LEABEG BLUEBALL , CO. OFFALY , R35 FX79
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Offaly County Council
- Site Area
- 0.24 ha
- Floor Area
- 90.73 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 25 November 2022
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 27 January 2023
- Grant Date
- 10 March 2023
- Permission Expires
- 10 March 2028
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
construction of a single story dwelling and garage. The application will also include an effluent treatment unit, percolation area, new domestic entrance and all associated site works and drainage.
Leabeg , Boora Blueball , Co. Offaly
BUILDING NEW DWELLING HOUSE, INSTALL EFFLUENT TREATMENT SYSTEM WITH SOIL POLISHING FILTER AND ALL ANCILLARY SITE WORKS
LEABEG , BOORA , CO.OFFALY
A 66M2 GRANNY FLAT SIDE EXTENSION CONSISTING OF AN ADDITIONAL KITCHEN, SITTING ROOM AND BEDROOM WITH ALTERATIONS TO THE LAYOUT OF THE EXISTING DWELLING
LEABEG , BOORA , CO. OFFALY
phased construction of two organic growing polytunnel units, rainwater harvesting, hard standings and all ancillary works. Phase 1 will consist of one polytunnel, rainwater harvesting and hard standings complete for the 2024 growing season and beyond with phase 2 consisting of the remaining polytunnel expected to be complete for the 2025 growing season and beyond
Leabeg , Tullamore , Co. Offaly
Two organic growing polytunnel units, rainwater harvesting, new entrance and all ancillary works.
Leabeg , Tullamore , Co. Offaly
The development will consist of phased construction of two organic growing polytunnel units, rainwater harvesting, hard standings and all ancillary works. Phase 1 will consist of one polytunnel, rainwater harvesting and hard standings for the 2024 growing season with phase 2 following for next available seasons.
Leabeg , Tullamore , Co. Offaly
UPGRADING AND EXTEND EXISTING DERELICT DWELLING , TO CONVERT , UPGRADE AND EXTEND EXISTING OUTBUILDING INTO AN ATTACHED ANNEX WITH 1ST FLOOR ELEMENT , PERMISSION IS ALSO SOUGHT TO UPGRADE EXISTING SITE BOUNDARIES AND EXISTING DRIVEWAY AND TO DECOMMISSION EXISTING WELL AND SEPTIC TANK AND REPLACE SAME WITH A NEW CONNECTION TO PUBLIC WATERMAIN AND A NEW SEPTIC TANK AND PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS
LEA BEG BOORA , BLUEBALL TULLAMORE , CO.OFFALY
(1) CONSTRUCTION OF A NEW EXTENSION TO EXISTING LIVESTOCK FARM BUILDING TO CONTAIN MILKING AREA, CUBICLES, EXTENDED SLATTED UNDERGROUND SLURRY STORAGE TANKS AND ALL ANCILLARY SEPARATION & TREATMENT AREAS, AND TO INSTALL CUBICLES IN THE EXISTING BUILDING; ALL COMPLETED WITH ASSOCIATED SITEWORKS. (2) PERMISSION TO CONSTRUCT A NEW FARM BUILDING TO CONTAIN DAIRY, PLANT ROOM, FARM OFFICE, STORAGE AREA AND EXTERNAL MILK STORAGE SILO; ALL COMPLETED WITH ASSOCIATED SITEWORKS
LEA BEG , TULLAMORE , CO. OFFALY
