UNIT 17, Mulcahy Keane Estate, Greenhills Road, Dublin 12

Granted

Planning application SD07A/0644

Dublin - South Dublin County Council

Proposed Development

Proposed partial new first floor with cladded finish to match existing cladding on Unit no. 17 to be used as office space.

View the full application file on the council's planning portal →

Application Timeline

  1. Further information requested

    1 Oct 2007

  2. Application received

    15 Feb 2008

  3. Further information received

    15 Feb 2008

  4. Decision due

    13 Mar 2008

  5. Decision: Grant Permission

    13 Mar 2008

  6. Grant issued

    23 Apr 2008

Application Details

Location
UNIT 17, Mulcahy Keane Estate, Greenhills Road, Dublin 12
Applicant
N/A
Application Type
Permission
Planning Authority
South Dublin County Council
Site Area
12960 ha
Floor Area
65.09 sq m

Timeline

Registration Date
15 February 2008
Status
Decision
Decision
Grant Permission
Decision Date
13 March 2008
Grant Date
23 April 2008

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

36m
SD07A/0645Granted15 Feb 2008

(1) Proposed new second floor to Units 15 & 16 with cladded finish & to be used as office space; (2) proposed extension to existing single storey entrance to be built up to 2nd floor roof level & to house new entrance & staircore; (3) proposed new ground floor partial front extension & entrance with flat roof over & glazed finish to front of Units 15 & 16.

Units 15 & 16, Mulcahy Keane Industrial Estate, Greenhills Road, Walkinstown, Dublin 12

37m
S00A/0415Granted6 Jul 2000

New external cladding and increased height with new second floor offices to front.

Units E & F, Greenhills Industrial Estate, Greenhills Road, Dublin 12.

37m
SD11A/0165Grant Permission for Retention15 Feb 2012

Retention of warehouse extension under previously approved loading bay roof at rear; external first to second floor escape stairs to side; replacement of flat roof over office with pitched roof to front and relocation of loading gate to side with canopy over.

Wilkins House, Unit E&F, Greenhills Industrial Estate, Greenhills Road, Dublin 12

61m
SD03A/0065Granted20 Aug 2003

Construction of a single-storey extension to the side and a two - and single storey extension to the front of the Industrial Unit, with a total floor area of 1103sq.m., and alterations to the front of the existing premises including new front canopies.

Unit 3, Greenhills Industrial Estate, Walkinstown, Dublin 12

62m
SD04A/0438Granted3 Sept 2004

Construction of a 2-storey front extension to the existing industrial unit consisting of a loading bay with offices over and a covered canopy at front; first floor offices over existing offices and new stairs at ground floor to serve these offices; first floor offices over previously approved ground floor offices (previous permission Reg. Ref. SD03A/0065) and alterations to previously approved front and side elevations; and new parking layout and railings at front of site; proposed extensions amount to 212 sq. m. to an existing/previously approved premises of 2,253 sq. m. floor area.

Unit 3, Greenhills Industrial Estate, Walkinstown, Dublin 12

73m
SD07A/0695Grant Permission & Grant Retention14 Aug 2007

Retention and completion of the restoration of existing fire damaged roof and side sheeting to existing building & full planning permission is sought for alterations to the front facade for the subdivision of the existing building into five separate units, for the provision of car parking facilities and connections into existing foul and surface water sewers and for all ancillary site works.

Unit 4 & 5, Mulcahy Keane Estate, Greenhills Road, Walkinstown, Dublin 12

73m
SD07A/0264Invalid - Site Notice12 Apr 2007

Restoration of existing fire damaged buildings, alterations to the front facade, the subdivision of existing buildings into five separate units, the provision of car parking facilities and connections into existing foul and surface water sewers and all ancillary site works.

Unit 4&5, Mulcahy Keane Industrial Estate, Walkinstown, Dublin, 12

75m
SD06A/0195Granted20 Mar 2006

Works to partially demolish the existing Northright roof structure (incorporating controlled removal and disposal of existing asbestos roof sheeting in accordance with the requirements of the Health & Safety Authority and the European Communities (Protection of Workers) (Exposure to Asbestos) Regulations 1989) and replace with duopitch roof structure.

Mulcahy Keane Industrial Estate, Greenhills Road, Walkinstown, Dublin 12.

80m
SD07A/0643Granted15 Feb 2008

(1) Proposed removal of existing roof of Unit 11; (2) proposed raising of existing walls with cladded structure & proposed construction of new roof at higher level than previous roof.

UNIT 11, Mulcahy Keane Estate, Greenhills Road, Dublin 12

80m
S01A/0155Granted16 Mar 2001

Division of industrial/warehouse unit into 2 units and new sign over front door at

Unit 264B, Greenhills Industrial Estate, Dublin 12.