Unit 16, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10
GrantedPlanning application SD05A/0639
Dublin - South Dublin County Council
Proposed Development
The development will consist of a relocated / replacement Cellular Base Station comprising a 30-metre high concrete "bird cage" antennas support structure carrying 9 No. GSM antennas, 10 No. 0.6m diameter link dishes, 9 No. 0.3m diameter link dishes plus, a possible further 3 UMTS antennas and a possible 15 further link dishes ( 3 No. 1.2m diameter, 6 No. 0.6m diameer and 6 No. 0.3m diameter link dishes) with associated containerised equipment containers and security fencing to form part of the digital mobile communications network.
View the full application file on the council's planning portal →Application Timeline
Application received
28 Jul 2005
Decision: Grant Permission
16 Sept 2005
Decision due
20 Sept 2005
Grant issued
26 Oct 2005
Application Details
- Location
- Unit 16, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- South Dublin County Council
- Site Area
- 102 ha
Timeline
- Registration Date
- 28 July 2005
- Status
- Decision
- Decision
- Grant Permission
- Decision Date
- 16 September 2005
- Grant Date
- 26 October 2005
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Retention of the existing 30 metre high telecommunications support structure carrying antennas and link drums/dishes and ground based equipment all enclosed in security fencing.
Unit 16, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10
Retain 30 metre high telecommunications support structure carrying antennas and link drums/dishes and ground based equipment all enclosed in security fencing.
Unit 16, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10
Retention for the change of used of part of an existing warehouse from warehouse to builders’ provider retail sales area. Retention is also sought for the change of use from open yard to ancillary open storage yard and retention of a security hut in the yard and all ancillary works
Unit 16A, Cherry Orchard Industrial Estate, Ballyfermot, Dublin, 10
Warehouse extension to side, second floor office extension to front and security railings and gates around perimeter.
15 Cherry Orchard Industrial Estate, Dublin 10.
Additional warehouse space as an extension to the south of the existing warehouse; additional office space as an extension to the existing office building at the ground and first floors (to east of warehouse and north of office building) and one additional storey of accommodation above the existing two storey office building and extension; railings and gates as a boundary to the road; and ancillary works above and below ground to facilitate the development.
Unit 16, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10
Demolition of existing industrial and offices premises, demolition of boundary wall and railings, for the construction of a discount foodstore (c. 1,732sq.m.) comprising of a single storey pitched roof structure with enclosed dock leveller and compactor, new boundary treatments and associated site development works, to provide 178 no. car parking spaces, and for the provision of revised vehicular entrance, 2 no. free standing double sided, internally illuminated signs, 2 no. building mounted internally illuminated signs.
15, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10.
Ancillary use of the retail area of the previously approved discount food-store, (Planning Ref. SD05A/0323) as off-licence.
Unit 15, Cherry Orchard Industrial Estate, Ballyfermot Road, Dublin 10
Demolition of existing industrial and offices premises, demolition of boundary wall and railings, removal of existing telecoms mast and the construction of a discount foodstore (c. 1,645sq.m. gross floor area and c. 1,286 nett main sales area) comprising of a single storey pitched roof structure with enclosed dock leveller removable compactor, new boundary treatments and associated site development works to provide 163 no. car parking spaces and for the provision of revised vehicular entrance, 1 no. free standing double sided, internally illuminated flagpole sign, 2 no. building mounted internally illuminated signs.
15, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10.
The development will consist of the demolition of existing industrial and office premises, demolition of boundary wall and railings, removal of existing telecoms mast, and the construction of a discount foodstore (c. 1743 sq.m gross floor area and c.1286 nett main sales area) comprising of a single storey pitched roof structure with enclosed dock leveller removable compactor, new boundary treatments and associated site development works, to provide 163 No. car parking spaces and for the provision of revised vehicular entrance, 1 No. free standing double sided, internally illuminated flagpole sign, 2 no. building mounted internally illuminated signs.
15, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10.
A single storey extension with a flat roof and an enclosed external plant area adjoining the proposed extension, finished with materials consistent with the existing store, internal modifications / connections to the existing store and all associated site works located to the eastern side of the Lidl licensed discount foodstore (1,648sq.m.) on a site of 0.75 hectares. The extension measures 104sq.m. gross floor space increasing the gross floor space of the overall building from 1648sq.m. to 1752sq.m.
Lidl Store, 15, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?