← Back to search

Institute of Technology, Tallaght, Dublin 24

Grant Outline Permission

Planning application SD04A/0035

Dublin - South Dublin County Council

Proposed Development

Provision of a grass sports pitch to include fencing, floodlighting and temporary changing facilities at the Institute of Technology

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    16 Jan 2004

  2. Decision: Grant Outline Permission

    10 Mar 2004

  3. Decision due

    11 Mar 2004

  4. Grant issued

    21 Apr 2004

Application Details

Location
Institute of Technology, Tallaght, Dublin 24
Applicant
N/A
Application Type
Outline Permission
Planning Authority
South Dublin County Council
Site Area
18000 ha
Floor Area
15580 sq m

Timeline

Registration Date
16 January 2004
Status
Decision
Decision
Grant Outline Permission
Decision Date
10 March 2004
Grant Date
21 April 2004

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

3m
SD04A/0799Granted11 Mar 2005

Construction of a new 1010m2 three storey building with roof top plant providing office/laboratory accommodation for business-start ups and research.

Institute of Technology, Tallaght, Dublin 24

3m
S99A/0136Granted3 Mar 1999

New Education Centre building providing approximately 640 sq.m. of accommodation over two storeys with a new entrance formed off the Belgard Road, associated car parking for approximately 222 no. car spaces, access roadways/pavements and ancillary mains and local site services.

Institute of Technology, Old Blessington Road, Tallaght, Dublin 24.

23m
SD09A/0327Granted19 Aug 2009

The provision of new vehicular entrance from existing roundabout on Belgard Road & secondary entrance from Greenhills Road (existing vehicular entrance from Old Blessington Road to be retained & existing entrance roadway to be re-aligned): provision of upgraded & new internal roads incorporating cycleways, footpaths & verges within the campus, resulting in the removal of 151 no. existing car parking spaces: reconfiguration & extension of existing car parks & provision of new parking areas throughout the campus resulting in an increase in overall car parking provision from 660 to 808 no spaces - the increase in car parking is parking is provided for by 196 no. additional spaces in a new car park adjacent to the Synergy Building located in the southern area of the campus, 81 no. additional spaces provided as an extension to the existing car park located to the north west of the main IT Tallaght building & 22 additional spaces to the front of the existing campus main building; the existing cycle parking provision( 115no.spaces) will be maintained; upgrading of site services including surface water drainage works; new signage at the new Belgard Road & Greenhill's Road entrances 4.5m(H) x 2.5m(W) x 0.4m(D); provision of new 2.2m high Belgard Road boundary wall/fence - 222m in length, random rubble stone facing & solid steel buffed infill bars; hard & soft landscaping throughout the site & new/upgraded campus street lighting. The above enabling works are proposed to accommodate existing campus activities & to facilitate the future phase of development of the campus which will be the subject of future planning applications.

Lands At Institute Of Technology, Tallaght, Dublin 24

24m
SD25A/0127WGranted28 May 2025

A bicycle storage unit to accommodate 75 no. bicycles to be located within the TU Dublin Tallaght campus, on an area of existing hardstanding to the east of the Main Campus Building and to the west of the Quad, along with all associated site works and services. The bicycle storage unit will be an enclosed, covered single-storey structure. The gross development floor area of the unit will be 101 sqm.

Technological University Dublin Tallaght, Blessington Road,, Tallaght, D24 FKT9

71m
SD19A/0152Granted3 May 2019

(A) Construction of a 4 storey general teaching building (c.5,211sq.m) comprising teaching spaces, class kitchens and restaurant, lecture theatres, labs and computer rooms, breakout spaces and ancillary service area with roof level plant; (B) landscaping works including the provision of a kitchen garden, orchard and wildflower meadow with beehives; (C) 28 covered cycle parking spaces; (D) all associated site development, site services, landscaping and boundary treatment works.

Tallaght Campus, Old Blessington Road, Tallaght, Dublin 24

76m
ED24/0005Declared Not Exempt1 Feb 2024

90m3 underground fire fighting tank

Tallaght Campus, Old Blessington Road, Tallaght, Dublin 24

79m
SD24A/0186Granted22 Jul 2024

Development on a site of c. 0.008 ha located West of the SSR Building of the TU Dublin Tallaght Campus. The development shall consist of the construction of a M&E plant area (28m2) comprising an enclosed pump house and external water tank with 2.4m high screen fencing surround.

TU Dublin, Tallaght Campus, Old Blessington Road, Tallaght, Dublin 24

90m
SD24A/0065Withdraw the Application27 Mar 2024

Development on a site of c. 0.017 ha located West of the SSR Building on the TU Dublin Tallaght Campus, Old Blessington Road, Tallaght, Dublin 24. The development shall consist of the construction of a 90m3 underground firefighting storage tank.

TU Dublin, Tallaght Campus, Old Blessington Road, Tallaght, Dublin 24

91m
SD07A/0984Granted13 Mar 2008

Two storey extension to the existing main building comprising of a new entrance lobby at ground level, extension to staff dining area and a new office at first floor level, and associated refurbishment and site works.

Institute of Technology Tallaght, Belgard Road, Tallaght, Dublin 24

95m
SD24A/0090Granted26 Apr 2024

Development on a site of c. 0.021 ha located West of the SSR Building on the TU Dublin Tallaght Campus, Old Blessington Road, Tallaght, Dublin 24. The development shall consist of the construction of a 90m3 underground fire fighting storage tank.

TU Dublin, Tallaght Campus, Old Blessington Road, Tallaght, Dublin 24

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?