Permission to construct a single storey dwelling house and domestic waste water treatment system on site, together with all ancillary site works and services at

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    15 Sept 2025

  2. Further information requested

    7 Nov 2025

  3. Further information received

    11 Mar 2026

  4. Decision due

    7 May 2026

  5. Decision: CONDITIONAL

    7 May 2026

  6. Grant issued

    11 Jun 2026

Application Details

Location
Toobrackan , Ballaghaderreen , Co. Roscommon.
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Roscommon County Council
Site Area
0.262 ha
Floor Area
153 sq m
Residential Units
1

Timeline

Registration Date
15 September 2025
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
7 May 2026
Grant Date
11 June 2026
Permission Expires
10 June 2031

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

262m
20283CONDITIONAL20 Jul 2020

to construct a proposed new 732 square metre industrial unit, proprietary effluent treatment system and soil polishing filter, complete with all associated works at

Toobrackan , Ballaghaderreen , Co. Roscommon

950m
22272CONDITIONAL3 Jun 2022

Permission for the following: (1) Construction of a new detached dwelling house; (2) Proposed effluent treatment system and percolation area with all associated site works at

Ballyoughter , Ballaghaderreen , Co. Roscommon

950m
2460120CONDITIONAL11 Mar 2024

Permission for the following: (1) Construction of a new domestic garage with all associated site works at

Ballyoughter , Ballaghaderreen , Co. Roscommon.

979m
2660243N/A23 May 2026

Permission is sought for Grid System Services Limited, applying for a 10 year permission to develop an Energy Storage System , which will connect to the adjoining ESB Tonroe 110kV Electricity Substation on land at Ballyoughter, Ballaghaderreen, County Roscommon. The proposed development will have a projected life span of 35 years. The development will consist of the construction of 1) enclosed battery energy storage system within a site compound on a total of up to c.2.33 hectare site, to include: 1 no. single storey 110kV customer substation, control and switch rooms; up to 44 battery blocks on concrete support structures including heating, ventilation and air conditioning unit (HVAC units); up to 11 transformer and inverter units; including access tracks and site entrance along existing roadway; associated electrical cabling and ducting; security gates, 2.6m palisade perimeter security fencing; CCTV system; landscaping works and all other associated ancillary infrastructure at

Ballyoughter , Ballaghaderreen , Co. Roscommon.

979m
2660302N/A22 Jun 2026

Permission is sought for Grid System Services Limited, applying for a 10-year permission to develop an Energy Storage System, which will connect to the adjoining ESB Tonroe 110kV Electricity Substation. The proposed development will have a projected life span of 35 years. The development will consist of the construction of 1) enclosed battery energy storage system within a site compound on a total of up to c. 2.33 hectare site, to include: 1 no. single storey 110kV customer substation, control and switch rooms; up to 44 battery blocks on concrete support structures including heating, ventilation and air conditioning unit (HVAC units); up to 11 transformer and inverter units; including access tracks and site entrance along existing roadway; associated electrical cabling and ducting; security gates, 2.6m palisade perimeter security fencing; CCTV system; landscaping works and all other associated ancillary infrastructure at

Ballyoughter , Ballaghaderreen , Co. Roscommon.

987m
2460537REFUSED15 Nov 2024

Permission is sought for Grid System Services Limited, applying for a 10 year permission to develop an Energy Storage System, which will connect to the nearby ESB Tonroe 110kV Electricity Substation on land at Ballyoughter, Ballaghaderreen, County Roscommon. The proposed development will have a projected life span of 35 years. The development will consist of the construction of 1) enclosed battery energy storage system within a site compound on a total of up to c.2.33 hectare site, to include: 1 no. single storey 110kV customer substation, control and switch rooms; up to 44 battery blocks on concrete support structures including heating, ventilation and air conditioning unit (HVAC units); up to 11 transformer and inverter units; including access tracks and site entrance along existing roadway; associated electrical cabling and ducting; security gates, 2.6m palisade perimeter security fencing; CCTV system; landscaping works and all other associated ancillary infrastructure at

Ballyoughter , Ballaghaderreen , Co. Roscommon.

1.0km
18300CONDITIONAL22 Jun 2018

for the development of a grid system service facility within a total site area of up to 0.55 hectares , to include 1 no. single storey electrical substation building, 1 no. customer switchgear container, 15 no. electrical inverter/transformer station modules (SKIDS) 10 no. containerised battery storage modules on concrete support structures, 20 no. heating, ventilation and air conditioning units (HVAC units) access tracks and upgraded site entrance, associated electrical cabling an ducting, security gates, perimeter security fencing, CCTV security monitoring system, culvert, landscaping works and all associated ancillary infrastructure on land at

Ballyoughter , Ballaghadereen , Co. Roscommon

1.1km
2460173CONDITIONAL18 Apr 2024

Permission for development at a c.1.6 ha site on ESB lands at the existing Tonroe 110kV Substation. The development will consist of a physical extension of c. 313 sq.m to the existing electricity substation compound and will include: (a) Site clearance works including the partial removal of: 1) Existing palisade fence along the north-eastern compound boundary; and 2) Existing vegetation along the north-eastern compound boundary. (b) Provision of new electrical plant and equipment including: 1) 1 No. prefabricated MV GIS module and foundation (c. 32m2 and c. 4.7m high); 2) 2 No. 38/20 kV 15 MVA transformers, associated bunds and firewall (c. 15m2 and 5.1 m high); 3) Extension of existing 38kV busbar with 2 no. new 38kV cubicles (c. 6.5m high); 4) Associated and ancillary outdoor electrical equipment and other apparatus, including installation of underground cables; and 5) Site development works including provision of extension of lighting; internal access road; new fencing; provision of site services including drainage; and all other ancillary works at

Kilcolman and Ballyoughter , Ballaghaderreen , Co. Roscommon.

1.2km
20402CONDITIONAL2 Oct 2020

to 1. demolish existing house and to construct replacement house on similar footprint. 2. to construct new domestic garage and new site entrance and all ancillary site development works at

Kilcolman , Ballaghaderreen , Co. Roscommon

1.2km
17312CONDITIONAL12 Jul 2017

for development of: (a) The alteration and re-roofing of the existing dwelling house, including raising the ridge level similar to that of the adjacent dwelling house, in turn providing additional first floor accommodation. Also the improvement of the on site parking/turning. (b) The retention of the existing domestic garage/shed together with all ancillary site works at

28 Kilcolman Estate , Ballaghaderreen , Co. Roscommon

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?