← Back to search

Unit 6, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10

Declared Withdrawn

Planning application SD03A/0718

Dublin - South Dublin County Council

Proposed Development

Retention of use of warehouse as industrial unit and for the installation of a lift shaft, paper filtration equipment, collection bins and ducting to rear of unit.

View the full application file on the council's planning portal →

Application Timeline

  1. Further information requested

    18 Nov 2003

  2. Application received

    10 May 2004

  3. Further information received

    10 May 2004

  4. Decision due

    7 Jun 2004

  5. Application withdrawn

    12 Jan 2005

  6. Decision: Declared Withdrawn

    12 Jan 2005

Application Details

Location
Unit 6, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10.
Applicant
N/A
Application Type
Retention
Planning Authority
South Dublin County Council
Site Area
1950 ha
Floor Area
10 sq m

Timeline

Registration Date
10 May 2004
Status
Decision
Decision
Declared Withdrawn
Decision Date
12 January 2005
Permission Expires
21 May 2004
Withdrawn
12 January 2005

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

46m
SD17A/0225Granted10 Jul 2017

The change of use of existing warehouse to gymnastics studio sports facility, with new front door and window at ground floor, minor internal modifications and all associated and ancillary site works.

Unit 4, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10

47m
SD05A/0721Granted25 Aug 2005

Change of use of Unit 8 to a refuse transfer station; and change of use of Unit B1 from a warehouse to a refuse transfer station. The activity will require a Waste Licence.

Units 8 & B1, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10

48m
SD14A/0062Grant Permission for Retention31 Mar 2014

Retention of change of use of Unit 8 to a refuse transfer station; and Unit B1 from a warehouse to a refuse transfer station.

Units 8 & B1, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10.

63m
S01A/0778Refused23 Nov 2001

Construction of a 36m high, free standing communication tower carrying communication dishes and antennae, with associated ground-mounted equipment cabinets as part of ESB's Communications system and as well to share with other licensed operators all within a 2.4m high pallisade fenced compound with double access gates.

Old ESB Training Centre, Cherry Orchard Industrial Estate, Ballyfermot Road, , Dublin 10.

72m
SD20A/0183Grant Permission for Retention23 Jul 2020

The retention of 54sq.m of internal office space on first floor along with 2 windows.

Unit 17, Cherry Orchard Industrial Estate, Dublin 10

76m
ED09/0019Declared Exempt16 Jul 2009

1. Removal of existing diesel tank and external block bund area 2. Removal of small disused storage area beside tank 3. Insertion of CP6FR fuel retention seperator unit from Carlow Pre-Cast Ltd 4. Addition of new 9000 ltr bunded diesel tank and associated ground works.

16, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10

76m
S01A/0201Granted4 Apr 2001

Erect security railings and landscaping

Securiscreen Ltd, Unit 17, Cherry Orchard Ind. Est

88m
SD05A/0476Granted16 Jun 2005

253sq.m. extension (9.25m high) including 85sq.m. of ancillary office/staff facilities on 2 floors and associated car parking. Previously Approved (Reg. Ref. SD05A/0244) Block A.

Unit 8, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10.

89m
WEB2529/26Registered Application19 Jun 2026

The development will consist of the construction of a dormer window in the main roof to the rear of the house, an attic level window in the gable wall and a single-storey porch to the front of the house and all associated site works.

21, Cleggan Park, Dublin 10, D10 DH94

89m
SD04A/0183Granted18 May 2004

To construct 2,730sq. m. of warehousing in 2 no. blocks A and B (8.25m and 7m high respectively) including 857sq. m of integral related office accommodation/staff facilities on one / two floor/s together with access road, service utilities, boundary fences, landscaping, planting, paving, parking and associated site development works. Block A will be subdivided into a maximum 7 units. Block B (an extension to the rear of the existing unit 8) will be subdivided into a maximum 2 units all at unit 8.

Unit 8, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?