Old ESB Training Centre, Cherry Orchard Industrial Estate, Ballyfermot Road, , Dublin 10
RefusedPlanning application S01A/0778
Dublin - South Dublin County Council
Proposed Development
Construction of a 36m high, free standing communication tower carrying communication dishes and antennae, with associated ground-mounted equipment cabinets as part of ESB's Communications system and as well to share with other licensed operators all within a 2.4m high pallisade fenced compound with double access gates.
View the full application file on the council's planning portal →Application Timeline
Application received
23 Nov 2001
Decision due
18 Jan 2002
Decision: Refuse Permission
21 Jan 2002
Appeal submitted
19 Feb 2002
Appeal decided: Refuse Permission
30 Jul 2002
Application Details
- Location
- Old ESB Training Centre, Cherry Orchard Industrial Estate, Ballyfermot Road, , Dublin 10.
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- South Dublin County Council
- Site Area
- 300 ha
Timeline
- Registration Date
- 23 November 2001
- Status
- Appeal decided
- Decision
- Refuse Permission
- Decision Date
- 21 January 2002
- Permission Expires
- 20 August 2002
An Coimisiún Pleanála Appeal
- Appeal Reference
- PL 06S.128708
- Status
- Appeal decided
- Decision
- Refuse Permission
- Submitted
- 19 February 2002
- Decided
- 30 July 2002
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Retention of change of use of Unit 8 to a refuse transfer station; and Unit B1 from a warehouse to a refuse transfer station.
Units 8 & B1, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10.
Change of use of Unit 8 to a refuse transfer station; and change of use of Unit B1 from a warehouse to a refuse transfer station. The activity will require a Waste Licence.
Units 8 & B1, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10
To construct 2,730sq. m. of warehousing in 2 no. blocks A and B (8.25m and 7m high respectively) including 857sq. m of integral related office accommodation/staff facilities on one / two floor/s together with access road, service utilities, boundary fences, landscaping, planting, paving, parking and associated site development works. Block A will be subdivided into a maximum 7 units. Block B (an extension to the rear of the existing unit 8) will be subdivided into a maximum 2 units all at unit 8.
Unit 8, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10
253sq.m. extension (9.25m high) including 85sq.m. of ancillary office/staff facilities on 2 floors and associated car parking. Previously Approved (Reg. Ref. SD05A/0244) Block A.
Unit 8, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10.
Revised elevations to previously approved (Reg. Ref. SD04A/0183) Block A.
Unit 8, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10
Retention of use of warehouse as industrial unit and for the installation of a lift shaft, paper filtration equipment, collection bins and ducting to rear of unit.
Unit 6, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10.
Alterations at ground floor with mezzanine floor over and for alterations to front elevation facade.
Unit 14D, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10
Erect security railings and landscaping
Securiscreen Ltd, Unit 17, Cherry Orchard Ind. Est
The retention of 54sq.m of internal office space on first floor along with 2 windows.
Unit 17, Cherry Orchard Industrial Estate, Dublin 10
1. Removal of existing diesel tank and external block bund area 2. Removal of small disused storage area beside tank 3. Insertion of CP6FR fuel retention seperator unit from Carlow Pre-Cast Ltd 4. Addition of new 9000 ltr bunded diesel tank and associated ground works.
16, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?