21, Cleggan Park, Dublin 10, D10 DH94
Registered ApplicationPlanning application WEB2529/26
Dublin - Dublin City Council
Proposed Development
The development will consist of the construction of a dormer window in the main roof to the rear of the house, an attic level window in the gable wall and a single-storey porch to the front of the house and all associated site works.
Application Timeline
Application received
19 Jun 2026
Decision due
13 Aug 2026
Application Details
- Location
- 21, Cleggan Park, Dublin 10, D10 DH94
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- Dublin City Council
- Site Area
- 329.93 ha
Timeline
- Registration Date
- 19 June 2026
- Status
- Registered Application
- Decision
- Pending
- Decision Due
- 13 August 2026
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Permission for development to remove front boundary wall for vehicular access and footpath dishing.
5, Cleggan Park, Ballyfermot, Dublin 10
The change of use of existing warehouse to gymnastics studio sports facility, with new front door and window at ground floor, minor internal modifications and all associated and ancillary site works.
Unit 4, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10
Single storey enterprise centre comprising of 10 no. units together with associated site works to rear of existing shops and petrol service station.
Cherry Orchard Industrial Estate, Ballyfermot Road, Dublin 10.
Single storey enterprise centre comprising of 10 no. units together with associated site works to rear of existing shops and petrol service station.
Cherry Orchard Industrial Estate, Ballyfermot Road, Dublin 10.
Change of use from bona fida club to use as worship and religious instruction at first floor over the existing shops adjacent to petrol service station.
Cherry Orchard Industrial Estate, Ballyfermot Road, Dublin 10.
Removing existing signage and erecting 11 signs with lighting, on the front south elevation, 1 no. 3.71sq.m. panel sign, 2 no. 0.85m.sq.m. light boxes, 1 no. 3.1 sq.m. light box, 2 no. 0.87sq.m. panel signs, 1 no. 1.03sq.m. panel signs, 1 no. 6.43sq.m. panel signs. On the east elevation, 1 no. 5.35sq.m. panel sign. On the west elevation, 1 no. 5.91sq.m. letters logo. All totalling 28.1sq.m.
Fast Fit, Ballyfermot Road, Ballyfermot, Dublin 10.
Retention of use of warehouse as industrial unit and for the installation of a lift shaft, paper filtration equipment, collection bins and ducting to rear of unit.
Unit 6, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10.
Change of use from retail use (4sq.m) to retail with ancillary off licence use.
Applegreen Service Station, Ballyfermot Road, Cherry Orchard, Dublin 10.
Construction of two storey extension to the side of existing dwelling comprising of wc and utility room at ground floor level and bedroom and en-suite at first floor level. Single storey extension to the rear of existing dwelling comprising of open plan kitchen/dining/living space and all associated site works.
26, Cleggan Park, Ballyfermot, Dublin 10, D10 PX64
Change of use from retail use to retail use with ancillary off-licence.
Applegreen Service Station, Ballyfermot Road, Cherry Orchard, Dublin 10.
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?