← Back to search

Leabeg , Boora Blueball , Co. Offaly

REFUSED

Planning application 2560531

Offaly - Offaly County Council

Proposed Development

construction of a single story dwelling and garage. The application will also include an effluent treatment unit, percolation area, new domestic entrance and all associated site works and drainage.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    31 Oct 2025

  2. Decision: REFUSED

    22 Dec 2025

  3. Decision due

    3 Jan 2026

Application Details

Location
Leabeg , Boora Blueball , Co. Offaly
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Offaly County Council
Site Area
0.261 ha
Floor Area
145 sq m
Residential Units
1

Timeline

Registration Date
31 October 2025
Status
APPLICATION FINALISED
Decision
REFUSED
Decision Date
22 December 2025

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

67m
23366N/A22 Aug 2023

BUILDING NEW DWELLING HOUSE, INSTALL EFFLUENT TREATMENT SYSTEM WITH SOIL POLISHING FILTER AND ALL ANCILLARY SITE WORKS

LEABEG , BOORA , CO.OFFALY

105m
22610CONDITIONAL25 Nov 2022

A CHANGE OF USE OF THE ORIGINAL DOMESTIC GARAGE TO STUDY, AN EXISTING GARAGE/FUEL STORE (51.33M2) LOCATED AT THE REAR OF THE SITE. ALSO A KITCHEN/DINING EXTENSION TO THE REAR OF EXISTING DWELLING (23.8 M2) AND ALL ANCILLARY WORKS

LEABEG BLUEBALL , CO. OFFALY , R35 FX79

388m
18460CONDITIONAL19 Oct 2018

A 66M2 GRANNY FLAT SIDE EXTENSION CONSISTING OF AN ADDITIONAL KITCHEN, SITTING ROOM AND BEDROOM WITH ALTERATIONS TO THE LAYOUT OF THE EXISTING DWELLING

LEABEG , BOORA , CO. OFFALY

435m
2460279CONDITIONAL23 Jul 2024

Two organic growing polytunnel units, rainwater harvesting, new entrance and all ancillary works.

Leabeg , Tullamore , Co. Offaly

435m
2360169N/A2 Nov 2023

phased construction of two organic growing polytunnel units, rainwater harvesting, hard standings and all ancillary works. Phase 1 will consist of one polytunnel, rainwater harvesting and hard standings complete for the 2024 growing season and beyond with phase 2 consisting of the remaining polytunnel expected to be complete for the 2025 growing season and beyond

Leabeg , Tullamore , Co. Offaly

435m
2360151N/A18 Oct 2023

The development will consist of phased construction of two organic growing polytunnel units, rainwater harvesting, hard standings and all ancillary works. Phase 1 will consist of one polytunnel, rainwater harvesting and hard standings for the 2024 growing season with phase 2 following for next available seasons.

Leabeg , Tullamore , Co. Offaly

576m
2560561CONDITIONAL17 Nov 2025

UPGRADING AND EXTEND EXISTING DERELICT DWELLING , TO CONVERT , UPGRADE AND EXTEND EXISTING OUTBUILDING INTO AN ATTACHED ANNEX WITH 1ST FLOOR ELEMENT , PERMISSION IS ALSO SOUGHT TO UPGRADE EXISTING SITE BOUNDARIES AND EXISTING DRIVEWAY AND TO DECOMMISSION EXISTING WELL AND SEPTIC TANK AND REPLACE SAME WITH A NEW CONNECTION TO PUBLIC WATERMAIN AND A NEW SEPTIC TANK AND PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS

LEA BEG BOORA , BLUEBALL TULLAMORE , CO.OFFALY

615m
2276CONDITIONAL23 Feb 2022

(1) CONSTRUCTION OF A NEW EXTENSION TO EXISTING LIVESTOCK FARM BUILDING TO CONTAIN MILKING AREA, CUBICLES, EXTENDED SLATTED UNDERGROUND SLURRY STORAGE TANKS AND ALL ANCILLARY SEPARATION & TREATMENT AREAS, AND TO INSTALL CUBICLES IN THE EXISTING BUILDING; ALL COMPLETED WITH ASSOCIATED SITEWORKS. (2) PERMISSION TO CONSTRUCT A NEW FARM BUILDING TO CONTAIN DAIRY, PLANT ROOM, FARM OFFICE, STORAGE AREA AND EXTERNAL MILK STORAGE SILO; ALL COMPLETED WITH ASSOCIATED SITEWORKS

