67A Cherry Orchard Industrial Estate, Dublin 10

Granted

Planning application S01A/0010

Dublin - South Dublin County Council

Proposed Development

New light industrial unit of 454 sq.m on the ground floor, mezzanine of 74 sq.m and a Ridge Height of 6.6m, for use as a light-industrial and storage unit to the side of the existing light industrial unit

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    10 Jan 2001

  2. Decision due

    7 Mar 2001

  3. Decision: Grant Permission

    8 Mar 2001

  4. Grant issued

    26 Apr 2001

Application Details

Location
67A Cherry Orchard Industrial Estate, Dublin 10.
Applicant
N/A
Application Type
Permission
Planning Authority
South Dublin County Council
Site Area
3884 ha
Floor Area
528 sq m

Timeline

Registration Date
10 January 2001
Status
Decision
Decision
Grant Permission
Decision Date
8 March 2001
Grant Date
26 April 2001

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

74m
SD15A/0349Grant Permission & Grant Retention20 Nov 2015

(A) Retention for the following: (I) external cladding to front facade, (ii) pedestrian access door to front elevation, (iii) second floor storage space over offices with 4 windows to front elevation and (B) Full planning permission for the following: (i) new roller shutter door to west/side elevation, (ii) new roller shutter door to the north/rear elevation, (iii) new two storey extension to existing internal office space to east side of building to include reception area, first floor office , modified bathroom arrangements, removal of existing roller shutter door and insertion of glazed unit incorporating double pedestrian doors at ground floor level and windows at first floor level, (iv) minor internal modifications and all associated site development works.

Unit 67, Cherry Orchard Industrial Estate, Ballyfermot Road, Dublin 10

81m
ED16/0024Declared Not Exempt17 Feb 2017

Erection of fencing & 2 access gates to front of premises as shown on attached drawings.

67 Cherry Orchard Industrial Estate, Ballyfermot, Dublin 20.

104m
SD04A/0765Granted13 Oct 2004

Two storey extension at rear and side.

Factory at rear of No. 1, Johnstown Cottages, Kennelsfort Road, Palmerstown, Dublin 20

104m
SD04A/0685Invalid - Site Notice10 Sept 2004

2 storey extension at rear and side of factory unit located at rear.

Factory at rear of No. 1, Johnstown Cottages, Kennelsfort Road, Palmerstown, Dublin 20

105m
ED24/0002Declared Exempt24 Jan 2024

Confirm that the temporary use of the building as overnight accommodation for displaced persons or persons seeking international protection is exempted development.

Unit 64 & 65, Cherry Orchard Industrial Estate, Palmerstown

105m
SD04A/0543Granted22 Jul 2004

Extension to side of existing warehouse unit to provide new 5.8m - 6.5m high self contained warehouse unit to include a ground floor warehouse with mezzanine ancillary accommodation.

Unit 68, Cherryorchard Industrial Estate, Ballyfermot, Dublin 10

112m
S00A/0499Refused18 Jul 2000

Retain as erected 2 advertising billboards.

64/65 Cherryorchard Industrial Estate, Ballyfermot, Dublin 10.

114m
SD18A/0009Invalid - Site Notice15 Jan 2018

(a) Partial change of use of existing light industrial unit to recreation facility/family entertainment centre, (b) removal of existing roller shutter door located along the front elevation and insertion of glazed unit incorporating double pedestrian doors at ground floor level with windows at first floor level, (c) internal modifications to include reception area, play school, revised toilet arrangements, kitchen/servery and all ancillary spaces pertinent to that of a family entertainment centre at ground floor level and office space/storage at mezzanine level, (d) revised pedestrian escape door arrangement alongside elevation, (e) enclosed secure bin store to be located to front of building, (f) connection to all existing mains services on-site and all associated development works.

Unit 67, Cherry Orchard Industrial Estate, Ballyfermot Road, Dublin 10

114m
SD18A/0075Refused1 Jun 2018

(a) Partial change of use of existing light industrial unit to recreation facility/family entertainment centre, (b) permission for removal of existing roller shutter door located along the front elevation and insertion of glazed unit incorporating double pedestrian doors at ground floor level with windows at first floor level, (c) internal modifications to include reception area, play school, revised toilet arrangements, kitchen/servery and all ancillary spaces pertinent to that of a family entertainment centre at ground floor level and office space/storage at mezzanine level, (d) revised pedestrian escape door arrangement along side elevation, (e) enclosed secure bin store to be located to front of building, (f) connection to all existing mains services on-site and all associated development works.

Unit 67, Cherry Orchard Industrial Estate, Ballyfermot Road, Dublin 10

116m
SHD3ABP-312430-22Refuse Approval11 Jan 2022

Demolition of an existing warehouse / factory building and the construction of a residential development of 144 apartments with supporting tenant amenity facilities (gym and activity areas, lounges and meeting room), employment uses including 2 incubator units and a remote working space, building management facilities and all ancillary site development works. The proposed development includes 72 1-bedroom apartment and 72 2-bedroom apartments to be provided as follows: Building A (35 1-bedroom & 24 2-bedroom over 5-9 storeys), Building B (7 1-bedroom & 10 2-bedroom over 3-4-storeys), Building C (16 1-bedroom, 19 2-bedroom over 5-storeys), Building D (14 1-bedroom & 19 2-bedroom over 4-5-storeys). Vehicular access to the proposed development will be provided via an entrance from the existing estate road as accessed from Kennelsfort Road Upper. The proposal includes improvement works on the northern side of the junction at the estate road/Kennelsfort Road Upper, new pedestrian/cycle paths on the estate road to the south of the site, and provision of a controlled pedestrian crossing on Kennelsfort Road Upper to the west as part of enabling infrastructure. The proposed development provides for outdoor amenity areas, landscaping, external podium lift, under-podium and street car parking, bicycle parking, bin stores, ESB substation, public lighting, roof mounted solar panels and all ancillary site development works.

Units 64 &65, Cherry Orchard Industrial Estate and Kennelsfort Road Upper, Palmerstown, Dublin 10