← Back to search

Applegreen Service Station, Ballyfermot Road, Cherry Orchard, Dublin 10

Granted

Planning application SD22A/0019

Dublin - South Dublin County Council

Proposed Development

Change of use from retail use (4sq.m) to retail with ancillary off licence use.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    21 Jan 2022

  2. Decision: Grant Permission

    15 Mar 2022

  3. Decision due

    17 Mar 2022

  4. Grant issued

    25 Apr 2022

Application Details

Location
Applegreen Service Station, Ballyfermot Road, Cherry Orchard, Dublin 10.
Applicant
N/A
Application Type
Permission
Planning Authority
South Dublin County Council
Site Area
155 ha
Floor Area
4 sq m

Timeline

Registration Date
21 January 2022
Status
Decision
Decision
Grant Permission
Decision Date
15 March 2022
Grant Date
25 April 2022

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

22m
SD14A/0272Granted10 Dec 2014

Change of use from retail use to retail use with ancillary off-licence.

Applegreen Service Station, Ballyfermot Road, Cherry Orchard, Dublin 10.

22m
SD10A/0267Granted9 Sept 2010

Removing existing signage and erecting 11 signs with lighting, on the front south elevation, 1 no. 3.71sq.m. panel sign, 2 no. 0.85m.sq.m. light boxes, 1 no. 3.1 sq.m. light box, 2 no. 0.87sq.m. panel signs, 1 no. 1.03sq.m. panel signs, 1 no. 6.43sq.m. panel signs. On the east elevation, 1 no. 5.35sq.m. panel sign. On the west elevation, 1 no. 5.91sq.m. letters logo. All totalling 28.1sq.m.

Fast Fit, Ballyfermot Road, Ballyfermot, Dublin 10.

25m
SD09A/0099Grant Permission for Retention12 Mar 2009

Change of use from bona fida club to use as worship and religious instruction at first floor over the existing shops adjacent to petrol service station.

Cherry Orchard Industrial Estate, Ballyfermot Road, Dublin 10.

25m
SD08A/0252Granted20 Jun 2008

Single storey enterprise centre comprising of 10 no. units together with associated site works to rear of existing shops and petrol service station.

Cherry Orchard Industrial Estate, Ballyfermot Road, Dublin 10.

25m
SD08A/0252/EPGrant Extension of Duration of Permission7 Dec 2012

Single storey enterprise centre comprising of 10 no. units together with associated site works to rear of existing shops and petrol service station.

Cherry Orchard Industrial Estate, Ballyfermot Road, Dublin 10.

63m
2916/19GRANT PERMISSION3 May 2019

Permission for development to remove front boundary wall for vehicular access and footpath dishing.

5, Cleggan Park, Ballyfermot, Dublin 10

93m
SD17A/0225Granted10 Jul 2017

The change of use of existing warehouse to gymnastics studio sports facility, with new front door and window at ground floor, minor internal modifications and all associated and ancillary site works.

Unit 4, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10

94m
WEB2529/26Registered Application19 Jun 2026

The development will consist of the construction of a dormer window in the main roof to the rear of the house, an attic level window in the gable wall and a single-storey porch to the front of the house and all associated site works.

21, Cleggan Park, Dublin 10, D10 DH94

97m
SD21A/0100Granted23 Apr 2021

Construction of a revised two storey mono-pitched Discount Foodstore (with ancillary off-licence use), with an increased total gross floor space of 2,415sq.m and an increased net retail sales area of 1,650sq.m (2,144sq.m and 1,400sq.m respectively permitted under SD19A/0286); Associated reconfiguration of site layout and all other associated and ancillary modifications to SD19A/0286 above and below ground level, including modifications to pedestrian access and a new electricity substation and switch room building.

Unit 15, Cherry Orchard Industrial Estate, Ballyfermot Road, Dublin 10

97m
SD04A/0755Granted8 Oct 2004

The development will consist of the demolition of existing industrial and office premises, demolition of boundary wall and railings, removal of existing telecoms mast, and the construction of a discount foodstore (c. 1743 sq.m gross floor area and c.1286 nett main sales area) comprising of a single storey pitched roof structure with enclosed dock leveller removable compactor, new boundary treatments and associated site development works, to provide 163 No. car parking spaces and for the provision of revised vehicular entrance, 1 No. free standing double sided, internally illuminated flagpole sign, 2 no. building mounted internally illuminated signs.

15, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?