CONVERSION OF THE EXISTING RESIDENTIAL PROPERTY LOCATED TO THE REAR OF THE EXISTING PUBLIC HOUSE FORMALLY KNOWN AS 'LOUGH BOORA INN' TO COMMERCIAL USE, TO RE-ROOF THIS AREA AND TO CONSTRUCT A NORTHERN SIDE EXTENSION TO SAME AND CONSTRUCTION OF NEW SOUTHERN END FLAT ROOFED OUTDOOR DINING AREA, ALTERATIONS TO THE EXISTING FRONT ELEVATION, TO CONSTRUCT A NORTHERN SIDE EXTERNAL STONE CLADDING WALL TO ENCLOSE AN OUTDOOR DINING AREA, CONSTRUCTION OF 35 NO. CAR PARKING SPACES TO INCLUDE 4 NO. EV CHARGING SPACES AND 4 NO. DISABLED ACCESS PARKING SPACES, PROPOSED NEW SITE ENTRANCE WITH PEDESTRIAN CROSSING, A PROPOSED RECEPTION BUILDING TO INCLUDE FIRST FLOOR WORK HUB, INSTALLATION OF 6 NO. GLAMPING PODS, TO CONSTRUCT A TOILET UNIT AND WASTE REFUSE DISPOSAL AREA ALSO TO PROVIDE CAPACITY TO PARK 88 NO. BICYCLES, TO CONSTRUCT 16 NO. PITCH PARKING FOR CARAVAN/MOTORHOME SHORT TERM STAY TO INCLUDE 16 NO. SEPARATE ELECTRICAL AND WATER SUPPLY CONNECTION BOLLARDS, TO CONSTRUCT AN OUTDOOR PLAY AREA, DEMOLISH THE EXISTING HAY SHED AND TO INSTALL A TREATMENT SYSTEM WITH COCO INFILTRATION SYSTEM AND ALL ASSOCIATED AND SITE WORKS AND TO INSTALL AN ATTENUATION SYSTEM FOR SURFACE WATER RUNOFF, TO INSTALL A RAINWATER HARVESTING SYSTEM FOR POTABLE WATER SUPPLY TO THE MAIN BUILDING, REUSE EXISTING WATER MAINS CONNECTION AND ALL ASSOCIATED LANDSCAPING AND SITE WORKS
BOORA AVENUE LEA BEG BOORA BLUEBALL , TULLAMORE , CO. OFFALY
CONVERSION OF THE EXISTING RESIDENTIAL PROPERTY LOCATED TO THE REAR OF THE EXISTING PUBLIC HOUSE FORMALLY KNOWN AS 'LOUGH BOORA INN' TO COMMERCIAL USE, TO RE-ROOF THIS AREA AND TO CONSTRUCT A NORTHERN SIDE EXTENSION TO SAME AND CONSTRUCTION OF NEW SOUTHERN END FLAT ROOFED OUTDOOR DINING AREA, ALTERATIONS TO THE EXISTING FRONT ELEVATION, TO CONSTRUCT A NORTHERN SIDE EXTERNAL STONE CLADDING WALL TO ENCLOSE AN OUTDOOR DINING AREA, CONSTRUCTION OF 35 NO. CAR PARKING SPACES TO INCLUDE 4 NO. EV CHARGING SPACES AND 4 NO. DISABLED ACCESS PARKING SPACES, PROPOSED NEW SITE ENTRANCE WITH PEDESTRIAN CROSSING, A PROPOSED RECEPTION BUILDING TO INCLUDE FIRST FLOOR WORK HUB, INSTALLATION OF 6 NO. GLAMPING PODS, TO CONSTRUCT A TOILET UNIT AND WASTE REFUSE DISPOSAL AREA ALSO TO PROVIDE CAPACITY TO PARK 88 NO. BICYCLES, TO CONSTRUCT 16 NO. PITCH PARKING FOR CARAVAN/MOTORHOME SHORT TERM STAY TO INCLUDE 16 NO. SEPARATE ELECTRICAL AND WATER SUPPLY CONNECTION BOLLARDS, TO CONSTRUCT AN OUTDOOR PLAY AREA, DEMOLISH THE EXISTING HAY SHED AND TO INSTALL A TREATMENT SYSTEM WITH COCO INFILTRATION SYSTEM AND ALL ASSOCIATED AND SITE WORKS AND TO INSTALL AN ATTENUATION SYSTEM FOR SURFACE WATER RUNOFF, TO INSTALL A RAINWATER HARVESTING SYSTEM FOR PORTABLE WATER SUPPLY TO THE MAIN BUILDING, REUSE EXISTING WATER MAINS CONNECTION AND ALL ASSOCIATED LANDSCAPING AND SITE WORKS
BOORA AVENUE LEA BEG , BOORA BLUEBALL , TULLAMORE CO. OFFALY
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?