← Back to search

Unit 16A, Cherry Orchard Industrial Estate, Ballyfermot, Dublin, 10

Grant Permission for Retention

Planning application SD16A/0272

Dublin - South Dublin County Council

Proposed Development

Retention for the change of used of part of an existing warehouse from warehouse to builders’ provider retail sales area. Retention is also sought for the change of use from open yard to ancillary open storage yard and retention of a security hut in the yard and all ancillary works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    29 Jul 2016

  2. Decision: Grant Permission for Retention

    21 Sept 2016

  3. Decision due

    22 Sept 2016

  4. Grant issued

    28 Oct 2016

Application Details

Location
Unit 16A, Cherry Orchard Industrial Estate, Ballyfermot, Dublin, 10
Applicant
N/A
Application Type
Retention
Planning Authority
South Dublin County Council
Eircode
10
Site Area
5490 ha
Floor Area
491.7 sq m

Timeline

Registration Date
29 July 2016
Status
Decision
Decision
Grant Permission for Retention
Decision Date
21 September 2016
Grant Date
28 October 2016

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

21m
SD10A/0243Granted17 Aug 2010

Additional warehouse space as an extension to the south of the existing warehouse; additional office space as an extension to the existing office building at the ground and first floors (to east of warehouse and north of office building) and one additional storey of accommodation above the existing two storey office building and extension; railings and gates as a boundary to the road; and ancillary works above and below ground to facilitate the development.

Unit 16, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10

34m
ED15/0028Declared Not Exempt18 Aug 2015

Whether the subdivision of Unit No. 16 into two separate units is development and whether it is, or is not, exempted development, & whether a material change in use of part of Unit 16 has occurred where it is used by McMahon Builders Providers.

Unit 16, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10

48m
SD05A/0639Granted28 Jul 2005

The development will consist of a relocated / replacement Cellular Base Station comprising a 30-metre high concrete "bird cage" antennas support structure carrying 9 No. GSM antennas, 10 No. 0.6m diameter link dishes, 9 No. 0.3m diameter link dishes plus, a possible further 3 UMTS antennas and a possible 15 further link dishes ( 3 No. 1.2m diameter, 6 No. 0.6m diameer and 6 No. 0.3m diameter link dishes) with associated containerised equipment containers and security fencing to form part of the digital mobile communications network.

Unit 16, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10

48m
SD21A/0075Grant Permission for Retention29 Mar 2021

Retain 30 metre high telecommunications support structure carrying antennas and link drums/dishes and ground based equipment all enclosed in security fencing.

Unit 16, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10

48m
SD11A/0025Grant Permission for Retention2 Feb 2011

Retention of the existing 30 metre high telecommunications support structure carrying antennas and link drums/dishes and ground based equipment all enclosed in security fencing.

Unit 16, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10

67m
S99A/0508Granted23 Jul 1999

Warehouse extension to side, second floor office extension to front and security railings and gates around perimeter.

15 Cherry Orchard Industrial Estate, Dublin 10.

72m
ED09/0019Declared Exempt16 Jul 2009

1. Removal of existing diesel tank and external block bund area 2. Removal of small disused storage area beside tank 3. Insertion of CP6FR fuel retention seperator unit from Carlow Pre-Cast Ltd 4. Addition of new 9000 ltr bunded diesel tank and associated ground works.

16, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10

77m
SD03A/0873Granted24 Nov 2003

Demolition of existing industrial and offices premises, demolition of boundary wall and railings, for the construction of a discount foodstore (c. 1,732sq.m.) comprising of a single storey pitched roof structure with enclosed dock leveller and compactor, new boundary treatments and associated site development works, to provide 178 no. car parking spaces, and for the provision of revised vehicular entrance, 2 no. free standing double sided, internally illuminated signs, 2 no. building mounted internally illuminated signs.

15, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10.

78m
SD06A/0279Granted18 Apr 2006

Ancillary use of the retail area of the previously approved discount food-store, (Planning Ref. SD05A/0323) as off-licence.

Unit 15, Cherry Orchard Industrial Estate, Ballyfermot Road, Dublin 10

78m
SD05A/0323Granted29 Apr 2005

Demolition of existing industrial and offices premises, demolition of boundary wall and railings, removal of existing telecoms mast and the construction of a discount foodstore (c. 1,645sq.m. gross floor area and c. 1,286 nett main sales area) comprising of a single storey pitched roof structure with enclosed dock leveller removable compactor, new boundary treatments and associated site development works to provide 163 no. car parking spaces and for the provision of revised vehicular entrance, 1 no. free standing double sided, internally illuminated flagpole sign, 2 no. building mounted internally illuminated signs.

15, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?