Summerhill College , Knocknaganny , College Road
N/APlanning application 2156
Sligo - Sligo County Council
Proposed Development
development consisting of the construction of an all new all-weather pitch enclosure with a synthetic all-weather grass surface, associated fencing, footpath, ball-stop netting, 6 No. flood lighting masts and ancillary services. The development will be located to the southern end of the site and include levelling off existing ground to provide for the new pitch. It will also include the widening of the existing L-92137 road to provide vehicular and pedestrian access to the west of the site. The Development will include modification of the internal roads, provision of new parking and a bus set down area. It will include associated and ancillary works, services, landscaping and site works
View the full application file on the council's planning portal →Application Timeline
Application received
24 Feb 2021
Further information requested
20 Apr 2021
Further information received
15 Oct 2021
Application withdrawn
9 Nov 2021
Application Details
- Location
- Summerhill College , Knocknaganny , College Road
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Sligo County Council
- Site Area
- 3.19 ha
Timeline
- Registration Date
- 24 February 2021
- Status
- WITHDRAWN
- Decision
- N/A
- Withdrawn
- 9 November 2021
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
development consisting of the installation of floodlighting and ball stop netting in the existing allweather pitch. It will also include an intensification of use to allow the pitch to be used during the evenings and at weekends. The proposed intensification of use will also include permission to rent out the facility
Summerhill College , Knocknaganny , College Road
development consisting of the construction of a part two-storey and part single storey extension with pitched roofs to the East of the existing school. The single storey extension includes 2 x SEN Classrooms with toilets and ancillary spaces. The two-storey extension includes 4 classrooms, a wood technology room with preparation area, 2 science laboratories with a preparation area, an office, new locker spaces, storage, toilets, stairs and a lift. It will include a service yard and access road to the south. It will include associated and ancillary works, services, landscaping, steps, ramps and site works. It will include the relocation of 8 existing car spaces within the site to accommodate the extension
Summerhill College , Knocknaganny , College Road
Development consisting of the installation of 3 no. temporary classrooms and 1 no. special education needs classroom at the existing school including connection to existing on-site services and all associated ancillary works (the proposed works will be carried out within the curtilage of protected structure (RPS no 29 on map sheet no 1012-11).
Summerhill College , College Road , Knocknaganny
a) A new single storey energy centre comprising an internal plant room with roof mounted photovoltaic panels and associated external compound, along with a sub-station and switch room. b) 24 permanent car spaces with covered canopy incorporating photovoltaic panels (300 m²). c) Associated alterations to car parking, drainage and site works. Permission is also sought for the retention of the existing car park on a temporary basis for 10 years. The car park shall have a reduced parking capacity of 294 spaces (excluding the 24 spaces mentioned above)
Department of Social Protection , College Road , Sligo
The development will consist of a deep energy retrofit comprising the following: 1) New energy centre comprising a plant room with deck at ground level and reduced floor level below ground, external compound for an air source heat pump, and a sub-station and switch room. 2) Car park canopies incorporating photovoltaic panels (800 m²). 3) Associated alterations to car parking, drainage and site works.
Department of Social Protection , College Road , Sligo
1) Elevational modifications including replacement windows and external wall insulation, also high-level fibre cement panels over the existing red brick band. 2) Alterations to entrance lobby at southern elevation and modifications to the staff entrance at the north elevation. 3) New covered bicycle parking to south side of the building. 4) Associated external works including signage, new hard and soft landscaping and car charging points
Department of Social Protection , College Road , Sligo
Development consisting of new access and gates. The access is proposed in the roadside boundary wall within the curtilage of the former Summerhill College which is a Protected Structure, RPS No 29.
Circular Road , Sligo
development consisting of 58 No. Dwelling units comprising (1) 8 No. 4 bedroom semi-detached 2 -storey dwellinghouses, 2 No. 3 bedroom semi-detached 2-storey dwellinghouses, 2 No. Blocks of 2-storey terraced houses with 2 No. 4 bedroom dwellinghouses and 4 No. 3-bedroom dwellinghouses in each block, total 22 No. housing units. (2) 1 No. 5-storey apartment block(including basement) comprising 16 No. 2-bedroom apartments and 1 No. 6-storey apartment block (including basement) comprising 10 No. 3-bedroom apartments and 10 No. 2-bedroom apartments, with internal circulation and services areas in each block, total 36 apartments, also with associated car and bicycle parking, bin storage and storage areas and circulation at each apartment block basement level, all together with connection to existing public sewer network via Summerhill Village including all necessary enabling works, creation of new access from Circular Road and also estate road network and paths including traffic calming measures as shown, creation of public open spaces, works to site boundaries as shown, and all other ancillary site works and services including ESB sub-station and public lighting as shown
Magherboy and Caltragh , Circular Road , Sligo
The development will comprise the construction of 53 no. new residential units on a 1..19 ha site consisting of: • 19 no. 1 bed duplex units • 15 no. 2 bed apartments • 19 no. 3/4 bed duplex units The works will consist of the creation of a new site access from Circular Road that includes a raised tabletop with a controlled pedestrian crossing, car parking and bicycle parking, foul pumping station and rising main to an existing public foul sewer on Circular Road, sustainable drainage system, street lighting, open space, landscaping and all ancillary site works.
Circular Road , Townlands of Magheraboy and Caltragh , Sligo
development consisting of a ground floor extension to rear and side of existing house and extension to bedroom on the first floor to side of house and widening of the entrance gate to front drive
No. 91 , Crozon Park , Knocknaganny
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?