← Back to search

Cregg , Rosses Point , Sligo

CONDITIONAL

Planning application 2072

Sligo - Sligo County Council

Proposed Development

development consisting of 1. Permission to alter elevations and plans of existing dwelling house 2. construction of extension to dwelling house 3. upgrade of onsite wastewater treatment system 4. Relocation of existing vehicular entrance and all associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    5 Mar 2020

  2. Decision: CONDITIONAL

    12 Jun 2020

  3. Decision due

    24 Jun 2020

  4. Grant issued

    21 Jul 2020

Application Details

Location
Cregg , Rosses Point , Sligo
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Sligo County Council
Site Area
0.274 ha
Floor Area
112 sq m
Residential Units
1

Timeline

Registration Date
5 March 2020
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
12 June 2020
Grant Date
21 July 2020
Permission Expires
20 July 2025

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
205N/A13 Jan 2020

development consisting of 1. Permission to alter elevations and plans of existing dwelling house 2. Construction of extension to dwelling house 3. Upgrade of onsite wastewater treatment system and all associate site works.

Cregg , Rosses Point , Co. Sligo

19m
2124N/A3 Feb 2021

development consisting of the following (1) to demolish existing dwelling house and construct new single storey dwelling house with detached domestic garage, new onsite wastewater treatment system and all associated site works (2) relocation of existing vehicular entrance and all associated site works

Cregg , Rosses Point , Co. Sligo

22m
22428CONDITIONAL16 Dec 2022

development consisting of (1) demolish existing dwelling house and construct new single storey dwelling house with new onsite wastewater treatment system and all associated site works (2) relocate the existing vehicular entrance and all associated site works

Cregg , Rosses Point , Co. Sligo

198m
22238CONDITIONAL11 Jul 2022

development consisting of (a) the demolition of existing adjoining garage, (b) the extension and renovation of the existing house, and (c) the decommissioning of existing septic tank and upgrade to new on-site wastewater treatment system, together with all other associated site works and services

Cregg , Rosses Point , Co. Sligo

199m
20262CONDITIONAL7 Aug 2020

development consisting of the retention of (1) Single storey domestic garage (26.5m2) (2) 4 No. Roof lights to the front elevation of the existing dwelling

Cregg , Rosses Point , Co. Sligo

202m
2560118CONDITIONAL27 Mar 2025

proposed construction of a single storey detached domestic garage to the side of existing dwelling house, proposed revised site curtilage and all associated landscaping and site works

Cregg , Rosses Point , Co. Sligo

242m
2360216N/A19 Aug 2023

The Owner of the facility at Cregg Village is experiencing very high electrical energy usage on site. The facility has now become fully occupied and active in its capacity as temporary accommodation for refugees fleeing the ongoing conflict in Ukraine. To alleviate the high energy usage, costs and associated carbon footprint, the owner of the facility is looking to obtain planning permission to supply and install a new 600kWp Ground mounted, The proposed ground mounted PV system shall be installed over two (2) number Phases. Phase 1 shall consist of 300kW of ground mounted solar PV being installed to meet the facilities current on site electrical demand. It is envisaged that Phase 2 will progress at a later date in tandem with the facilities planned electrification of their heating system over the coming Five (5) years. The 300kW installed under Phase 2 will be designed to meet the electrical input power required to satisfy the thermal loadings of future heat pump systems. The primary purpose for both phase 1 & phase 2 PV arrays will be for on site self consumption to meet the existing on site electricity usage, in instances where there is over production in summer months, the PV array will export any excess energy to the national grid under the Clean Export Guarantee (CEG). New in ground ducting shall be installed on site to reticulate DC and AC cabling back to the facilities Main Distribution Board at the boiler plant room. The proposed location for the solar PV array is not currently in use and consists of overgrown scrub, which will be cleared as required to accommodate each phase. The array will be south facing and located on unused lands to the south of the facility. To the East of the proposed array there is also a Zone of Archaeological Notification to recorded monument RMP SL008-128----Ringfort Rath located on the lands of the neighboring school "St. Cecilia's N.S.". As per our archeological survey , the new solar PV array will have zero impact on this site and natural screening of the abundant vegetation and mature trees around the monument will screen it from the proposed development. A Landscape and Visual Impact Assessment (LVIA) study was carried out on the proposal. Based on the landscape and visual impact judgements provided throughout the LVIA, the proposed Ground Mounted Solar Array is not considered to give rise to any significant residual impacts. Instead, landscape impacts are not considered to exceed ‘Moderate-slight’ s

Rosses Punto Limited , Cregg Village , Rosses Point

243m
2360250CONDITIONAL20 Sept 2023

Development consisting of the Installation of 600kw (1,696m2) Of ground mounted solar PV array and associated site works and services. The ground mounted PV array will be installed over two (2) number phases. Phase 1, which will consist of 300kw of ground mounted solar PV to meet the facilities current onsite electrical requirements. Phase 2, will also consist of another 300kw Of ground mounted solar PV. It Is envisaged that Phase 2 will progress in tandem with the facilities planned electrification of their heating system over the coming five (5) years. Included In this application is a visual impact assessment, an appropriate assessment screening, an ecological impact assessment report, a glint & glare assessment & an archaeological impact assessment.

Cregg Village , Rosses Point , Co. Sligo

321m
17284CONDITIONAL24 Jul 2017

Retention of as constructed (1) single storey extension (13 m2)to the side of dwelling house and (2) single storey domestic garage (29 m2)

Cregg , Rosses Point , Co. Sligo

339m
2460137CONDITIONAL26 Apr 2024

A new energy centre comprising a boiler house, heat pump and gas enclosure (combined area 150m2) and ancillary site works.

St. Cecilia's School Cregg Rosses Point Co. Sligo F91 X283 ,

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?