LEA BEG , TULLAMORE , CO. OFFALY

898m
23144CONDITIONAL4 Apr 2023

CONVERSION OF THE EXISTING RESIDENTIAL PROPERTY LOCATED TO THE REAR OF THE EXISTING PUBLIC HOUSE FORMALLY KNOWN AS 'LOUGH BOORA INN' TO COMMERCIAL USE, TO RE-ROOF THIS AREA AND TO CONSTRUCT A NORTHERN SIDE EXTENSION TO SAME AND CONSTRUCTION OF NEW SOUTHERN END FLAT ROOFED OUTDOOR DINING AREA, ALTERATIONS TO THE EXISTING FRONT ELEVATION, TO CONSTRUCT A NORTHERN SIDE EXTERNAL STONE CLADDING WALL TO ENCLOSE AN OUTDOOR DINING AREA, CONSTRUCTION OF 35 NO. CAR PARKING SPACES TO INCLUDE 4 NO. EV CHARGING SPACES AND 4 NO. DISABLED ACCESS PARKING SPACES, PROPOSED NEW SITE ENTRANCE WITH PEDESTRIAN CROSSING, A PROPOSED RECEPTION BUILDING TO INCLUDE FIRST FLOOR WORK HUB, INSTALLATION OF 6 NO. GLAMPING PODS, TO CONSTRUCT A TOILET UNIT AND WASTE REFUSE DISPOSAL AREA ALSO TO PROVIDE CAPACITY TO PARK 88 NO. BICYCLES, TO CONSTRUCT 16 NO. PITCH PARKING FOR CARAVAN/MOTORHOME SHORT TERM STAY TO INCLUDE 16 NO. SEPARATE ELECTRICAL AND WATER SUPPLY CONNECTION BOLLARDS, TO CONSTRUCT AN OUTDOOR PLAY AREA, DEMOLISH THE EXISTING HAY SHED AND TO INSTALL A TREATMENT SYSTEM WITH COCO INFILTRATION SYSTEM AND ALL ASSOCIATED AND SITE WORKS AND TO INSTALL AN ATTENUATION SYSTEM FOR SURFACE WATER RUNOFF, TO INSTALL A RAINWATER HARVESTING SYSTEM FOR POTABLE WATER SUPPLY TO THE MAIN BUILDING, REUSE EXISTING WATER MAINS CONNECTION AND ALL ASSOCIATED LANDSCAPING AND SITE WORKS

BOORA AVENUE LEA BEG BOORA BLUEBALL , TULLAMORE , CO. OFFALY

898m
2391N/A7 Mar 2023

CONVERSION OF THE EXISTING RESIDENTIAL PROPERTY LOCATED TO THE REAR OF THE EXISTING PUBLIC HOUSE FORMALLY KNOWN AS 'LOUGH BOORA INN' TO COMMERCIAL USE, TO RE-ROOF THIS AREA AND TO CONSTRUCT A NORTHERN SIDE EXTENSION TO SAME AND CONSTRUCTION OF NEW SOUTHERN END FLAT ROOFED OUTDOOR DINING AREA, ALTERATIONS TO THE EXISTING FRONT ELEVATION, TO CONSTRUCT A NORTHERN SIDE EXTERNAL STONE CLADDING WALL TO ENCLOSE AN OUTDOOR DINING AREA, CONSTRUCTION OF 35 NO. CAR PARKING SPACES TO INCLUDE 4 NO. EV CHARGING SPACES AND 4 NO. DISABLED ACCESS PARKING SPACES, PROPOSED NEW SITE ENTRANCE WITH PEDESTRIAN CROSSING, A PROPOSED RECEPTION BUILDING TO INCLUDE FIRST FLOOR WORK HUB, INSTALLATION OF 6 NO. GLAMPING PODS, TO CONSTRUCT A TOILET UNIT AND WASTE REFUSE DISPOSAL AREA ALSO TO PROVIDE CAPACITY TO PARK 88 NO. BICYCLES, TO CONSTRUCT 16 NO. PITCH PARKING FOR CARAVAN/MOTORHOME SHORT TERM STAY TO INCLUDE 16 NO. SEPARATE ELECTRICAL AND WATER SUPPLY CONNECTION BOLLARDS, TO CONSTRUCT AN OUTDOOR PLAY AREA, DEMOLISH THE EXISTING HAY SHED AND TO INSTALL A TREATMENT SYSTEM WITH COCO INFILTRATION SYSTEM AND ALL ASSOCIATED AND SITE WORKS AND TO INSTALL AN ATTENUATION SYSTEM FOR SURFACE WATER RUNOFF, TO INSTALL A RAINWATER HARVESTING SYSTEM FOR PORTABLE WATER SUPPLY TO THE MAIN BUILDING, REUSE EXISTING WATER MAINS CONNECTION AND ALL ASSOCIATED LANDSCAPING AND SITE WORKS

BOORA AVENUE LEA BEG , BOORA BLUEBALL , TULLAMORE CO. OFFALY

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?