← Back to search

1 Newbawn Drive, Tallaght, Dublin 24

Granted

Planning application SD02B/0158

Dublin - South Dublin County Council

Proposed Development

Ground floor canopy to front of existing house and new hip roof on existing side exterior.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    11 Apr 2002

  2. Decision: Grant Permission

    29 May 2002

  3. Decision due

    6 Jun 2002

  4. Grant issued

    10 Jul 2002

Application Details

Location
1 Newbawn Drive, Tallaght, Dublin 24.
Applicant
N/A
Application Type
Permission
Planning Authority
South Dublin County Council
Site Area
0.035 ha
Floor Area
50 sq m

Timeline

Registration Date
11 April 2002
Status
Decision
Decision
Grant Permission
Decision Date
29 May 2002
Grant Date
10 July 2002

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

26m
SD07A/0451Refused15 Jun 2007

Construction of a new 3 bedroomed detached house with velux rooflights to back and extended kitchen on ground floor complete with attic storeroom; also newly formed side passage on both sides of house and newly constructed boundary wall to front and side; this includes all associated site works and all services connected to existing.

2, New Bawn Park, Tallaght, Dublin 24

26m
SD08A/0210Refused31 Mar 2008

3 bedroom detached house with velux rooflights to back and extended kitchen on ground floor complete with attic storage room also newly formed side passage on both sides of house and newly constructed boundary wall to front and side including all associated site works and all services connected to existing.

2, New Bawn Park, Tallaght, Dublin 24

29m
SD06B/0387Granted26 May 2006

Proposed removal of existing flat roof from ground floor partial front extension, ground floor side extension, partial rear extension and replacing with pitched roof.

4, New Bawn Park, Tallaght, Dublin 24

33m
SD06B/0837Granted8 Nov 2006

Second storey extension (c. 26sq.m.) with dormer window to front, 2 no. bay windows to replace existing windows at ground floor with porch roof over.

6, New Bawn Park, Tallaght, Dublin 24

38m
S99B/0325Granted21 May 1999

Single storey extension to the side incorporating porch to front.

9 New Bawn Drive, Tallaght, Dublin 24.

38m
SD07B/0500Granted11 Jun 2007

First floor extension to side with dormer to front and two storey to rear.

9, New Bawn Drive, Dublin 24

40m
S00B/0216Granted1 Jun 2000

Extension to side/rear of existing dwelling.

8 New Bawn Park, Dublin 24.

40m
SD20B/0398Grant Permission for Retention23 Oct 2020

Retention of conversion from garage to utility room and removal of front wall.

8, New Bawn Park, Dublin 24

41m
S99B/0021Granted15 Jan 1999

2 bedrooms and en-suite bathroom at first floor level to side.

2 Newbawn Drive, Tallaght, Dublin 24.

41m
SD10B/0327Granted11 Aug 2010

Construction of a hipped roof with 2 rooflights to replace the existing flat roof on the extension to side; raising the height of the boundary wall with Seskin View Road to 1.8-2.0m from the front building line to the rear.

2, New Bawn Drive, Dublin 24

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?