← Back to search

Corky's On The Quay , Markievicz Road/Holborn Street , Sligo

CONDITIONAL

Planning application 17206

Sligo - Sligo County Council

Proposed Development

development consisting of the change of use at basement and ground levels from public house to a single residential apartment dwelling including associated alterations to the ground floor elevations

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    30 May 2017

  2. Further information requested

    19 Jul 2017

  3. Further information received

    25 Jul 2017

  4. Decision: CONDITIONAL

    16 Aug 2017

  5. Decision due

    21 Aug 2017

  6. Grant issued

    16 Sept 2017

Application Details

Location
Corky's On The Quay , Markievicz Road/Holborn Street , Sligo
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Sligo County Council
Site Area
0.018 ha

Timeline

Registration Date
30 May 2017
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
16 August 2017
Grant Date
16 September 2017
Permission Expires
15 September 2022

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
20333CONDITIONAL28 Sept 2020

Development consisting of the following: 1. Change of use of existing basement/ground floor apartment to Dental Office, 2. New signage to ground floor

Markievicz Road/Holborn Street , Sligo

18m
2360017CONDITIONAL1 Feb 2023

change of use of existing commercial units to revert back to residential

Unit 4 Firefly foot & ankle clinic , Markievicz Road , Sligo

36m
2460070CONDITIONAL12 Mar 2024

Proposed Internal Alterations to existing apartment No. 5 including stairs access to new roof level extension circa. 31m2 including all service connections and associated site works

Markievicz Rd , Sligo , Co. Sligo

41m
2660246CONDITIONAL25 Jun 2026

The demolition of an existing derelict two-storey structure fronting Holborn Street; the construction of an extension and associated works to the existing residential building at 7–8 Markievicz Road to provide two additional one-bedroom apartments, fully served by the existing access, stair core and lift; the provision of ancillary ground-floor bicycle storage, refuse storage and plant accommodation accessed from Holborn Street for the benefit of the existing and proposed residential units; the provision of a roof terrace and an external access ladder to facilitate safe access to the existing roof of 7–8 Markievicz Road for plant and water tank maintenance; and all associated site works, services, drainage and ancillary works

Holborn Street , , Sligo

41m
2660018REFUSED22 Jan 2026

development consisting of: the demolition of an existing derelict two-storey structure fronting Holborn Street; the construction of an extension and associated works to the existing residential building at 7–8 Markievicz Road to provide two additional one-bedroom apartments, fully served by the existing access, stair core and lift; the provision of ancillary ground-floor bicycle storage, refuse storage and plant accommodation accessed from Holborn Street for the benefit of the existing and proposed residential units; the provision of a roof terrace and an external access ladder to facilitate safe access to the existing roof of 7–8 Markievicz Road for plant and water tank maintenance; and all associated site works, services, drainage and ancillary works

Holborn Street , Sligo , Co. Sligo

54m
2560516CONDITIONAL10 Dec 2025

the demolition of an existing single story extension to the rear and existing shed; the construction of a single story flat roof extension to the rear (west elevation) of an existing 2 story terraced dwelling; the construction of a dormer roof to the rear (west elevation) attic space; addition of 1no. skylight to the front (east elevation) and all associated ground works

24 Holborn Street , Sligo , Co. Sligo

77m
17255CONDITIONAL4 Jul 2017

development consisting of the removal of a portion of the internal cashier's desk and insertion of a secure automation wall to house 2 no. ATMs (the property is a protected structure)

Ulster Bank , Stephen Street , Sligo

77m
2364CONDITIONAL1 Jun 2023

development consisting of carrying out external works on a protected structure for the removal of 2 no. ATM's, to be infilled with glazing to match the existing. The removal of the night safe front plate, replacing with a blank steel plate, as well as the removal of the Ulster Bank raised lettering shop sign, general bus stop signs and the removal of the Ulster Bank general blue signage on Stephen St and Markievicz Rd. Carry out internal works for the removal of the ATM's in stud walls, as well as the removal of loose furniture and the removal of Ulster Bank signage and merchandise on all floors

Stephen Street , Abbeyquarter North , Sligo

82m
2560236CONDITIONAL6 Jun 2025

WE, TRAVAC DEVELOPMENTS LTD. intend to apply for PERMISSION for development at this site, SwanPoint, Fish Quay, Sligo, Co Sligo. The development will consist of: a) 1st Floor pedestrian link between the existing Glasshouse Hotel and the SwanPoint building, circa 32m2

SwanPoint , Fish Quay , Sligo

88m
2560475REFUSED13 Nov 2025

a) 6th floor, extensions to two previously granted apartments, circa 48 sqm b) 7th floor, an additional two number, two-bedroom apartments, circa 175 sqm c) 8th floor, an additional two number, two-bedroom apartments, circa 157.5 sqm

Swan Point , Fish Quay , Sligo

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?