← Back to search

3-4, Crag Avenue, Clondalkin Industrial Estate, Clondalkin, Dublin 12

Seek Clarification of Additional Information

Planning application ED20/0055

Dublin - South Dublin County Council

Proposed Development

Temporary compound to facilitate the diversion/undergrounding of existing ESB 38kV overhead lines and installation of new underground 110kV grid connections associated with development permitted under Reg Ref SD18A/0068 (as amended by Reg Ref. SD19A/0185).

View the full application file on the council's planning portal →

Application Timeline

  1. Further information requested

    21 Jan 2021

  2. Application received

    24 Feb 2021

  3. Further information received

    24 Feb 2021

  4. Decision: Seek Clarification of Additional Information

    16 Mar 2021

  5. Decision due

    23 Mar 2021

Application Details

Location
3-4, Crag Avenue, Clondalkin Industrial Estate, Clondalkin, Dublin 12
Applicant
N/A
Application Type
Declaration of Exemption Sect. 5
Planning Authority
South Dublin County Council
Site Area
544.368629255858 ha

Timeline

Registration Date
24 February 2021
Status
Decision Following A.I.
Decision
Seek Clarification of Additional Information
Decision Date
16 March 2021

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

17m
SD26A/0004WGrant Permission & Grant Retention8 Jan 2026

The proposed development includes retention permission for the reorientation of the gas AGI (above-ground installation) compound permitted under SDCC Reg. Ref.: SD23A/0158 and to retain an existing Gas AGI skid located to the north of the gas AGI compound. The development also includes the retention and completion of an extension to the existing Gas AGI compound to the south, to provide for a pressure regulating and metering station (PRMS) compound area. The PRMS compound extension comprises the following buildings and gas related infrastructure:•Skid House structure with a total area of c. 118 sq.m and overall height of c.3m. •E&I Kiosk with a total area of c. 11 sq.m and overall height of c. 2.7m •Boiler House comprising 2 no. individual units (Boiler House 1 & Boiler House 2) both with an area of c. 22 sq.m and overall height of c.3m. •Gas Quality Building with a total area of c. 3 sq.m and overall height of c. 2.4.m • All associated and ancillary works including valves and pipework, site lighting, boundary treatments, landscaping, drainage and infrastructure. The proposed development is located within a site which is subject to an EPA Industrial Emissions (IE) Directive license.

3-4, Crag Avenue, Clondalkin Industrial Estate, Clondalkin, Dublin 22

88m
SD09A/0339Granted27 Aug 2009

Relocation of approved vehicular entrance to the western corner of the site boundary, an increase in the approved width of the entrance from 9m to 12m, and an extension of the existing roadside boundary wall and associated landscaping.

Unit B17, Canal Turn, Clondalkin Industrial Estate, Clondalkin, Dublin 22.

88m
SD03A/0200Granted8 Apr 2003

Extension of 1845m.sq. to the existing meat processing facility in unit B17, linking to and incorporating Unit B16 into the facility, comprising marshalling, storage, plant rooms, waste area, canteen, toilets, dispatch office and ancillary works.

Tender Meats Ltd., 17B, Canal Turn, Clondalkin Industrial Estate, Clondalkin, Dublin 22

90m
SD18A/0342Refuse Permission for Retention24 Sept 2018

Retention sought for conversion of industrial unit to place of worship/church (456sq.m), new signage and associated works.

18/2, Canal Turn, Crag Terrace, Clondalkin, Dublin 22

92m
S00A/0320Granted15 May 2000

2 number extensions to existing food processing facility for washing and storage at rear and side.

Unit B17, Canal Turn, Clondalkin Industrial Estate, Dublin 22.

98m
SD18A/0282Refuse Permission for Retention7 Aug 2018

Retention sought for conversion of 2 storey commercial unit to place of workship/church (430sq.m.), new signage and associated works.

18/2A Canal Turn, Crag Terrace, Clondalkin, Dublin 22

116m
SD19A/0023Granted22 Jul 2019

370sq.m side & rear extension & new entrance.

Unit 18/1, Clondalkin Industrial Estate, Dublin 22

116m
SD26A/0067WRefused15 May 2026

370sqm side and rear extension, new entrance, and new facade to front elevation.

Unit 18/1, Clondalkin Industrial Estate, Dublin 22, D22 Y6V3

116m
SD25A/0254WInvalidate Application8 Oct 2025

370sqm side and rear extension, new entrance, and new façade to front elevation.

Unit 18/1, Clondalkin Industrial Estate, Dublin 22, D22 Y6V3

133m
SD10A/0174Granted16 Jun 2010

11.5m high water storage tank (capacity 520m3), and a new pump room (c. 17.5sq.m) to rear of existing warehouse and associated signage.

17, Crag Terrace, Clondalkin Industrial Estate, Dublin 22.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?