Demolition of existing building and provision of new single storey dwelling and sewage treatment facility.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    18 Feb 2000

  2. Decision due

    14 Apr 2000

  3. Decision: Grant Permission

    14 Apr 2000

  4. Grant issued

    30 May 2000

Application Details

Location
Ballinascorney Upper, Brittas, Co. Dublin.
Applicant
N/A
Application Type
Permission
Planning Authority
South Dublin County Council
Site Area
6.8 ha

Timeline

Registration Date
18 February 2000Other applications received that week
Status
Decision
Decision
Grant Permission
Decision Date
14 April 2000
Grant Date
30 May 2000

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

64m
S99A/0773Refused29 Oct 1999

Demolition of existing building and provision of new single storey dwelling and sewage treatment facility.

Ballinascorney Upper, Tallaght, Dublin 24.

277m
SD05A/0595Refused20 Jul 2005

Dormer bungalow with associated waste water treatement system and associated new entrance.

Site at Ballinascorney, Brittas, Co Dublin

374m
S00B/0587Granted22 Sept 2000

Retention of single storey extension with tiled roof and roof lights to side of existing house.

Uppercross, Upper Ballinascorney, Brittas, Co.Dublin.

374m
SD15B/0139Granted27 Apr 2015

First floor extension over the existing single storey side extension consisting of 2 bedrooms with en-suites, new chimney stack, removal of existing dormer roof window on the south elevation, 2 new dormer roof windows on the south elevation, alterations to the 2 existing dormer roof windows on the north elevation, widening of the existing first floor balcony on the west elevation, 2 balconies at first floor on the east elevation, 4 roof lights, bay entrance doors extension at ground level on the west elevation, minor elevational changes, alterations to the internal layout and all associated site works.

Sleepy Hollow, Uppercross, Upper Ballinascorney, Brittas, Co. Dublin

475m
S99A/0378Granted4 Jun 1999

Extension to existing building to accommodate workshop, small store and additional living accommodation with new vehicular entrance.

St. Martin's Ballinascorney Upper, Co. Dublin.

530m
SD08A/0788Refused20 Nov 2008

Bungalow complete with packaged waste water treatment system and percolation area and forming a new vehicular access from public roadway to site and works to front site boundary.

Ballinascorney, Brittas, Co. Dublin.

654m
ED08/0016Declared Exempt29 May 2008

Erection of a temporary roof to begin the drying out progress of the barn. We are proposing to re-use the roof that was erected on the existing shell of Ballinascorney House. Some works have been done to the barn in order to ensure its safety and protection from the excavations permitted under Planning Reference SD07A/0183. Proposed emergency works also include the bracing of the existing openings and the propping up of the southwest corner of the barn. The barn is a Protected Structure and an inportant part of the Ballinascorney House Curtilage.

Ballinascorney House, Ballinascorney Upper, Brittas, Co. Dublin

679m
ED07/0002Declared Exempt12 Feb 2007

1. Demolition of the tops of the existing chimney stacks to just below the proposed temporary roof of the main house only. This will stop water penetration into the building and the chimneys themselves. By removing the top of the chimneys we will achieve a more secure water barrier than flashing against the chimneys and capping them separately. The chimney stacks will be reconstructed pending planning permission. 2. The erection of a temporary roof with generous eaves over the main house only. This will start the long drying out process of the rubble and lime mortar walls that have been exposed to the elements for 20 years. 3. The boarding up of the existing windows in the main house only, to prevent rain penetration of the interior. This will involve the removal of the rotten remnants of the single remaining sash frame. The frame will be kept to allow copies to be made for re-insertion into all the windows at a later date.

Ballinascorney House, Ballinascorney Upper, Brittas, Co. Dublin

729m
SD06A/0435Refused30 May 2006

Detached bungalow with pitched roof over, attic room with Velux roof lights in rear and side of roof, new waste water treatment unit and percolation area, bored well, new vehicular entrance and ancillary works on site.

Ballinascorney Road Upper, Brittas, Co. Dublin

763m
SD18A/0032Refused31 Jan 2018

254sq.m dormer house, wastewater treatment unit, new entrance and associated works.

Ballinascorney Upper, Ballinascorney, Co. Dublin

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?