← Back to search

Unit 67, Cherry Orchard Industrial Estate, Ballyfermot Road, Dublin 10

Grant Permission & Grant Retention

Planning application SD15A/0349

Dublin - South Dublin County Council

Proposed Development

(A) Retention for the following: (I) external cladding to front facade, (ii) pedestrian access door to front elevation, (iii) second floor storage space over offices with 4 windows to front elevation and (B) Full planning permission for the following: (i) new roller shutter door to west/side elevation, (ii) new roller shutter door to the north/rear elevation, (iii) new two storey extension to existing internal office space to east side of building to include reception area, first floor office , modified bathroom arrangements, removal of existing roller shutter door and insertion of glazed unit incorporating double pedestrian doors at ground floor level and windows at first floor level, (iv) minor internal modifications and all associated site development works.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    20 Nov 2015

  2. Decision: Grant Permission & Grant Retention

    21 Jan 2016

  3. Decision due

    25 Jan 2016

  4. Grant issued

    1 Mar 2016

Application Details

Location
Unit 67, Cherry Orchard Industrial Estate, Ballyfermot Road, Dublin 10
Applicant
N/A
Application Type
Permission and Retention
Planning Authority
South Dublin County Council
Site Area
8170 ha
Floor Area
159 sq m

Timeline

Registration Date
20 November 2015
Status
Decision
Decision
Grant Permission & Grant Retention
Decision Date
21 January 2016
Grant Date
1 March 2016

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

8m
ED16/0024Declared Not Exempt17 Feb 2017

Erection of fencing & 2 access gates to front of premises as shown on attached drawings.

67 Cherry Orchard Industrial Estate, Ballyfermot, Dublin 20.

40m
SD18A/0009Invalid - Site Notice15 Jan 2018

(a) Partial change of use of existing light industrial unit to recreation facility/family entertainment centre, (b) removal of existing roller shutter door located along the front elevation and insertion of glazed unit incorporating double pedestrian doors at ground floor level with windows at first floor level, (c) internal modifications to include reception area, play school, revised toilet arrangements, kitchen/servery and all ancillary spaces pertinent to that of a family entertainment centre at ground floor level and office space/storage at mezzanine level, (d) revised pedestrian escape door arrangement alongside elevation, (e) enclosed secure bin store to be located to front of building, (f) connection to all existing mains services on-site and all associated development works.

Unit 67, Cherry Orchard Industrial Estate, Ballyfermot Road, Dublin 10

40m
SD18A/0075Refused1 Jun 2018

(a) Partial change of use of existing light industrial unit to recreation facility/family entertainment centre, (b) permission for removal of existing roller shutter door located along the front elevation and insertion of glazed unit incorporating double pedestrian doors at ground floor level with windows at first floor level, (c) internal modifications to include reception area, play school, revised toilet arrangements, kitchen/servery and all ancillary spaces pertinent to that of a family entertainment centre at ground floor level and office space/storage at mezzanine level, (d) revised pedestrian escape door arrangement along side elevation, (e) enclosed secure bin store to be located to front of building, (f) connection to all existing mains services on-site and all associated development works.

Unit 67, Cherry Orchard Industrial Estate, Ballyfermot Road, Dublin 10

74m
S01A/0010Granted10 Jan 2001

New light industrial unit of 454 sq.m on the ground floor, mezzanine of 74 sq.m and a Ridge Height of 6.6m, for use as a light-industrial and storage unit to the side of the existing light industrial unit

67A Cherry Orchard Industrial Estate, Dublin 10.

104m
SD08A/0045Grant Permission for Retention27 Mar 2008

Single storey 'lean-to' to the rear of unit and planning permission is sought for a new usage at the front area of the building for use as a 90sq.m. cafe outlet (presently light industrial / office use) creating a sub-division of the unit into cafe and industrial unit, the construction of a new mezzanine floor within the industrial portion, increasing the internal area from 977sq.m. to 1390sq.m., a new fire door and zinc cladding to the front elevation and associated works.

Unit 14, Cherry Orchard Industrial Estate, Palmerstown, Ballyfermot, Dublin 20.

115m
S00A/0655Granted19 Sept 2000

Retention of the internal sub-divison of Unit 14 into Unit 14(1) and 14(2) as manufacturing/warehousing including retention of internal first floor offices in Unit 14(1) and internal Ground floor offices in Unit 14 (2)

Unit 14, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10.

123m
SD06A/0804Granted18 Sept 2006

Single storey extension to the side of light industrial unit (163.2sq.m.) for warehouse use.

Unit 37, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10

126m
S01A/0627Granted25 Sept 2001

Two storey office/warehouse extension between existing warehouse buildings and associated site works and elevational treatment.

32, 33 & 34 Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10.

127m
SD09A/0243Granted10 Jun 2009

Modification of internal mezzanine at first floor level and increase in height of rear section of building (6.455n) to accommodate additional (approx. 15sq.m.) mezzanine. The building is subject of previously approved Planning Permission Reg. Ref. SD08A/0657.

rear of Unit 14B, Cherry Orchard Industrial Estate, Dublin 10

127m
SD08A/0657Granted18 Sept 2008

Demolition of existing sub standard ground floor internal accomodation, construction of new internal office area on ground & first floor, new internal mezzanine at first floor level, single storey extension to rear for Shot Blast & Paint area 3.9m high. Alterations to elevations, roller shutter security screens to front elevation, new roller shutter doors to side elevations, new side security gates & screen wall approx. 3m high. Solar panels to roof on south/east elevation, new zinc panel cladding to front & part side elevation, new signage with over illumation at high level on front elevation & all ancillary works.

Unit 14B, Cherry Orchard Industrial Estate, Dublin 10

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?