Unit 4 Firefly foot & ankle clinic , Markievicz Road , Sligo
CONDITIONALPlanning application 2360017
Sligo - Sligo County Council
Proposed Development
change of use of existing commercial units to revert back to residential
View the full application file on the council's planning portal →Application Timeline
Application received
1 Feb 2023
Decision due
28 Mar 2023
Decision: CONDITIONAL
28 Mar 2023
Grant issued
3 May 2023
Application Details
- Location
- Unit 4 Firefly foot & ankle clinic , Markievicz Road , Sligo
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Sligo County Council
- Site Area
- 0.17 ha
Timeline
- Registration Date
- 1 February 2023
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 28 March 2023
- Grant Date
- 3 May 2023
- Permission Expires
- 2 May 2028
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Development consisting of the following: 1. Change of use of existing basement/ground floor apartment to Dental Office, 2. New signage to ground floor
Markievicz Road/Holborn Street , Sligo
development consisting of the change of use at basement and ground levels from public house to a single residential apartment dwelling including associated alterations to the ground floor elevations
Corky's On The Quay , Markievicz Road/Holborn Street , Sligo
Proposed Internal Alterations to existing apartment No. 5 including stairs access to new roof level extension circa. 31m2 including all service connections and associated site works
Markievicz Rd , Sligo , Co. Sligo
The demolition of an existing derelict two-storey structure fronting Holborn Street; the construction of an extension and associated works to the existing residential building at 7–8 Markievicz Road to provide two additional one-bedroom apartments, fully served by the existing access, stair core and lift; the provision of ancillary ground-floor bicycle storage, refuse storage and plant accommodation accessed from Holborn Street for the benefit of the existing and proposed residential units; the provision of a roof terrace and an external access ladder to facilitate safe access to the existing roof of 7–8 Markievicz Road for plant and water tank maintenance; and all associated site works, services, drainage and ancillary works
Holborn Street , , Sligo
development consisting of: the demolition of an existing derelict two-storey structure fronting Holborn Street; the construction of an extension and associated works to the existing residential building at 7–8 Markievicz Road to provide two additional one-bedroom apartments, fully served by the existing access, stair core and lift; the provision of ancillary ground-floor bicycle storage, refuse storage and plant accommodation accessed from Holborn Street for the benefit of the existing and proposed residential units; the provision of a roof terrace and an external access ladder to facilitate safe access to the existing roof of 7–8 Markievicz Road for plant and water tank maintenance; and all associated site works, services, drainage and ancillary works
Holborn Street , Sligo , Co. Sligo
development consisting of the removal of a portion of the internal cashier's desk and insertion of a secure automation wall to house 2 no. ATMs (the property is a protected structure)
Ulster Bank , Stephen Street , Sligo
development consisting of carrying out external works on a protected structure for the removal of 2 no. ATM's, to be infilled with glazing to match the existing. The removal of the night safe front plate, replacing with a blank steel plate, as well as the removal of the Ulster Bank raised lettering shop sign, general bus stop signs and the removal of the Ulster Bank general blue signage on Stephen St and Markievicz Rd. Carry out internal works for the removal of the ATM's in stud walls, as well as the removal of loose furniture and the removal of Ulster Bank signage and merchandise on all floors
Stephen Street , Abbeyquarter North , Sligo
WE, TRAVAC DEVELOPMENTS LTD. intend to apply for PERMISSION for development at this site, SwanPoint, Fish Quay, Sligo, Co Sligo. The development will consist of: a) 1st Floor pedestrian link between the existing Glasshouse Hotel and the SwanPoint building, circa 32m2
SwanPoint , Fish Quay , Sligo
the demolition of an existing single story extension to the rear and existing shed; the construction of a single story flat roof extension to the rear (west elevation) of an existing 2 story terraced dwelling; the construction of a dormer roof to the rear (west elevation) attic space; addition of 1no. skylight to the front (east elevation) and all associated ground works
24 Holborn Street , Sligo , Co. Sligo
a) 6th floor, extensions to two previously granted apartments, circa 48 sqm b) 7th floor, an additional two number, two-bedroom apartments, circa 175 sqm c) 8th floor, an additional two number, two-bedroom apartments, circa 157.5 sqm
Swan Point , Fish Quay , Sligo
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?