St Cecilia's School , Cregg , Co. Sligo
CONDITIONALPlanning application 20195
Sligo - Sligo County Council
Proposed Development
development consisting of the following: installation and construction of 2 detached 80m2 General Portacabin Classrooms on site with all associated site works including connection to onsite services
View the full application file on the council's planning portal →Application Timeline
Application received
2 Jul 2020
Decision: CONDITIONAL
13 Aug 2020
Decision due
26 Aug 2020
Grant issued
28 Sept 2020
Application Details
- Location
- St Cecilia's School , Cregg , Co. Sligo
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Sligo County Council
- Site Area
- 1.003 ha
Timeline
- Registration Date
- 2 July 2020
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 13 August 2020
- Grant Date
- 28 September 2020
- Permission Expires
- 27 September 2025
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
development consisting of the installation and construction of detached 80m2 general portacabin classroom on site with all associated site works including connection to onsite services.
St. Cecilia's School , Cregg , Co. Sligo
A new energy centre comprising a boiler house, heat pump and gas enclosure (combined area 150m2) and ancillary site works.
St. Cecilia's School Cregg Rosses Point Co. Sligo F91 X283 ,
Development consisting of the Installation of 600kw (1,696m2) Of ground mounted solar PV array and associated site works and services. The ground mounted PV array will be installed over two (2) number phases. Phase 1, which will consist of 300kw of ground mounted solar PV to meet the facilities current onsite electrical requirements. Phase 2, will also consist of another 300kw Of ground mounted solar PV. It Is envisaged that Phase 2 will progress in tandem with the facilities planned electrification of their heating system over the coming five (5) years. Included In this application is a visual impact assessment, an appropriate assessment screening, an ecological impact assessment report, a glint & glare assessment & an archaeological impact assessment.
Cregg Village , Rosses Point , Co. Sligo
The Owner of the facility at Cregg Village is experiencing very high electrical energy usage on site. The facility has now become fully occupied and active in its capacity as temporary accommodation for refugees fleeing the ongoing conflict in Ukraine. To alleviate the high energy usage, costs and associated carbon footprint, the owner of the facility is looking to obtain planning permission to supply and install a new 600kWp Ground mounted, The proposed ground mounted PV system shall be installed over two (2) number Phases. Phase 1 shall consist of 300kW of ground mounted solar PV being installed to meet the facilities current on site electrical demand. It is envisaged that Phase 2 will progress at a later date in tandem with the facilities planned electrification of their heating system over the coming Five (5) years. The 300kW installed under Phase 2 will be designed to meet the electrical input power required to satisfy the thermal loadings of future heat pump systems. The primary purpose for both phase 1 & phase 2 PV arrays will be for on site self consumption to meet the existing on site electricity usage, in instances where there is over production in summer months, the PV array will export any excess energy to the national grid under the Clean Export Guarantee (CEG). New in ground ducting shall be installed on site to reticulate DC and AC cabling back to the facilities Main Distribution Board at the boiler plant room. The proposed location for the solar PV array is not currently in use and consists of overgrown scrub, which will be cleared as required to accommodate each phase. The array will be south facing and located on unused lands to the south of the facility. To the East of the proposed array there is also a Zone of Archaeological Notification to recorded monument RMP SL008-128----Ringfort Rath located on the lands of the neighboring school "St. Cecilia's N.S.". As per our archeological survey , the new solar PV array will have zero impact on this site and natural screening of the abundant vegetation and mature trees around the monument will screen it from the proposed development. A Landscape and Visual Impact Assessment (LVIA) study was carried out on the proposal. Based on the landscape and visual impact judgements provided throughout the LVIA, the proposed Ground Mounted Solar Array is not considered to give rise to any significant residual impacts. Instead, landscape impacts are not considered to exceed ‘Moderate-slight’ s
Rosses Punto Limited , Cregg Village , Rosses Point
to retain detached building to rear of an existing dwelling house
Cregg , Co. Sligo , F91 X4H0
development consisting of 1. Permission to alter elevations and plans of existing dwelling house 2. Construction of extension to dwelling house 3. Upgrade of onsite wastewater treatment system and all associate site works.
Cregg , Rosses Point , Co. Sligo
development consisting of 1. Permission to alter elevations and plans of existing dwelling house 2. construction of extension to dwelling house 3. upgrade of onsite wastewater treatment system 4. Relocation of existing vehicular entrance and all associated site works
Cregg , Rosses Point , Sligo
development consisting of the following (1) to demolish existing dwelling house and construct new single storey dwelling house with detached domestic garage, new onsite wastewater treatment system and all associated site works (2) relocation of existing vehicular entrance and all associated site works
Cregg , Rosses Point , Co. Sligo
development consisting of (1) demolish existing dwelling house and construct new single storey dwelling house with new onsite wastewater treatment system and all associated site works (2) relocate the existing vehicular entrance and all associated site works
Cregg , Rosses Point , Co. Sligo
(a) the construction of two split level side extensions and a single storey rear extension following the demolition of the existing left hand side extension and existing extensions to the rear elevation; (b) the incorporation of a new garage area into the existing topography of the land to the front of the dwelling; (c) the construction of a storey and a half detached leisure building, (d) the creation of a new site entrance from the public road with gates and pillars, (e) the installation of a new tertiary treatment system with infiltration/treatment area and (f) associated site works.