Site at Ballinascorney, Brittas, Co Dublin
RefusedPlanning application SD05A/0595
Dublin - South Dublin County Council
Proposed Development
Dormer bungalow with associated waste water treatement system and associated new entrance.
Application Timeline
Application received
20 Jul 2005
Further information requested
9 Sept 2005
Further information received
20 Dec 2005
Decision: Refuse Permission
20 Jan 2006
Decision due
25 Jan 2006
Appeal submitted
16 Feb 2006
Appeal decided: Refuse Permission
21 Aug 2006
Application Details
- Location
- Site at Ballinascorney, Brittas, Co Dublin
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- South Dublin County Council
- Site Area
- 4500 ha
- Floor Area
- 201 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 20 July 2005Other applications received that week
- Status
- Appeal decided
- Decision
- Refuse Permission
- Decision Date
- 20 January 2006
- Permission Expires
- 22 August 2006
An Coimisiún Pleanála Appeal
- Appeal Reference
- PL 06S.216390
- Status
- Appeal decided
- Decision
- Refuse Permission
- Submitted
- 16 February 2006
- Decided
- 21 August 2006
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Retention of single storey extension with tiled roof and roof lights to side of existing house.
Uppercross, Upper Ballinascorney, Brittas, Co.Dublin.
First floor extension over the existing single storey side extension consisting of 2 bedrooms with en-suites, new chimney stack, removal of existing dormer roof window on the south elevation, 2 new dormer roof windows on the south elevation, alterations to the 2 existing dormer roof windows on the north elevation, widening of the existing first floor balcony on the west elevation, 2 balconies at first floor on the east elevation, 4 roof lights, bay entrance doors extension at ground level on the west elevation, minor elevational changes, alterations to the internal layout and all associated site works.
Sleepy Hollow, Uppercross, Upper Ballinascorney, Brittas, Co. Dublin
Demolition of existing building and provision of new single storey dwelling and sewage treatment facility.
Ballinascorney Upper, Tallaght, Dublin 24.
Bungalow complete with packaged waste water treatment system and percolation area and forming a new vehicular access from public roadway to site and works to front site boundary.
Ballinascorney, Brittas, Co. Dublin.
Demolition of existing building and provision of new single storey dwelling and sewage treatment facility.
Ballinascorney Upper, Brittas, Co. Dublin.
Detached bungalow with pitched roof over, attic room with Velux roof lights in rear and side of roof, new waste water treatment unit and percolation area, bored well, new vehicular entrance and ancillary works on site.
Ballinascorney Road Upper, Brittas, Co. Dublin
Application for Registration of a Quarry under Section 261 of Planning & Develop
Ballinascorney Quarry, Townland Of Ballinascorney Upper, Co. Dublin.
254sq.m dormer house, wastewater treatment unit, new entrance and associated works.
Ballinascorney Upper, Ballinascorney, Co. Dublin
Erection of a temporary roof to begin the drying out progress of the barn. We are proposing to re-use the roof that was erected on the existing shell of Ballinascorney House. Some works have been done to the barn in order to ensure its safety and protection from the excavations permitted under Planning Reference SD07A/0183. Proposed emergency works also include the bracing of the existing openings and the propping up of the southwest corner of the barn. The barn is a Protected Structure and an inportant part of the Ballinascorney House Curtilage.
Ballinascorney House, Ballinascorney Upper, Brittas, Co. Dublin
1. Demolition of the tops of the existing chimney stacks to just below the proposed temporary roof of the main house only. This will stop water penetration into the building and the chimneys themselves. By removing the top of the chimneys we will achieve a more secure water barrier than flashing against the chimneys and capping them separately. The chimney stacks will be reconstructed pending planning permission. 2. The erection of a temporary roof with generous eaves over the main house only. This will start the long drying out process of the rubble and lime mortar walls that have been exposed to the elements for 20 years. 3. The boarding up of the existing windows in the main house only, to prevent rain penetration of the interior. This will involve the removal of the rotten remnants of the single remaining sash frame. The frame will be kept to allow copies to be made for re-insertion into all the windows at a later date.
Ballinascorney House, Ballinascorney Upper, Brittas, Co. Dublin
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?