44, Cherryorchard Industrial Estate, Ballyfermot, Dublin 10
GrantedPlanning application SD03A/0511
Dublin - South Dublin County Council
Proposed Development
Alterations and revisions to extension of existing industrial unit. Planning Reg. Ref. S01A/0466 granted this application to consist of 36 sq. metres extension.
View the full application file on the council's planning portal →Application Timeline
Application received
16 Jul 2003
Decision: Grant Permission
8 Sept 2003
Decision due
9 Sept 2003
Grant issued
29 Oct 2003
Application Details
- Location
- 44, Cherryorchard Industrial Estate, Ballyfermot, Dublin 10
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- South Dublin County Council
- Site Area
- 1120 ha
- Floor Area
- 36 sq m
Timeline
- Registration Date
- 16 July 2003
- Status
- Decision
- Decision
- Grant Permission
- Decision Date
- 8 September 2003
- Grant Date
- 29 October 2003
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Extension to existing industrial unit comprising 106 square metres.
44 Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10.
The addition of 71 sq.m prefabricated internal office space and the addition of 4 no. opening lights to front facade to provide light and ventilation.
73 & 74, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10
Construction of an internal mezzanine storage area (407 metres squared) and ground floor office storage and central heating and equipment trade show rooms (407 metres squared) with new external windows and doors and associated works.
Unit L40, Cherry Orchard Industrial Estate, Dublin 10.
Single storey extension to the side of light industrial unit (163.2sq.m.) for warehouse use.
Unit 37, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10
Extension to side of existing warehouse unit to provide new 5.8m - 6.5m high self contained warehouse unit to include a ground floor warehouse with mezzanine ancillary accommodation.
Unit 68, Cherryorchard Industrial Estate, Ballyfermot, Dublin 10
Modifications to No. 60 consisting of internal access to No. 61; 2 new windows to rear and fire escape stair on first floor; change of use on ground floor of No. 61 from furniture storage to kitchen and food production/storage area.
60/61, Cherry Orchard Industrial Estate, Dublin 10
Demolition of existing 920mm high brick pier and 2 metal rail fence along Ballyfermot Road and for the erection of a new 2.0 metre high galvanised metal security fence, including 2 no. 10.0 metre wide gates and 2 no. 6.0 metre wide gates to provide necessary security along their site boundary enclosing Units 26, 43, 42 and part of Units 41 and 27.
Units 26, 27, 41, 42 And 43, Cherry Orchard Industrial Estate, Dublin 10.
Demolition of existing 920mm high brick pier and 2 metal rail fence along Ballyfermot Road and the erection of a new 2m high galvanised metal security fence, including 2 no. 10m wide gates and 2no. 6m wide gates to provide necessary security along the site boundary enclosing units 26, 43, 42 and part of units 41 and 27 at Cherry Orchard Industrial Estate, Dublin 10.
Cardinal Health, Unit 26, 27, 41, 42 & 43, Cherry Orchard Industrial Estate, Dublin 10
Retention of existing covered areas which link their five adjoining industrial units: (a) 253.0sq. metre single storey building linking Units 26 and 42 and 43 including demolition of east gable wall of Unit 42 and west gable wall of Unit 26; (b) 231.0sq. metre single storey covered yard area linking Units 26, 27, 41 and 42 with new enclosing walls along east and north sides; (c) 90.0 sq. metre single storey general store along north wall of Unit 42 connected to two storey section with 35.0 sq. metre ground floor locker room and first floor over 35.0sq.m. metre tea station including external steel escape stairs with general construction and external finishes matching and not exceeding heights of the existing construction and drainage connections to existing local drains.
Cardinal Health, Unit 26, 27, 41, 42 and 43 Cherry Orchard Industrial Estate, Dublin 10.
Retention of existing covered areas which link their five adjoining industrial units: (a) 253.0sq.m. single storey building linking Units 26 and 42 and 43 including demolition of east gable wall of Unit 42 and west gable wall of Unit 26. (b) 231.0sq.m. single storey covered yard area linking Units 26. 27, 41 and 42 with new enclosing walls along east and north sides. (c) 90.0sq.m. single storey general store along north wall of Unit 42 connected to two storey section with 35.0sq.m. metre ground floor locker room and first floor over 35.sq.m. metre tea station including external steel escape stairs with general construction and external finishes matching and not exceeding heights of the existing construction and drainage connections to existing local drains.
Cardinal Health, Unit 26, 27, 41, 42 and 43, Cherry Orchard Industrial Estate, Dublin 10.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?