Toobrackan Townland , Ballaghaderreen , Co. Roscommon

CONDITIONAL

Planning application 18492

Roscommon - Roscommon County Council

Proposed Development

Permission for a forest bell mouth entrance onto a public road including all other associated site works at

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    25 Sept 2018

  2. Decision: CONDITIONAL

    15 Nov 2018

  3. Decision due

    19 Nov 2018

  4. Grant issued

    31 Dec 2018

Application Details

Location
Toobrackan Townland , Ballaghaderreen , Co. Roscommon
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Roscommon County Council
Site Area
0.168 ha

Timeline

Registration Date
25 September 2018
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
15 November 2018
Grant Date
31 December 2018
Permission Expires
30 December 2023

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

603m
18491CONDITIONAL25 Sept 2018

Permission for 2 No. forest bell mouth entrances onto a public road including all other associated site works at

Tullaghanrock Townland , Ballaghaderreen , Co. Roscommon

1.3km
17284CONDITIONAL23 Jun 2017

for a new garage and change of house type from that granted under planning reference PD/07/1673 at

Tullaghanmore , Edmondstown , Ballaghadereen

1.3km
17267N/A16 Jun 2017

Planning Permission for change of house type from that granted under Planning Reference PD/07/1673 at

Tullaghanmore , Edmondstown , Ballaghaderreen

1.3km
2660243N/A23 May 2026

Permission is sought for Grid System Services Limited, applying for a 10 year permission to develop an Energy Storage System , which will connect to the adjoining ESB Tonroe 110kV Electricity Substation on land at Ballyoughter, Ballaghaderreen, County Roscommon. The proposed development will have a projected life span of 35 years. The development will consist of the construction of 1) enclosed battery energy storage system within a site compound on a total of up to c.2.33 hectare site, to include: 1 no. single storey 110kV customer substation, control and switch rooms; up to 44 battery blocks on concrete support structures including heating, ventilation and air conditioning unit (HVAC units); up to 11 transformer and inverter units; including access tracks and site entrance along existing roadway; associated electrical cabling and ducting; security gates, 2.6m palisade perimeter security fencing; CCTV system; landscaping works and all other associated ancillary infrastructure at

Ballyoughter , Ballaghaderreen , Co. Roscommon.

1.3km
2660302N/A22 Jun 2026

Permission is sought for Grid System Services Limited, applying for a 10-year permission to develop an Energy Storage System, which will connect to the adjoining ESB Tonroe 110kV Electricity Substation. The proposed development will have a projected life span of 35 years. The development will consist of the construction of 1) enclosed battery energy storage system within a site compound on a total of up to c. 2.33 hectare site, to include: 1 no. single storey 110kV customer substation, control and switch rooms; up to 44 battery blocks on concrete support structures including heating, ventilation and air conditioning unit (HVAC units); up to 11 transformer and inverter units; including access tracks and site entrance along existing roadway; associated electrical cabling and ducting; security gates, 2.6m palisade perimeter security fencing; CCTV system; landscaping works and all other associated ancillary infrastructure at

Ballyoughter , Ballaghaderreen , Co. Roscommon.

1.3km
2460537REFUSED15 Nov 2024

Permission is sought for Grid System Services Limited, applying for a 10 year permission to develop an Energy Storage System, which will connect to the nearby ESB Tonroe 110kV Electricity Substation on land at Ballyoughter, Ballaghaderreen, County Roscommon. The proposed development will have a projected life span of 35 years. The development will consist of the construction of 1) enclosed battery energy storage system within a site compound on a total of up to c.2.33 hectare site, to include: 1 no. single storey 110kV customer substation, control and switch rooms; up to 44 battery blocks on concrete support structures including heating, ventilation and air conditioning unit (HVAC units); up to 11 transformer and inverter units; including access tracks and site entrance along existing roadway; associated electrical cabling and ducting; security gates, 2.6m palisade perimeter security fencing; CCTV system; landscaping works and all other associated ancillary infrastructure at

Ballyoughter , Ballaghaderreen , Co. Roscommon.

1.4km
18300CONDITIONAL22 Jun 2018

for the development of a grid system service facility within a total site area of up to 0.55 hectares , to include 1 no. single storey electrical substation building, 1 no. customer switchgear container, 15 no. electrical inverter/transformer station modules (SKIDS) 10 no. containerised battery storage modules on concrete support structures, 20 no. heating, ventilation and air conditioning units (HVAC units) access tracks and upgraded site entrance, associated electrical cabling an ducting, security gates, perimeter security fencing, CCTV security monitoring system, culvert, landscaping works and all associated ancillary infrastructure on land at

Ballyoughter , Ballaghadereen , Co. Roscommon

1.4km
2560444CONDITIONAL15 Sept 2025

Permission to construct a single storey dwelling house and domestic waste water treatment system on site, together with all ancillary site works and services at

Toobrackan , Ballaghaderreen , Co. Roscommon.

1.4km
2460173CONDITIONAL18 Apr 2024

Permission for development at a c.1.6 ha site on ESB lands at the existing Tonroe 110kV Substation. The development will consist of a physical extension of c. 313 sq.m to the existing electricity substation compound and will include: (a) Site clearance works including the partial removal of: 1) Existing palisade fence along the north-eastern compound boundary; and 2) Existing vegetation along the north-eastern compound boundary. (b) Provision of new electrical plant and equipment including: 1) 1 No. prefabricated MV GIS module and foundation (c. 32m2 and c. 4.7m high); 2) 2 No. 38/20 kV 15 MVA transformers, associated bunds and firewall (c. 15m2 and 5.1 m high); 3) Extension of existing 38kV busbar with 2 no. new 38kV cubicles (c. 6.5m high); 4) Associated and ancillary outdoor electrical equipment and other apparatus, including installation of underground cables; and 5) Site development works including provision of extension of lighting; internal access road; new fencing; provision of site services including drainage; and all other ancillary works at

Kilcolman and Ballyoughter , Ballaghaderreen , Co. Roscommon.

1.5km
17172CONDITIONAL21 Apr 2017

Retention Planning Permission, to retain, as constructed on site, dwelling house and all ancillary site works at

Tullaghanmore or Edmondstown Demesne Td. , Ballaghaderreen , Co. Roscommon

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?