← Back to search

St. Cecilia's School Cregg Rosses Point Co. Sligo F91 X283 ,

CONDITIONAL

Planning application 2460137

Sligo - Sligo County Council

Proposed Development

A new energy centre comprising a boiler house, heat pump and gas enclosure (combined area 150m2) and ancillary site works.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    26 Apr 2024

  2. Decision: CONDITIONAL

    19 Jun 2024

  3. Decision due

    20 Jun 2024

  4. Grant issued

    23 Jul 2024

Application Details

Location
St. Cecilia's School Cregg Rosses Point Co. Sligo F91 X283 ,
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Sligo County Council
Site Area
0.401 ha

Timeline

Registration Date
26 April 2024
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
19 June 2024
Grant Date
23 July 2024
Permission Expires
22 July 2029

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

33m
19340CONDITIONAL16 Aug 2019

development consisting of the installation and construction of detached 80m2 general portacabin classroom on site with all associated site works including connection to onsite services.

St. Cecilia's School , Cregg , Co. Sligo

55m
20195CONDITIONAL2 Jul 2020

development consisting of the following: installation and construction of 2 detached 80m2 General Portacabin Classrooms on site with all associated site works including connection to onsite services

St Cecilia's School , Cregg , Co. Sligo

160m
2360250CONDITIONAL20 Sept 2023

Development consisting of the Installation of 600kw (1,696m2) Of ground mounted solar PV array and associated site works and services. The ground mounted PV array will be installed over two (2) number phases. Phase 1, which will consist of 300kw of ground mounted solar PV to meet the facilities current onsite electrical requirements. Phase 2, will also consist of another 300kw Of ground mounted solar PV. It Is envisaged that Phase 2 will progress in tandem with the facilities planned electrification of their heating system over the coming five (5) years. Included In this application is a visual impact assessment, an appropriate assessment screening, an ecological impact assessment report, a glint & glare assessment & an archaeological impact assessment.

Cregg Village , Rosses Point , Co. Sligo

161m
2360216N/A19 Aug 2023

The Owner of the facility at Cregg Village is experiencing very high electrical energy usage on site. The facility has now become fully occupied and active in its capacity as temporary accommodation for refugees fleeing the ongoing conflict in Ukraine. To alleviate the high energy usage, costs and associated carbon footprint, the owner of the facility is looking to obtain planning permission to supply and install a new 600kWp Ground mounted, The proposed ground mounted PV system shall be installed over two (2) number Phases. Phase 1 shall consist of 300kW of ground mounted solar PV being installed to meet the facilities current on site electrical demand. It is envisaged that Phase 2 will progress at a later date in tandem with the facilities planned electrification of their heating system over the coming Five (5) years. The 300kW installed under Phase 2 will be designed to meet the electrical input power required to satisfy the thermal loadings of future heat pump systems. The primary purpose for both phase 1 & phase 2 PV arrays will be for on site self consumption to meet the existing on site electricity usage, in instances where there is over production in summer months, the PV array will export any excess energy to the national grid under the Clean Export Guarantee (CEG). New in ground ducting shall be installed on site to reticulate DC and AC cabling back to the facilities Main Distribution Board at the boiler plant room. The proposed location for the solar PV array is not currently in use and consists of overgrown scrub, which will be cleared as required to accommodate each phase. The array will be south facing and located on unused lands to the south of the facility. To the East of the proposed array there is also a Zone of Archaeological Notification to recorded monument RMP SL008-128----Ringfort Rath located on the lands of the neighboring school "St. Cecilia's N.S.". As per our archeological survey , the new solar PV array will have zero impact on this site and natural screening of the abundant vegetation and mature trees around the monument will screen it from the proposed development. A Landscape and Visual Impact Assessment (LVIA) study was carried out on the proposal. Based on the landscape and visual impact judgements provided throughout the LVIA, the proposed Ground Mounted Solar Array is not considered to give rise to any significant residual impacts. Instead, landscape impacts are not considered to exceed ‘Moderate-slight’ s

Rosses Punto Limited , Cregg Village , Rosses Point

249m
2660153CONDITIONAL28 Apr 2026

to retain detached building to rear of an existing dwelling house

Cregg , Co. Sligo , F91 X4H0

339m
205N/A13 Jan 2020

development consisting of 1. Permission to alter elevations and plans of existing dwelling house 2. Construction of extension to dwelling house 3. Upgrade of onsite wastewater treatment system and all associate site works.

Cregg , Rosses Point , Co. Sligo

339m
2072CONDITIONAL5 Mar 2020

development consisting of 1. Permission to alter elevations and plans of existing dwelling house 2. construction of extension to dwelling house 3. upgrade of onsite wastewater treatment system 4. Relocation of existing vehicular entrance and all associated site works

Cregg , Rosses Point , Sligo

358m
22428CONDITIONAL16 Dec 2022

development consisting of (1) demolish existing dwelling house and construct new single storey dwelling house with new onsite wastewater treatment system and all associated site works (2) relocate the existing vehicular entrance and all associated site works

Cregg , Rosses Point , Co. Sligo

358m
2124N/A3 Feb 2021

development consisting of the following (1) to demolish existing dwelling house and construct new single storey dwelling house with detached domestic garage, new onsite wastewater treatment system and all associated site works (2) relocation of existing vehicular entrance and all associated site works

Cregg , Rosses Point , Co. Sligo

443m
22238CONDITIONAL11 Jul 2022

development consisting of (a) the demolition of existing adjoining garage, (b) the extension and renovation of the existing house, and (c) the decommissioning of existing septic tank and upgrade to new on-site wastewater treatment system, together with all other associated site works and services

Cregg , Rosses Point , Co. Sligo

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?