260, Holly Road, Western Industrial Estate, Dublin 12
Grant Permission for RetentionPlanning application SD08A/0003
Dublin - South Dublin County Council
Proposed Development
Part change of use from warehouse to showroom at ground floor level to office accommodation at mezzanine floor above & associated works.
View the full application file on the council's planning portal →Application Timeline
Application received
2 Jan 2008
Decision due
26 Feb 2008
Decision: Grant Permission for Retention
26 Feb 2008
Grant issued
8 Apr 2008
Application Details
- Location
- 260, Holly Road, Western Industrial Estate, Dublin 12
- Applicant
- N/A
- Application Type
- Retention
- Planning Authority
- South Dublin County Council
- Site Area
- 12620 ha
- Floor Area
- 360.5 sq m
Timeline
- Registration Date
- 2 January 2008
- Status
- Decision
- Decision
- Grant Permission for Retention
- Decision Date
- 26 February 2008
- Grant Date
- 8 April 2008
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Alterations to existing front boundary fence to provide two gates for additional vehicular access.
Unit 260, Holly Road, Western Industrial Estate, Dublin 12
Sub-division of existing warehouse unit into four individual warehousing units with alterations to existing internal layout and alterations to the existing external elevations and inclusion of dock levellers and associated site works.
Unit 26, Holly Road, Western Industrial Estate, Dublin 12
Alterations to existing front boundary fence to provide two gates for additional vehicular access.
Unit 260, Holly Road, Western Industrial Estate, Dublin 12
The erection of a palisade fence on a 450mm height concrete plinth (total height = 2400mm) along the east side of the property, 1000mm inside the boundary line, with an electric fence (total height = 4000mm). Electric fence fixed to internal leaf of palisade fence. (1) The erection of an electric fence (total height = 4000mm) along the south side of the property, fixed to internal leaf of existing palisade fence (total height = 4000mm). The existing palisade fence is erected approximately 2000mm inside the boundary line. (2) The erection of an electric fence (total height = 4000mm) along part of the west side of the property, fixed to internal leaf of existing palisade fence (total height = 4000mm). (3) The erection of a palisade fence on a concrete plinth (total height - 2400mm) along the north side of the existing building, 1800mm in front of the building along which will incorporate 6 pedestrian turnstiles for pedestrian access and egress. (4) Replacement of 2 existing double leaf palisade gates with 4 sliding gates along the north elevation, at each end of the building. (5) The modification to the south elevation of the building to create 8 security vehicle access traps as per drawing. (6) The modification of the east elevation of the building, removal of 3 roller shutters and replacement with 5 windows at ground floor level. (7) 2 new escape doors to the south elevation. (8) Installation of 3 new windows at ground floor level on the south elevation at the south east corner. (9) Associated internal fit-out and security works. (10) Associated works. Note: The non-lethal, pulsed monitored electric fence is a deterrent to intrusion, fixed to internal leaf of each palisade fence with interim control system and warning signs every 10 metres or less and clear demarcation zone internally.
260, Holly Road, Western Industrial Estate, Dublin 12
20m monopole carrying 3 no. antennae, 4 no. radio link dishes, associated equipment, outdoor cabinets and fencing for a new 3G broadband network.
National Seals Systems, Unit 20, Western Industrial Estate, Dublin 12.
Extension to the side of an existing unit comprising of warehousing of 282sq.m. at ground level and 186sq.m. at mezzanine level, 4 additional car park spaces and new entrance gates and fencing to front.
Unit 222, Naas Road, Western Industrial Estate, Dublin 12.
Replacement of the existing perimeter steel fence with new knee wall and new painted perimeter steel fence along with the replacement and relocation of the existing manual swing opening gates with new electric operated sliding gate to existing yard entrance.
Unit 222, Holly Road, Western industrial estate, Dublin 12, D12KPY8
Demolition of the remaining fire damaged steel structure and the reconstruction of a single storey pitched roof commercial warehouse and office unit (378sq.m.) including roof lights; external signage; hard landscaping and for all site services above and below ground including connections to existing services.
203, Holly Road, Western Industrial Estate, Dublin 12
Proposed new business park development consisting of 3 levels of parking (21,673 m.sq.), 2 main blocks, of 5 storeys and 6 storeys of office space (29,968 m.sq.) with landscaped internal courtyards and roofscape, linked together with a central circulation tower housing cafe/ restaurant and creche to facilitate the office based industries ie. data processing, software development, information technology, technical and consulting, commercial laboratories/healthcare, research and development, publishing and telemarketing, with ancillary site development work, landscaping, new boundaries and entrance road from Holly Road.
M50/N7 Red Cow Roundabout with entrance from Holly Road.
Proposed extension to an existing warehouse development; consisting of the addition of 398sqm warehousing area being added to the Western elevation of the existing warehouse in a current disused yard area. The extended portion will have a clear internal height of 8m and a maximum external height of 9m, adjoining the existing building which has a maximum height of 6,85m. The existing building otherwise remains unaltered due to the addition of the side extension, including existing access and carparking arrangements.
Unit 270, Holly Road, Western Industrial Estate, Co. Dublin
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?